RFP : ( 1 )(RFP) RFP (TE, test engineer)(cc, Commissioning coordinator) RFP (CP)(CA) 2 TE CC. : :, 5 PM () CP. CP/ () () m2 1. 2 (CA, Commissioning Authority) (CP, Commissioning Provider)(.). CA Request for Commissioning Services J_CA_RFP[1].doc, PECI(J) / BSCA 08/12/08 1
RFP_CA RFP 3 () RFP RFP CP 4 CA CP CP (construction manager, CM) 5 CP RFP 3 4 (Quality Control) 3 FRP Construction Documents Contract Documents()( 1 ) 4 warrantee guarantee 5 (Construction Manager, CM) CM Request for Commissioning Services J_CA_RFP[1].doc, PECI (J) / BSCA 08/12/08 2
RFP_CA RFP 1. 2. 3. (PM, Project Manager) 6 4. (OO) 7 RFP 5. 8 CP /() [] OO RFP CP 1 4 1. 2. 3. 1 () 9 4. 5. 6. 1) (USDOE/FEMP PECI) 2) (The HVAC Commissioning Process, ASHRAE Guideline 1-1996)PECI http://www.peci.org 6 (Project Manager, PM) 7 (Owner s Objectives) OPR( Owner s Project Requirements )OO 8 9 Review Request for Commissioning Services J_CA_RFP[1].doc, PECI (J) / BSCA 08/12/08 3
RFP_CA ASHRAE ASHRAE 404-636-8400 () 10 7. CP 11 1. RFP 1. 2. 3. CM 4. 5. 6. (O&M) 7. A/E() 8. 9. 10. 10 (Construction checklist)ashrae () 11 Request for Commissioning Services J_CA_RFP[1].doc, PECI (J) / BSCA 08/12/08 4
RFP_CA 11. 12. 13. HVAC 14. 15. 12 16. 17. 18. (BEMS) (CM) 19. 20. ( ) CP HVAC CA BEMS 21. 22. (issue log) CM CM 23. 24. 25. O&M 26. 12 (observation).. Request for Commissioning Services J_CA_RFP[1].doc, PECI (J) / BSCA 08/12/08 5
RFP_CA A. CP 1 2 3 4 5 B. C. (issue log) O&M 27. () () CP CP CP CP CP CP CP CP 13 1. () O&M 2. 10 12 14 O&M RFP 13 1. 14 12.. Request for Commissioning Services J_CA_RFP[1].doc, PECI (J) / BSCA 08/12/08 6
RFP_CA a. b. RFP c. RFP () 1. BABEMS 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. () 15. 16. 17. 18. 19. 20. 21. RFP HVAC (CA) m2 3 CP HVAC 5 O&M PE () CP 15 15 CP CA Request for Commissioning Services J_CA_RFP[1].doc, PECI (J) / BSCA 08/12/08 7
RFP_CA CP CP RFP [] 1. 15 5 2. 3. Commissioning Firm Experience Commissioning Task Listing 4, 5 5 4 4. 5. CP () 16 6. 7. a) b) c) O&M d) e) f) g) h) PM,CM i) RFP CP 8. 16 regume 8
RFP_CA 9. CA a) b) c) RFP (fixed lump-sum proposal) 10. RFP (rate proposal) 11. ( )() RFP RFP (Pre-Design) 12. RFP RFP 13. () 3, 5:00pm [FAX ] 9
RFP_CA 1 (OO) 2 3 4 1 2 () 3 4 5 (O&M) 6 7 8 () 2 3 CA 10
RFP_CA 1 RFP CP(commissioning provider) Key: SD: (Schematic Design) DD: (Design Development) CD1: (Contract Document) #1 CD2: (Contract Document) #2 SD DD CD1 CD2 (ensure) 2 HVAC () ( 3 IAQ (landscape) (integrity) (assemblies) (IEQ) 11
RFP_CA (EXHIBIT) 2 CP () HVAC BEMS BEMS (P/T) (P/T) VAV VAV 12
RFP_CA 3 (IAQ) RFP (ASHRAE Standard 62-1989, Ventilation for Acceptable Air Quality and Standard 55-1992 Thermal Environmental Conditions for Human Occupancy) IAQ OO VAV () (Manufacturer s Safety Data Sheet, MSDS) IAQ 13
RFP_CA 4 Fax E-Mail % () BEMS () / 14
RFP_CA / 15
RFP_CA (EXHIBIT) 5 / EMS CA CA X S /. () / CP CP CP 16
RFP_CA 6 : : / BEMS O&M O&M CA CA CA CA CA CA Commissioning Tasks Performed Management (Enter "X" if by own firm, "S" if by Subconsultant). () () O& M CA CA CA 17