Transcription

1

2

3 1

4 2

5 3

6 Abbreviation EE&C TD DB/BM/GL Energy Efficiency and Conservation Technical Directory Database / Benchmark / Guideline ACE METI ECCJ ASEAN Center for Energy Ministry of Economy, Trade and Industry The Energy Conservation Center, Japan Cambodia MIME Ministry of Industry, Mines and Energy, Cambodia EE&S Office EDC Electricite du Cambodge DET Philippines DOE Department of Energy DOST Department of Science and Technology RE Renewal Energy MERALCO Manila Electric Company (Old Name: Manila Electric Railroad and Light Company) ECPH Energy Conservation for the Philippines ( ) FAS Factory Automation System WESM Wholesale Electricity Spot Market Indonesia MEMR Ministry of Energy and Mineral Resources DIP BIO Biotechnology PM Paper Machine PLN KONEBA PT Konservasi Energi Abadi (Persero) Brunei Darussalam DES Department of Electrical Services BHC Butra Heidelberg Cement Malaysia PTM Pusat Tenaga MalaysiaMalaysia 1

7 - 1 -

8 - 2 -

9 - 3 -

10 - 4 -

11

12

13 1

14 2

15 3

16 Original cloth Cutting Sewing Paper matrix Compressed air Electricity First inspection Lighting Putting on buttons fasteners 4 Water Ironing Steam Fuel oil Second inspection Labels & Packing Shipping

17 5

18 6

19 Productions (k Dozens) 2,000 1,500 1, Year 7

20 Fuel consumption (kl) Year 2004 Heavy oil Diesel oil Power consumption (MWh) 8 6,000 5,000 4,000 3,000 2,000 1, ,170 3,549 1,676 1, Year Fuel (L/Dozen) Electricity Fuel Year Electricity (kwh/dozen) EDC IPP

21 9

22 10

23 11

24 12

25 13

26 14

27 15

28 16

29 Original cloth (Knitting yarn) Dying & Washing Diesel oil Knitting & Linking First inspection Electricity Washing & Drying Lighting Putting on buttons fasteners 17 Water Ironing Steam Fuel oil Second inspection & Repair Ironing Labels & Packing Shipping

30 18

31 19

32 Productions (k pieces) 10,000 8,000 6,000 4,000 2, Year Fuel (KL) 1,500 1, Heavy oil Diesel oil Year Heavy oil (L/piece) Diesel oil Heavy oil Diesel oil (L/piece) Year

33 21

34 22

35 23

36 24

37 25

38 26

39 27

40 1

41 2

42 3

43 4

44 5

45 6

46 300 7

47 8

48 9

49 10

50 / 11

51 / 12

52 13

53 14

54 15

55 16

56 17

57 18

58 19

59 Heavy oil (L/t) Heavy oil Electricity Electricity (kwh/t) (to July) Year 20

60 21

61 22

62 23

63 24

64

65 26

66 27

67 28

68 29

69 1

70 5 10 US$0.5/L US$0.05/kWh 2

71 3

72 4

73 5

74 6

75 7

76 8

77 9

78 10

79 11

80 12

81 13

82 14

83 15

84 16

85 - 17

86 18

87 19

88 Production Boiler Aux. Facility Boiler Aux. Facility Boiler Aux. Facility Fan and Fan and Fan and 90t/h Pumps 90t/h Pumps 90t/h Pumps #1 Boiler #2 Boiler #3 Boiler Steam 50t/h 50t/h 50t/h 150t/h Turbine 20

89 91 90 Efficiency(%) Load Factor(%) 21

90 Items Present Improved Number of Units in Operation 3 2 Load Factor of the Boiler (%) Pumps and Fan Power Consumption Rate (%) 65* 90* Power Consumption per Unit (kw) Total power Consumption (kw) 1,375 1,269 (: ) 22

91 Pressure (P) S Surging point Mechanical vibration Narrow working region C Stonewall point Sharp decrease of pressure Air- flow (Q) Turbo type compressor: Base load operation Screw type compressor: Load/unload operation depends on demand Large volume air-demand Turbo Screw Screw (Base load) (Load) (Load/unload) Low volume air-demand Turbo Screw Screw (Load/unload) (Stop) Minimum volume air-demand Turbo Screw Screw (Stop) (Load/unload) (Stop) 23

92 Power 25,000 Consumption (kwh/d) 20,000 15,000 10,000 Vacant zone?? Day 2 Power Consumption in May and July on Suction Vane Control Around 70% Load/Unload Control Inverter Control Ideal Control Load Factor (%) 24

93 Power Consumption Vacant zone 1st M/C 2nd M/C Air flow 25

94 Power Consumption Power Saving Screw M/C Turbo M/C Screw M/C Air flow 26

95 Efficiency, Power factor, Current (%) Efficiency Power factor Current Load factor (%) 400V Efficiency (%) Motor Pump Fan Load factor (%) 27

96 701B Capacity Desigin Design Actual Actual/ Fan/Pump kw Volt. Amp. Amp. Design 1.FOP BFP 315 6, DFP FDF 315 6, Estimation of the Air leakage L: Air leakage (%) t1 L= 100 (%) t1+t Pressure ascent Small leakage Small leakage Large leakage Time (min) Pressure descent Pressure Change in Air Compressor t2 Setting pressure p1 = Specified pressure Working pressure range p1 p2 = 0.05~0.1MPa p2 = Specified pressure t2 28

97 29

98 High voltage line 6kV Static Condenser Low voltage line 380V M M S.C S.C P 200kW5 200kW 5 P 63kvar 5 63kvar5 30

99 31

100 32

101 33

102 34

103 800RT COP 35

104 110 Motor Power (%) Inlet Temp. of Cooling Water () Outlet Temp. of Chiller ()

105 Outlet Outlet Temperature() (ºC) Wet Wet Bulb Temperature (ºC) kW 37

106 -3-3 Material loss Energy loss Effective Energ y Energy loss Machine problems Trouble Waiting time Defect -3-3 Patal Grati 38

107 39

108 40

109 41

110 3 VIP Soekanar Ms. Maryam Dr. Weerawat 42

111 1

112 ODA ODA

113 3

114 4

115 5

116 6

117 7

118 8

119 Mill & related facilities 6.6kV 11kV 6.6kV 11kV MOF CB 7,500kVA Mill & related facilities 7,500kVA MOF 1,000kVA 380V Other facilities 750kVA 380V Other facilities 9

120 10

121 % Base pressure: 0.7MPaG Discharge pressure (MPa) 11

122 Compressor Pi Qi Pi Po P Pipe line Loss P Q Air power at terminal system Pressure loss Q Terminal system Po Qo Leakage loss 0 Qo Qi 12

123 Estimation of the Air leakage L: Air leakage (%) t1 L= 100 (%) t1+t Pressure ascent Small leakage Small leakage Large leakage Time (min) Pressure Change in Air Compressor t2 Setting pressure p1 = Specified pressure Working pressure range p1 p2 = 0.05~0.1MPa p2 = Specified pressure t2 Pressure descent 13

124 200HP Water at dew point (g/m 3 ) Compressor Dryer (Chiller type) Compressor yard Heatless dryer Dew point () Factory To M/C 14

125 15

126 Efficiency, Power factor, Current (%) Efficiency Power factor Current Load factor (%) 16

127 100.0 Efficiency (%) Motor Pump Fan Load factor (%) Capacity Design Design Actual Actual/ Motor kw Volt Amp Amp Design Mill motor , Separator Bag filter fan 400 6, Suction damper Speed control Damper Ideal curve Air Flow (%) 17

128 18

129 19

130 20

131 21

132 22

133 Circular Plate Direction of the rotation Mark 23

134 24

135 Time (hour) 25

136 Energy Consumption fixed Energy Consumption changing fixed Production 26 Production

137 Plan: To find the loss and waste of energy consumption and find countermeasures to minimize them. Do: Carry out the countermeasures Energy audit Check: Evaluate the result Action: Reform the process Making Improving improvements through PDCA using the cycle PDCA cycle Efficiency (%) Motor Fan Pump Load factor (%) 27

138 % Base pressure: 0.7MPaG Discharge pressure (MPa) 28

139 Load Unload 29

140 30

141 31

142 32

143 33

144 34

145 - 1

146 - 2

147 Country Brunei Cambodia Indonesia Philippines Items Time Dec Aug DEC. 512 Aug. 29Sep.2 Cement & Food 3 Garment Pulp/Paper and 2 Rolling Mill 1. Follow-up / Energy Audit Processing Factories Factories Textile Factories Factories 2. Seminar-Workshop Brunei - MOE Cambodia-MIME ACE Philippines - DOE 1) EE&C Policy ACE ECCJ ECCJ ECCJ Cement (Brunei) Brunei - BHC Ceramics (Vietnam) Vietnam - MOI Vietnam - MOI Vietnam - MOI Chemical (Caustic Soda) Philippines - (Thailand) R.I. Chemicals Co. Garment (Cambodia) F-up: MIME/ECCJ Malaysia - PTM Food (Singapore) Philippines- URC F-up: DOE/ECCJ Iron/Steel (Philippines) (ECCJ) Philippines - DOE Malaysia - PTM Oil Refinery (Myanmar) Power (Lao PDR) (ECCJ) Lao PDR-MIH Lao PDR-MIH Power - DOE Pulp/Paper (Indonesia) Indonesia - Indonesia - Indonesia - Indonesia - PT Kertas Leces PT Kertas Leces PT Kertas Leces PT Kertas Leces Textile (Malaysia) Malaysia -PTM Malaysia -PTM Glass-Malaysia Glass-Malaysia Glass - Malaysia Other Industries Co-Gene & ESCO - Thailand 1) 1) What are are the the Barriers & Measures & for the on the Implementation of EE of & EE&C C [ECCJ] [ECCJ] 3) Way Forward 2) Development of of Technical Directory, Directory, DB/BM/GL DB/BM/GL for Industry for Industry [ECCJ &[ECCJ ACE] & ACE] 2) EE&C Activities - 3

148 - 4

149 - 5

150 Item Items Numbers Numbers and and Ratio Ratio (%) (%) Country Company Name (Industry) Recommended Finished Under Nonactivitlmented Not Imp- by ECCJ or Studied Study Brunei Butra Heidelberg Cement (Cement Industry) 83% 0% 17% M&V International Mfg (Garment Industry) 67% 0% 33% Cambodia June Textile Co. Ltd (Garment Industry) 3 67% 0% 33% Indonesia PT KERTAS LECES (Pulp/Paper Industry) 100% 0% 0% Philippines Steel Asia Mfg. Corp (Iron/Steel Industry) 50% 25% 25% Vietnam Hai Duong Porcelain Co (Ceramics Industry) 91% 0% 9% Lao PDR Num Ngum Hydropower Plant (Power Industry) 100% 0% 0% Arab-Malaysia D. B Malaysia 9 (Textile Industry) 44% 56% 0% Mann Thanbayakan Myanmar 4 (Oil Refinery) 50% 50% 0% Total (83.3%) 8 (10.3%) 5 (6.4%) (2004) only (64.5%) 7 (11.3%) 15 (24.2%) Presentation - 6

151 Country Industry EE&C Activities Food Industry 1. Installation of economizers on LP boilers 2. Waste heat recovery from hot water boilers (Edible Oil Refinery) 3. Process oil cooling by cold feed water 4. Condensate collection system Total fuel saving = 116,703GJ/y (=Approx. 2,920kL/y) Malaysia Iron/Steel Industry 1. 2-stage recuperator (Recovery of flue gas temp.) 2. Air compressor change, from piston type to Capacity: screw type: Power saving = 45% EAF: 700kt/y, 3. VSD for rolling mill cooling water pump process Mill: 550kt/y Power saving = 25% compared to throttle valve Power saving = 1.7%, Fuel saving = 13.7% Total cost reduction = 3% Chemical Industry Change the 200RT refrigeration system from a vapor RI Chemical Corp. compression type to a vapor absorption type, wherever there is waste heat and a need for chilled water. Effect on productivity: +3.6% Philippines Iron/Steel Industry Introduction of outline of Philippines steel industry (By DOE) and 2005 Don Emilio Abello EE Awards [Rolling Mill Co. saved 580kL/y of fuel oil by heat recovery from the furnace, etc. and Steel sheet coating Co. saved 107kL/y of oil] Porcelain Industry Significant percentage improvement after 2004 follow up. (By MOI) Similar presentation at last Summary-Workshop Brick Industry Energy audit at brick factory: Fuel saving = 3%. Vietnam (By MOI) Power saving = 13% by insulation strengthening, etc. Energy Audits at 12 Main measures identified by audit: industrial factories VSD, boiler improvements, condensate collection (By Institute of system, maintenance method, compressed air Energy) system, etc. Saving: Fuel = 0~38%. Power = 5~40% - 7

152 - 8

153 - 9

154 Year Activities Month Preparation of Detailed (1) Implementation Plan & Preparation for 1st Site Activity Two 1st Site Activity (Follow-up Countries (2) Survey & Workshop (2 Countries)) Analyses of 1st Site Activity (3) Results / Preparation for 2nd Site Activity Two 2nd Site Activity (Follow-up Countries (4) Survey & Workshop (2 Countries)) Analyses of 2nd Site Activity (5) Results / Preparation for 3rd Site Activity 3rd Site Activity (S & P- (6) Workshop, TD disemmination & DB/BM/GL formulation) (7) Report Writing OJT ASEAN ECCJ ECCJACE OJT ECCJ ECCJACE - 10

155 6 JETROECCJ 46 1 ACEECCJ - 11

156 Database / Benchmarking / Guideline Database Database ECCJ Database - 12

157 ECCJ ACE ASEAN Database Database ASEAN - 13

158 ECCJ Schedule 1

159 2