1) 1) Props of preparation. Wire Scale Spike Cutter Hammer Tape Marker (, ) Rope(For Sezing) 2) 2) Marking A 22 A point Position of twenty-two times the Dia, from the end of the rope. B A B point Position of the necessary length for the Eye from A point. C B 25 C point Position of twenty-five times the Dia, from B point. D B 28 D point Position of twenty-eight times the Dia, from B point. 60m/m A 1320mm B A C B 1500mm D B 1680mm
3) 3) Lead Rope Connection D The Lead Rope is connected with the core of the end. The length of the Lead Rope needs to be about the length. From the end to D point. Note: Before connecting the Lead Rope. Tape it in order to protect breaking the core of the cut end.
4) 4) Pulling out of the Core B B Spread strands of the cover at B point. Pull out the core from B point to the end. 5) 5) Insertion of the Lead Rope A B Insert the Lead Rope from A point to B point.
6) 6) Insertion of the Core A B Connect the end of the core with the Lead Rope starting from A point, pull the Lead Rope at B point, and insert the core. 7) 7) Ajustment of the core and cover are by pulling. B A Put rope through the mill with hands from B point toward A point, get the core and cover ready for pulling because the cover with slacken, in case of inserting the core.
8) 8) Completion of the Eye. 6) 7) A B Fit A point and B point, as in (6) and (7), and the Eye is formed. 9) 9) Preparation for splicing the core [1] With the taper-shaped rope. Wrap the core tip, insert the Lead Rope into the middle of the core, and turn around as in the photo 9.
10) 10) Preparation for splicing the core [2] The Lead Rope is taped tight with the core tip. 11) 11) Pulling the yarn of the cover splice part. 100 1/2 The Rope that fast shutted, rope with locking Load because of one-hundred percent insertion of the core and cover is difficult, cut black marking part like a photo, 11 only the cover, reduce the cover to half quantity.
12) 12) Cut the cover Yarn. 2 24 2 12 Organization of 2 24 stroke organize it of 2 12 stroke 13) 13) Taping 2 Tape the lead rope by folding the rope double with the tip of the cover.
14) 14) Insertion of the core and cover [1] Insert the Lead Rope of the core and cover. 15) 15) Insertion of the core and cover [2] D C Draw out the Lead Rope of the core from D point, and the rope of the cover from C point.
16) 16) Insertion of the core and cover [3] (D ) At first, pull the Lead Rope of the core (D point ) and insert the core. Gently hold a rope like a left-herded person would, and slacken the cover in order to put the rope in the core easily. 17) 17) Insertion of the cover C 16) Let out the Lead Rope from C point, insert the way as in (16)
18) 18) Insertion using the props Install the hammer at the end of the Lead Rope and pull it, because of the insertion of the cover isn t easy like the insertion of the core. As the cover gradually goes in, because of a rope fast shut, and difficult go in, put a rope knocking with a hammer. 19) 19) The end of the insertion of the core and cover The insertion of the core and cover is now complete.
20) 20) Cutting the end After inserting the core and cover, cut the end. 21) 21) Seizing of the Eye root 2 As with the seizing before put a spike through the rope, and make a hole, fix a string with the end of a wire bent double, and bind the rope as in the photo
22) 22) Process ending of the Eye splice. Seize with String to complete the Eye splice.