COSEEASE STAGE GQM NAIST-IS-TR2007005, March 2007 1
2
etc. etc. () etc. 3
CVS Ver0.1 Ver0.N Ver1.0 N Ver0.1 Excel Ver0.N 4
DiffDoc) = = = 5
(DiffDoc) 6
Ver1,1 Ver1.2 Ver1.1Ver1.2 7
() etc. etc. () 8
B () -0.251 0.148 0.302 1.136 0.000 (/) -1.780-0.696 0.004 () -0.159 0.070-0.038 /100 0.031 (/) 3.472 (/) -1.681 (/) 2.034-0.015 9
18 10
END 11
TBD 12
()2 ()2(1) 1 2 (Ver0.1)3 Ver0.25 13
EASE EPM(Empirical Project Monitor) EPM Pro* COSE20052006* *,,,,,,, NAIST-IS-TR2007001, February 2007 14
GQM(Goal/Question/Metric) V. R. Basili * *V. R. Basili and D. M. Weiss: A methodology for collecting valid software engineering data, IEEE Transactions on Software Engineering, Vol.SE-10, No.6, pp.728-738, 1984. 15
EASE Goal Question CVSGNATS Goal() Metric A: B: C: D: E: G: KSLOC F: H: 16
() 17
()GQM Goal Question Metric 18
Copyright 2007 Nara Institute of Science and Technology 19
Copyright 2007 Nara Institute of Science and Technology 20