特-2.indd

Similar documents
特-8.indd

IHIMU Energy-Saving Principle of the IHIMU Semicircular Duct and Its Application to the Flow Field Around Full Scale Ships IHI GHG IHIMU CFD PIV IHI M

MIJAC

Table 2 DENSO Port Injection Fuel Injectors Fig.1 Port Fuel Injection System and Module 1996 CO ポート噴射システム 1 ( 1) HC 2 UC [2] (

パナソニック技報

特-3.indd

<95DB8C9288E397C389C88A E696E6462>

Fig. 3 Flow diagram of image processing. Black rectangle in the photo indicates the processing area (128 x 32 pixels).

橡最終原稿.PDF

16_.....E...._.I.v2006

ISAP- Integrated Structural Analysis Program for Piping Designs : Version IV ISAP- SAP- ISAP- 10 INPULS ( 3D-CAD ) ADAMS- GUI ( Graphical User Interfa

特-7.indd

mile= km 1 knot = km/h km/h ,6

A Study on Throw Simulation for Baseball Pitching Machine with Rollers and Its Optimization Shinobu SAKAI*5, Yuichiro KITAGAWA, Ryo KANAI and Juhachi

F7-10 エンジンの Design of F7-10 High Bypass Turbofan Engine for P-1 Maritime Patrol Aircraft 空 部 ス 部 空エンジン 部 空 部 ス 部 空エンジン 部 F7-10 エンジン の P-1 の ファン エンジン 部

「フェリー等によるタンク自動車等の輸送に係る調査」における

_Y05…X…`…‘…“†[…h…•

Table 1. Assumed performance of a water electrol ysis plant. Fig. 1. Structure of a proposed power generation system utilizing waste heat from factori

HSSE HSSE HSSE ERAWAN 2 FSO HSSE 2. HSSE 活 動 HSSE ( Safety First ) Safety Moment HSSE HSSE HSSE 2. 1 HSSE プラン HSSE HSSE HSSE HSSE HSSE 2. 2 VSCC VSCC

Fig. 1 Schematic construction of a PWS vehicle Fig. 2 Main power circuit of an inverter system for two motors drive

Vol.1 No Autumn


43 + +* / +3+0,, 22*,, ++..0/ / 1/. / / + /* *,* +* *.* /* *,/./ +3+,. + : / 3 / +** +**, // /. /+ /+ + * * ,* , 0.. /3 : +/,.

04長谷川英伸_様.indd

The Evaluation of LBB Behavior and Crack Opening Displacement on Statically Indeterminate Piping System Subjected to Monotonic Load The plastic collap

untitled

Study on Throw Accuracy for Baseball Pitching Machine with Roller (Study of Seam of Ball and Roller) Shinobu SAKAI*5, Juhachi ODA, Kengo KAWATA and Yu

untitled

特-11.indd


放水の物理的火災抑制効果に着目した地域住民の消火活動モデル


FUJII, M. and KOSAKA, M. 2. J J [7] Fig. 1 J Fig. 2: Motivation and Skill improvement Model of J Orchestra Fig. 1: Motivating factors for a

『広島平和科学』24 (2002) pp


原稿.indd

IPSJ SIG Technical Report Vol.2010-NL-199 No /11/ treebank ( ) KWIC /MeCab / Morphological and Dependency Structure Annotated Corp

外国文学論集14号.indd

Fig, 1. Waveform of the short-circuit current peculiar to a metal. Fig. 2. Waveform of arc short-circuit current. 398 T. IEE Japan, Vol. 113-B, No. 4,

社会技術論文集

2 94

(1 ) (2 ) Table 1. Details of each bar group sheared simultaneously (major shearing unit). 208

3_23.dvi

パナソニック技報


no15

Developement of Plastic Collocation Method Extension of Plastic Node Method by Yukio Ueda, Member Masahiko Fujikubo, Member Masahiro Miura, Member Sum



Visual Evaluation of Polka-dot Patterns Yoojin LEE and Nobuko NARUSE * Granduate School of Bunka Women's University, and * Faculty of Fashion Science,

1


bc0710_010_015.indd

Table 1. Reluctance equalization design. Fig. 2. Voltage vector of LSynRM. Fig. 4. Analytical model. Table 2. Specifications of analytical models. Fig

Core Ethics Vol. : - : : : -

149 (Newell [5]) Newell [5], [1], [1], [11] Li,Ryu, and Song [2], [11] Li,Ryu, and Song [2], [1] 1) 2) ( ) ( ) 3) T : 2 a : 3 a 1 :

Manoeuvring Performance of the Fishing Boat Modified by a Bulge by Yasuo Yoshimura, Member Shiro Suzuki Ning Ma, Member Yoshiyuki Kajiwara Summary Fis

Estimation of Photovoltaic Module Temperature Rise Motonobu Yukawa, Member, Masahisa Asaoka, Non-member (Mitsubishi Electric Corp.) Keigi Takahara, Me

可変ピツチプロペラ船の荒天碇泊法単錨泊について


ISSN ISBN C3033 The Institute for Economic Studies Seijo University , Seijo, Setagaya Tokyo , Japan

Journal of Geography 116 (6) Configuration of Rapid Digital Mapping System Using Tablet PC and its Application to Obtaining Ground Truth

Optical Lenses CCD Camera Laser Sheet Wind Turbine with med Diffuser Pitot Tube PC Fig.1 Experimental facility. Transparent Diffuser Double Pulsed Nd:

- 4 -


Contents Launching of the Thailand-Japan Longstay Promotion Association Longstay and establishing the Thailand-Japan Longstay Promotion Association Re

(Received December 22, 2000; accepted March 12, 2001) Gas field development projects of Nippon Oil Exploration Nobuyuki Sakata Abstract: Nippon Oil Ex

) ) 20 15) 16) ) 18) 19) (2) ha 8% 20) ) 22)

Vol. 48 No. 3 Mar PM PM PMBOK PM PM PM PM PM A Proposal and Its Demonstration of Developing System for Project Managers through University-Indus

22.Q06.Q

評論・社会科学 98号(P)☆/1.鰺坂

( ) [1] [4] ( ) 2. [5] [6] Piano Tutor[7] [1], [2], [8], [9] Radiobaton[10] Two Finger Piano[11] Coloring-in Piano[12] ism[13] MIDI MIDI 1 Fig. 1 Syst

Table 1 Utilization of Data for River Water Table 2 Utilization of Data for Groundwater Quality Analysis5,6,9,10,13,14) Quality Analysis5-13) Fig. 1 G

Fig. 4. Configuration of fatigue test specimen. Table I. Mechanical property of test materials. Table II. Full scale fatigue test conditions and test

2002-

MEET NEWS JAPAN

第62巻 第1号 平成24年4月/石こうを用いた木材ペレット

Tf dvi


I N S T R U M E N T A T I O N & E L E C T R I C A L E Q U I P M E N T Pressure-resistant gasket type retreat method effective bulk compressibility Fro

untitled

<82E682B15F96702E696E6464>

*.E (..).R

06_学術.indd

橡A PDF

paper.dvi

16−ª1“ƒ-07‘¬ŠÑ

(43) Vol.33, No.6(1977) T-239 MUTUAL DIFFUSION AND CHANGE OF THE FINE STRUCTURE OF WET SPUN ANTI-PILLING ACRYLIC FIBER DURING COAGULATION, DRAWING AND


System to Diagnosis Concrete Deterioration with Spectroscopic Analysis IHI IHI IHI The most popular method for inspecting concrete structures for dete

Core Ethics Vol. -

202

2 146

JOURNAL OF THE JAPANESE ASSOCIATION FOR PETROLEUM TECHNOLOGY VOL. 66, NO. 6 (Nov., 2001) (Received August 10, 2001; accepted November 9, 2001) Alterna

Huawei G6-L22 QSG-V100R001_02

2006 [3] Scratch Squeak PEN [4] PenFlowchart 2 3 PenFlowchart 4 PenFlowchart PEN xdncl PEN [5] PEN xdncl DNCL 1 1 [6] 1 PEN Fig. 1 The PEN

生駒山麓の遊園・観光開発計画の蹉跌 - 日下温泉土地を中心として -


206“ƒŁ\”ƒ-fl_“H„¤‰ZŁñ


Transcription:

LNG IHI-SPB IHI-SPB Tank for LNG Fueled Ship NO x SO x 3 2015 ECA ( Emission Control Area ) 2 NO x 80 0.1 LNG IHIMU IHI-SPB LNG LNG IHIMU IHI-SPB LNG Much attention is being paid to LNG fueled vessels as a way of satisfying the IMO s emission control requirements. IHI Marine United Inc. ( IHIMU ) has developed an LNG fuel gas system employing IHI-SPB gas fuel tank. A case study on an LNG fueled container vessel fitted with this system is being carried out. IHIMU has converted IHI-SPB cargo containment technology into a fuel gas tank, allowing confirmation under harsh sea conditions, such as those found in the Japan-Alaska sea route, of the high reliability this system offers thanks to IHIMU s experience in LNG. IHI-SPB fuel tanks can flexibly accommodate shape restrictions, providing the highest volume efficiency for the available space. This case study on a large LNG fueled container vessel employing an IHI-SPB gas fuel system demonstrates that a minimal loss of container cargo capacity compared with the original design can be achieved. 1. 緒言 ( IMO ) ( NO x ) ( SO x ) 3 2015 ( ECA Emission Control Area ) 2 NO x 80 0.1 ( LNG ) LNG LNG LNG IHI-SPB ( Self-supporting Prismatic shape IMO type B ) ( IHIMU ) LNG LPG LPG FSO/ FPSO ( 1 ) IHI-SPB LNG IHIMU IHI-SPB LNG ( 2 ) ( 3 ) 2. 排ガス規制動向と LNG 燃料 2. 1 排ガス規制動向 1973 1978 VI 2008 10 NO x IMO ECA 第 1 図 ECA ECA SO x 2011 7 1 ECA 1 2015 1 0.1 36 IHI Vol.52 No.3 ( 2012 )

US ECA ( y ) 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 NO x 2 3 ECA SO x 4.5 3.5 0.5 *1 ECA 1.0 0.1 ECA USA 200 n mile US 20 40 n mile 第 1 図 ECA Fig. 1 Emission control area and schedule *1 2018 2. 2 従来技術での規制対応と LNG 燃料の特長 IMO 3 ECA NO x 80 ( SCR ) SO x SCR CO 2 CO 2 3 2008 12 14 ( COP14 ) IMO NO x SO x CO 2 NO x 80 90 IMO 3 SO x CO 2 20 25 2 3. LNG 燃料タンクとしての IHI-SPB タンク 3. 1 LNG タンクの分類 IMO LNG Type-A B C IHI-SPB Type-B 第 2 図 LNG Type- A IHI-SPB Type- B LNG Type- C 第 2 図 LNG Fig. 2 Type of LNG tank IHI Vol.52 No.3 ( 2012 ) 37

LNG 1 1 Type-A 2 Type-B 2 Type-C 2 3. 2 LNG 燃料タンクとしての IHI-SPB タンクの特長 第 3 図 IHI-SPB IHI-SPB ( 1 ) IHIMU IHI-SPB 第 4 図 第 3 図 IHI-SPB Fig. 3 IHI-SPB tank LNG LNG LNG LNG LNG LNG ( 2 ) LNG LNG LNG IHI-SPB LNG ( 3 ) LNG LNG LNG 2 SPB LPG SPB SPB LNG Type-B LPG Type-B LEG/LNG Type-B LNG POLAR EAGLE ARCTIC SUN Type-B LPG FSO ESCRAVOS Type-B LPG FPSO SANHA 1980 1985 1990 1995 2000 2005 2010 ( y ) 第 4 図 IHI-SPB Fig. 4 Construction record for IHI-SPB tanks 38 IHI Vol.52 No.3 ( 2012 )

IHI-SPB 第 5 図 IHI-SPB 第 5 図 - ( a ) IHI-SPB LEG/ LNG ( 4 ) 1 750 m 3 第 5 図 - ( b ) LNG 1 22 250 m 3 IHI-SPB ( a ) LEG/LNG ( b ) LNG 第 5 図 IHI-SPB Fig. 5 IHI-SPB tanks of various shapes 3. 3 IHI-SPB と Type - C タンクとの比較 LNG 第 2 図 Type - C 第 1 表 IHI-SPB Type - C Type - C IHI-SPB Type - C IHI-SPB Type-C IHI-SPB LNG Type-C 2 2 000 m 3 LNG IHI-SPB Type-C 1/5 1/6 IHI-SPB 9 9 Type-C 1/3 IHI-SPB Type -C 第 1 表 IHI-SPB Type-C Table 1 Comparison between IHI-SPB and Type-C tanks IHI-SPB Type-C < 0.7 bar { 0.07 MPa } < 10 bar { 1 MPa } 9 9 IHI Vol.52 No.3 ( 2012 ) 39

3. 4 船級承認 IHI-SPB LNG LPG LPG FSO/FPSO LNG IHI-SPB LNG IHI-SPB IHI-SPB 2011 2012 4. IHI-SPB タンクを用いた LNG 燃料供給システム IHI-SPB LNG 第 6 図 LNG ( NBOG ) LNG LNG ( FBOG ) ( a ) LNG etc. ( b ) LNG etc. P NBOG FBOG LNG NBOG FBOG LNG 6 bar { 0.6 MPa } 200 300 bar { 20 30 MPa } 第 6 図 LNG - ( a ) LNG - ( b ) IHI-SPB 5. LNG 燃料船の試設計 IHI-SPB LNG 10 000 TEU 330.0 m 48.0 m 27.0 m 10 000 TEU 20 000 mile LNG 2 000 m 3 ( ECA ) C 10 000 m 3 ( ECA ) LNG LNG LNG ECA ECA C ECA LNG NBOG NBOG 第 7 図 LNG LNG LNG 200 TEU IHI-SPB 第 8 図 P LNG P 第 6 図 IHI-SPB LNG Fig. 6 Concept for gas supply system with IHI-SPB tank 第 7 図 Fig. 7 General arrangement 40 IHI Vol.52 No.3 ( 2012 )

LNG IHI-SPB LNG IHI-SPB 参考文献 6. 結言 LNG IMO 3 LNG LNG 第 8 図 LNG Fig. 8 LNG fueled 10 000 TEU container IHI-SPB LNG IHI-SPB ( 1 ) SPB LNG 34 4 1994 7 pp. 235 240 ( 2 ) LNG IHI SPB LNG LNG 2012 2 pp. 26 33 ( 3 ) A. Tanoue, H. Shuto, K. Sakaguchi and Y. Nagata : Fuel Gas System with IHI SPB Tank Development and Its Application to the large Container Vessel Gas fuelled ships ( 2011 ) pp. 142 148 ( 4 ) SPB 28 6 1988 11 pp. 380 386 IHI Vol.52 No.3 ( 2012 ) 41