No. J R 03-244
15 320 426 15 7 28 8 9 15 8
15 3 15 8 6 15 8
5 MAK-IV 2001 9 x 5 4 5 1 1,2 3
20kV (DT-1) 315kVA EDTL
(2002 5 ) GDP GDP EDTL 2002 CFET EDTL ( 2002 1 12 ) EDTL 2003 3
9 80 GDP US$4522001 14,000m 2 2002 5 20 2002 90 GDP 2.5 2002 Ministry of Transport, Communications and Public WorksMTCPW Electricidade De Timor Leste EDTL 1999 8 7 2002 2007 ) JICA i
2003 3 19 4 27 JICA 2003 7 27 8 10 A. 5 (1) 4 MW1 (2) 1) 2) 3) 4) 5) 6) 7) (3) 1) 2) 3) 4) 5) (500 kva, 20 kv/400-230 V) 6) 6.3kV 7) 6.3kV (4) 1) (5 MVA, 20/6.3 kv) 2) 20 kv 3) 20 kv 4) 5) 20 kv 6) (5) 1) 2) (6) 1) 2) (7) 2 (8) OJT OJT ii
B. 20kV (1) (2) (3) 2 2 (4) 2 (5) OJT OJT 7.65 7.62 300 20 EDTL EDTL JICA 135,000 EDTL EDTL 0.16 US$kWh 52 iii
80% (BHN) EDTL 2008 iv
13
2000 2001 2002 2003 2004 2005 2006 2007 321.2 389.3 370.6 345.2 357.4 382.5 417.3 454.9 2.0 28.4 31.4 42.6 53.4 98.8 101.7 126.7 154.2 258.2 260.9 180.7 146.7 106.1 85.0 85.0 156.2 286.6 292.3 223.3 200.1 204.9 186.7 211.7 156.2 287.5 289.3 222.2 193.5 180.7 188.3 196.6 0-0.9 3.0 1.1 6.6 24.2-1.6 15.1 2000 2001 2002 2003 2004 2005 2006 2007 25.9 25.3 26.5 28.1 29.3 30.2 30.7 31.0 1.0 0.9 0.9 0.9 1.0 1.0 1.0 1.0 2.7 2.4 2.5 2.7 2.8 2.9 2.9 2.9 0.8 0.8 0.8 0.8 0.8 0.9 0.9 0.9 14.3 13.3 13.3 13.5 13.8 14.2 14.6 14.8 7.8 7.7 7.4 7.2 7.3 7.5 7.8 7.8 7.2 6.9 6.7 6.5 6.7 6.9 7.2 7.3 6.6 6.4 6.3 6.1 6.2 6.4 6.6 6.6 33.7 36.4 35.6 34.2 32.1 30.0 28.4 27.7
No. () 20kV 1 Ainaro Ainaro 3 x 300 kw 2 Gleno Ermera 3 x 300 kw 3 Balibo Bobonaro 1 x 50 kw 4 Batugade Bobonaro 1 x 100 kw 5 Betano Manufahi 1 x 100 kw 6 Bobonaro Bobonaro 1 x 50 kw 7 Lequidoe Aileu 1 x 100 kw 8 Lolotoe Bobonaro 1 x 100 kw 9 Manelima Manatuto 1 x 50 kw 10 Maubisse Ainaro 2 x 100 kw 11 Nitibe (Bobomedo) Oecussi 1 x 50 kw 12 Oesilo (Boboneto) Oecussi 1 x 50 kw 13 Passabe Oecussi 1 x 50 kw 14 Turisxai Manufahi 1 x 50 kw 200212 UNOPS
Virgilio Guterres) (Inacio de Jesus Leite) (Lucas Soares) Staff: (Helio Ximenes) Staff: 26 (A. Guterres) Staff: 2 (D. Bonaparte) Staff: 109 (J. F. de (Jose Fernandes) Chantcel) Staff: 48 Staff: 19 (2003
- 625-855 -789-1,030 0-740 -494-816 - 417 417 417 417 417 417 417 417 417 3,750 253 184 132 214 294 124 196 101 215 1,713 597 1,664 67 2,422 44 864 27 595 976 7,256 968 0 0 1,968 780 0 79 172 78 4,044 625-855 -789-1,030 0-740 -494-816 -1,500-1,500
2003-2007 2002-03 2003-04 2004-05 2005-06 2006-07 4 312 560 565 565 565 2,255 8,560 12,338 12,776 12,754 11,549 49,417 8,035 8,778 9,000 9,000 9,000 35,778 0 2,000 2,200 2,200 2,200 8,600 110 1,220 1,220 1,220 20 3,680 415 340 356 334 329 1,359 172 1,316 931 825 880 3,952 0 400 400 400 400 1,600 0 200 110 80 80 470 0 440 300 250 200 1,190 172 276 121 95 200 692 9,044 14,214 14,272 14,144 12,994 55,624
1 Mak-I 2001.5.312001.8.30 2.5 MW (1984) 2001.12.022001.12.15 2003.5 10,000 UNOPS 2 Mak-II 2001.2.142001.5.14 2001.12.14 2.5 MW (1984) 2001.11.172001.12.01 2002.6.152002.11.15 10,000 UNOPS 3 2001.4.082001.5.30 2001.2.278.08 3.0MW (1989) 2001.9.072001.11.02 2003.5 10,000 UNOPS 4 Mak-III 2001.1.162001.1.18 2.8 MW (1994) 2001.10.152001.11.14 2003.4.01( ) 10,000 UNOPS 5 Mak-IV 2001.9.01 2.8 MW (1995) 2001.10.152001.11.15 2001.11.012001.11.30 ( ) EDTL 2003 3 2-1-8 (kw) No. (V) (rpm) 1 1984 MAK (I) 6,300 600 2,540 1,800 2 1984 MAK (II) 6,300 600 2,540 2,000 3 1989 Niigata 6,300 429 3,000 2,700 4 1994 MAK (III) 6,300 600 2,800 2,500 5 1995 MAK (IV) 6,300 600 2,800-6 2001 CUMMINS 400 1,500 1,005 900 7 2001 CUMMINS 400 1,500 1,005 900 8 2002 CUMMINS 400 1,500 1,005 950 9 2002 CUMMINS 400 1,500 1,005 950 10 2002 CUMMINS 400 1,500 1,005 950 11 2002 CUMMINS 400 1,500 1,005 950 12 2002 CUMMINS 400 1,500 1,005 950 13 2002 CUMMINS 400 1,500 1,005 950 22,680 16,500
5 (MAK-IV)2001 9 4 9.0MW EDTL ( ) 6 9 1 1 6.3MW 2003 8MW 23 20 kv 400/230V 1999 150% 20kV 400/230V ABC 20 kv 20km 12km 110 km 0.9 2-1-9 6 30% EDTL 40
(kva) 1,340 12 0 0 3 3,790 33 0 3 2 2,920 19 1 1 3 8,675 64 2 3 8 2,250 19 1 0 1 2,010 24 1 1 4 ( 400 2 0 0 0 ) 21,385 173 8 8 21 EDTL 9 13 3 28 4 21 9 13-9 3 10 EDTL EDTL 6 UNOPS 2003 4 EDTL 3 2003 8 4
2 5 1,440 km 4,900 km 6 m 1 60 % 20 km 10 1999 13
1 2 3 4 5 6 7 8 9 10 11 12 30.9 30.7 30.6 30.7 30.7 30.1 29.1 29.4 29.9 30.9 31.6 31.3 30.5 24.0 24.0 23.8 23.2 22.7 21.4 20.0 19.8 20.6 21.7 23.6 24.1 22.4 27.5 27.4 27.2 27.0 26.7 25.8 24.6 24.6 25.3 26.3 27.6 27.7 26.5 1 2 3 4 5 6 7 8 9 10 11 12 17m 76 77 76 67 68 65 61 60 63 67 70 72 69 527m 90 91 87 80 80 75 72 68 67 66 73 84 78 46m 80 81 79 81 83 83 82 88 80 74 74 75 80 71m 74 75 74 72 77 78 75 74 71 67 67 72 73 1,160m 85 86 84 79 79 75 76 74 68 69 77 81 78 809m 79 85 84 70 77 82 76 69 58 68 74 81 75
mm 1 2 3 4 5 6 7 8 9 10 11 12 4m 139 135 149 90 83 60 32 27 23 35 70 149 992 1953-1999 400m 191 191 173 242 205 344 180 54 28 17 88 165 1,878 1953-1974 875m 360 480 440 277 126 67 43 16 20 31 161 300 2,321 1956-1974 350m 340 368 382 215 281 223 150 28 33 55 195 329 2,599 1957-1974 809m 309 361 350 267 210 121 90 49 48 92 295 462 2,654 1952-1974 1,908m 453 404 315 194 166 87 42 23 11 50 196 342 2,283 1957-1975 650m 317 349 244 237 376 211 108 21 41 59 141 254 2,358 1958-1974 1,200m 390 403 325 146 118 28 23 13 15 53 180 330 2,024 1957-1974 375m 363 387 154 82 59 29 12 10 22 46 130 246 1,540 1955-1974 108m 198 168 128 123 153 103 89 37 16 23 88 192 1,318 1953-1976 25m 214 180 160 138 165 112 62 44 35 39 95 201 1,445 1956-1974
(IEC) (ISO) (JIS) (JEC) (JEM) (JEAC) (JCS) (AIJ)
-8 2030% i) 2008 (16,700 MW) 20% 3,840 kw(16,700 kw x 0.2 x 1.15 (*) ) 30% 5,760 kw(16,700 kw x 0.3 x 1.15 (*) ) (*1) 1.15 ii) 2002 12.7
3.2 MW4.5 MW 4.0 MW
2008 16.7MW 1.6MW
JICA
8 90 8 18
(a) (b) (c) 2