Similar documents
alternating current component and two transient components. Both transient components are direct currents at starting of the motor and are sinusoidal

Development of Induction and Exhaust Systems for Third-Era Honda Formula One Engines Induction and exhaust systems determine the amount of air intake

untitled

Microsoft Word - PCM TL-Ed.4.4(特定電気用品適合性検査申込のご案内)

OPA134/2134/4134('98.03)

音響部品アクセサリ本文(AC06)PDF (Page 16)

Table 1. Assumed performance of a water electrol ysis plant. Fig. 1. Structure of a proposed power generation system utilizing waste heat from factori

xEffect_SG_MV_Part2_E_xEffect_SG_MV_E

Options Unit : mm Finger guards Color Model Surface treatment Nickel-chrome plating silver DC Fan 4mm Air Flo

03-03 Bush Mentori.pdf


How to read the marks and remarks used in this parts book. Section 1 : Explanation of Code Use In MRK Column OO : Interchangeable between the new part

How to read the marks and remarks used in this parts book. Section 1 : Explanation of Code Use In MRK Column OO : Interchangeable between the new part


How to read the marks and remarks used in this parts book. Section 1 : Explanation of Code Use In MRK Column OO : Interchangeable between the new part

Microsoft PowerPoint - datatel Presentation Wind Power Testing V01.ppt


How to read the marks and remarks used in this parts book. Section 1 : Explanation of Code Use In MRK Column OO : Interchangeable between the new part

UL 746A 第 6 版の短期特性評価に関する規格について 2016 年 4 月 29 日付で比較トラッキング指数試験 (CTI) 傾斜面トラッキング試験 (IPT) 及びホットワイヤー着火試験 (HWI) について一部改定がありました 以下 参考和訳をご参照ください なお 参考和訳と原文 ( 英


K02LE indd


Tab 5, 11 Tab 4, 10, Tab 3, 9, 15Tab 2, 8, 14 Tab 1, 7, 13 2

I N S T R U M E N T A T I O N & E L E C T R I C A L E Q U I P M E N T STW Symbol Symbol otary switch) 05 otary switch Symbol angle of notch 181

cms.pdf

九州大学学術情報リポジトリ Kyushu University Institutional Repository 看護師の勤務体制による睡眠実態についての調査 岩下, 智香九州大学医学部保健学科看護学専攻 出版情報 : 九州大学医学部保健学


浜松医科大学紀要

Fig. 3 Coordinate system and notation Fig. 1 The hydrodynamic force and wave measured system Fig. 2 Apparatus of model testing

Options(Unit : mm) Finger guards Model :19-139E :19-139H 53 Surface treatment :Nickel-chrome plating (silver) :Cation electropainting (black) Inlet si

untitled

エレクトーンのお客様向けiPhone/iPad接続マニュアル

Fig, 1. Waveform of the short-circuit current peculiar to a metal. Fig. 2. Waveform of arc short-circuit current. 398 T. IEE Japan, Vol. 113-B, No. 4,

4.1 % 7.5 %


Fig. 1 Schematic construction of a PWS vehicle Fig. 2 Main power circuit of an inverter system for two motors drive

XFEL/SPring-8

1 2 3

How to read the marks and remarks used in this parts book. Section 1 : Explanation of Code Use In MRK Column OO : Interchangeable between the new part

On the nitrogen cycle and cultivable capacity of fish in the balanced aquarium By Aritsune SAEKI

LC304_manual.ai

LM35 高精度・摂氏直読温度センサIC

内蔵ハードディスクユニット-20GB (PG-HD2E4H) 内蔵ハードディスクユニット-40GB (PG-HD4E4H)取扱説明書 HARD DISK DRIVE 20GB(PG-HD2E4H) HARD DISK DRIVE 40GB(PG-HD4E4H) USER'S GUIDE

Abstract This paper concerns with a method of dynamic image cognition. Our image cognition method has two distinguished features. One is that the imag

クイックスタートガイド [SC-06D]

00_1512_SLIMLINE_BOOK.indb

FG/FCG Pressure-Temperature Compensated Flow Control Valves, Tokyo Keiki Inc.


mobicom.dvi

Microsoft Word - ■50_TRIAS_08-R docx

WARNING To reduce the risk of fire or electric shock,do not expose this apparatus to rain or moisture. To avoid electrical shock, do not open the cabi

WE WESB WENB WESNB 428

インターネット接続ガイド v110

LM150/LM350A/LM350 3A 可変型レギュレータ

Microsoft Word - triplexxx.doc

206“ƒŁ\”ƒ-fl_“H„¤‰ZŁñ

L3 Japanese (90570) 2008

Fig. 1 Hydrostatic Thrust Bearing Fig. 2 Point loading of elastic half-space

MIDI_IO.book

台紙.indd


On the Wireless Beam of Short Electric Waves. (VII) (A New Electric Wave Projector.) By S. UDA, Member (Tohoku Imperial University.) Abstract. A new e

429

IPSJ SIG Technical Report Vol.2016-CE-137 No /12/ e β /α α β β / α A judgment method of difficulty of task for a learner using simple


PC_14ZY6_BFT150A_US_ indd

iPhone/iPad接続マニュアル

Vol. 51 No (2000) Thermo-Physiological Responses of the Foot under C Thermal Conditions Fusako IWASAKI, Yuri NANAMEKI,* Tomoko KOSHIB


ScanFront300/300P セットアップガイド

Airflow - Static Pressure Characteristics DC % 6% % Airflow 風量 PWM PWMDuty デューティ Cycle %

Web Stamps 96 KJ Stamps Web Vol 8, No 1, 2004

JIS A 5308 a1 moll moll moll (JP) REAGENT CHEMICALS ninth edition ACS SPECIFICATIONS Replication Duplicate standardiz

MFS 2B 2.5B 3.5B OB NO NB 3,000

”R„`‚å−w‰IŠv†^›¡‚g‡¾‡¯.ren

I N S T R U M E N T A T I O N & E L E C T R I C A L E Q U I P M E N T Pressure-resistant gasket type retreat method effective bulk compressibility Fro


m m Satoshi SATO 48

西川町広報誌NETWORKにしかわ2011年1月号

TH-47LFX60 / TH-47LFX6N

燃焼圧センサ

- 1 -

Physical and Psychological Effects of Stressors in Female College Students Reizou Mita*1, Konosuke Tomabechi*1, Isao Yamaguchi*1, Naoko Soeno*1, Shuhe

MLA8取扱説明書

LMC6022 Low Power CMOS Dual Operational Amplifier (jp)

国土技術政策総合研究所 研究資料

OPA277/2277/4277 (2000.1)

2

2

2

Air Flow - Static Pressure Characteristics PWM Duty Cycle % 1% 5% CRA312P4K

untitled

ScanFront 220/220P 取扱説明書

ScanFront 220/220P セットアップガイド


™…

2


24 Depth scaling of binocular stereopsis by observer s own movements

チョークコイル・リアクタ

Transcription:

5 11 3

1....1 2. 5...4 (1)...5...6...7...17...22 (2)...70...71...72...77...82 (3)...85...86...87...92...97 (4)...101...102...103...112...117 (5)...121...122...123...125...128

1.

10 Web Web WG 5 4 5 ² / / 1-1

1-1 1-1 WG Web 11 12 Web

2. 5

Web v ² v ² 21 v * -. ² ² v

Q & A

*1 *2 *2: *1: *3 *3:

(

*4 *4:

φ φ

SHOP TEST PROCEDURE FOR MARINE DIESEL GENERATOR ENGINE (Manufacturer s name) SHIP No. TYPE LIST No. DATE DRAWN BY CHECKED BY APPROVED BY REVISION

1. Items of the shop trial 1-1) Inspected by owner and/or shipyard with MANUFACTURER. Load test 100 %..60 min. Protective device test of emergency trip 1-2) Inspected by MANUFACTURER, data is to be submitted. Load test 25 %..20 min. 50 %..20 min. 75 %..20 min. 110 %..20 min. Starting test Protective device test of pre-alarm Generator characteristics test Governor test Parallel running test Bearing temperature measurement Measurement of deflection Torsional vibration measurement (For the first installation) Special requirements by owner Special requirements by shipyard 2. Engine running inspection This shop trial shall be carried out upon coupling the diesel engine with generator according to the following procedure, with reference to the rated generator output. Fuel oil and lubricating oil to be used in the test are as follows; Fuel oil : Marine diesel oil Lub. oil : SAE No. 30 grade 2-1) Measurement of deflection The deflection shall be measured before the engine running. 2-2) Starting test Starting performance test shall made by use of the accessory air reservoir or our air tank for testing. Measuring points are, Air reservoir capacity Initial and after engine starting air pressure

Room temperature before starting test Number of times engine starts Lowest air pressure at which engine will start 2-3) Load test Water resistance is used to load the engine (Power factor is 1.0). The load test shall be made with the engine at a constant speed. Measuring points are, Engine speed and output (kw) Fuel oil consumption (by facility of plant) Rack position of common rod Cooling water pressure Lub. oil pressure (Position : Inlet and turbo charger inlet) Boost air pressure Fuel oil pressure Room temperature Lub. Oil temperature (Position : Inlet and outlet of lub. oil cooler) Cooling water temperature (Position : Inlet and outlet and turbo charger outlet) Exhaust gas temperature (Position : Outlet of each cylinder and Inlet of turbo charger) Boost air temperature Fuel oil temperature Generator bearing pressure Generator bearing temperature 2-4) Governor test Instant and permanent speed regulations shall be measured respectively by rapidly changing the load of the engine to 100% 0% and 0 % ( ) % ( ) % 100 % The measurement shall be made by use of the cycle meter. Measuring items are, Instant and stabilized frequency Stabilized time 2-5) Generator parallel running test (only in case of more than two units) After fixed the generator frequency and voltage at 75% load, the load is gradually changed without adjustment, as follows; 75% 100% 80% 60% 40% 20% 40% 60%80% 100%75% Measuring items are, Output(kW) of the each engine and frequency (Hz), voltage (V) at each load In case of three units, the parallel running test for all units shall be made at one time, and test for

every two units shall not be made. 2-6) Protecting device test Working test for engine protecting device will be made for items referred to approved drawings. Measuring items are, Over speed trip Lub. oil low pressure trip Cooling fresh water high temperature trip if attached Lub. oil low pressure alarm.inspected by MANUFACTURER Cooling fresh water high temperature alarm.inspected by MANUFACTURER 2-7) Bearing temperature measurement Measuring items after load test are, Main bearing Crank pin bearing 2-8) Compression and maximum pressure measurement Measuring items are, Compression pressure of each cylinder Maximum pressure of each cylinder at 25,50,75,100,100 % load 2-9) Generator load characteristic test After fixed the generator frequency and voltage at the rated value, the load is gradually changed without adjustment, as follows; 100% 75% 50% 25% 0% 25% 50% 75% 100%110% 100% Measuring items are, Frequency (Hz) and voltage (V) at each load 2-9) Measurement of torsional vibration The torsional vibration test result for the same type of diesel generator set shall be submitted, otherwise shall be measured on one engine only. Special requirements by owner Special requirements by shipyard - The end -

Web v ² v v v v ² 21 v v * v - v ² ²

Q & A Q&A

*1 *2 *1: *2:

*1 *1:

Web v v ² v v v ² 21 v v * * - v v ² ² v

Q & A Q&A

*

Web v ² v v v v ² 21 v * - v ² ²

Q & A

( AWWF

Web v v v ² v v v v ² 21 v v v - v ² ² v

Q&A

*2 *1 *1: *2:

5 105-0001 TEL 03-3502-1828 FAX 03-3502-2033 ISBN-4-916148-74-6