1 Samarinda Kutai Kertanegara Tenggarong Kabupaten Kutai Timur Sangata KP % KP: Kuasa Pertambangan 4 Mining Authorization (PTBA) PKP2B 1 4 (Cooperative Units:KUD)

2 99% Land Cleaning Over Burden Removal Coal Mining Back Filling Rehabilitation Pt. Kitadin Pt. Fajar Bumi Sakti 2 ROMRun of Mine Coal (Washing) (Coal Preparation, Coal Beneficiation) CCT (Coal Cleaning)

3

4 (TSS) Dirty Coal ph TSS, Fe, Mn

5 (Separation) 2 4 De-sliming 1 Washery 1 PT. Kitadin 60t/h+120t/h Separation Jig Settling Pond 2 PT. Fajar Bumi Sakti (FBS) 100t/h Separation Jig Settling Pond 3 PT. Tanito Harum / Sebulu 125t/h (De-slime) (Jig Settling Pond 4 PT. Tanito Harum / Loa Tebu 1 70t/h De-slime Drum-Washer Cyclone Classifier Settling Pond 5 PT. Malti Harapan Utama (MHU) 400t/h De-slime Screen Cyclone Classifier Settling Pond 6 PT. Bukit Baiduri Energy (BBE) 250t/h De-slime Screen Cyclone Classifier Settling Pond No.1 No.2 3 (+50mm5040mm-40mm) 40mm mm 1mm Settling Pit (+50mm-50mm) 50mm 50mm 50mm mm 0.5mm 1 De-sliming De-sliming

6 mm 3 12 De-sliming 1mm mm Drum Washer 50mm/1mm 50mm 501mm 1mm mm 50mm/1mm 50mm 50 1mm 1mm mm 1mm 1mm 1mm 0.5mm 1mm

7 KTD/No.1 No.2 Hand Picking Screen 50/40mm Crusher JIG Clean Coal (-50mm) Screen 1mm Settlimg Pit & Bucket Elevator Reject Clean Coal (-40mm) Wastewater Pump Pit Flocculant Circulating Water 1st Settling Pond 2ndSettlingPond 3rd Settling Pit Flocculant Discharge 4th Settling Pit 2 LI GHT PRODUCT FEED FALLING VELOCITY SPLITTER DOWNWARD CURRENT SCREEN Pulsating UPWARD CURRENT HEAVY PRODUCT

8 KTD/No.1 Clean Coal (-50mm) Clean Coal (-40mm) Reject Crusher Screen 1mm Wastewater Pump Pit Picing Band +50mm 1st BE Reject Bucket Elevator 4050mm Screen 50/40mm -40mm JIG 60t/h Over- Flow to Settling Pond Feeder Sellting Pit 2nd BE Re-Feed Slurry fromno.2 Plant Feed KTD/No.2 Clean Coal (-40mm) Clean Coal (-50mm) Crusher Reject Picing Band Bucket Elevator Sellting Pit to No.1 Plant 4050mm Screen 50/40mm Feeder +50mm Screen 1mm Over- Flow -40mm 2nd BE Re- Feed JIG 120t/h 1st BE Reject Feed

9 FBS Screen 50mm Hand Picking Crusher JIG Screen 0.5mm Reject Clean Coal (-50mm) Circulating Water 1st Settling Pit 2nd Settling Pond 3rd Settling Pond Discharge FBS Settling Pond 1st BE Reject Screen 0.5mm 2nd BE Re-Feed JIG 100t/h -50mm -50mm Crusher Clean Coal (-50mm) Picing Band +50mm Screen 50mm (Grizzly) Feed

10 TH/SEBULU Screen 50mm Crusher JIG Screen 1mm Settlimg Pit & Bucket Elevator Hand Picking Clean Coal (-50mm) 1st Settling Pond 2nd Settling Pond 3rdSettlingPond Discharge TH/SEBULU Hand Picking Screen 1mm JIG 125t/h Crusher Bucket Elevator -1mm -50mm Screen 50mm Feed Sellting Pit 2nd BE 1st BE Re- Feed Clean Coal Over-Flow

11 TH/LOA TEBU 1 Drum Washer 1mm Crusher Screen 50/1mm Cyclone Classifier Clean Coal (50-1mm) Clean Coal (1-0.5mm) Cyclone Feed Sump Screen 0.5mm Flocculant 1st Settling Pond 2nd Settling Pond 3,4th Settling Pond 5thSettlingPond Emergency Pond Discharge TH/LOA TEBU 1 Clean Coal (0.5-1mm) Clean Coal (50-1mm) Cyclone Feed Sump Over-Flow P -0.5mm Crusher Screen 50/1mm -1mm Cyclone -1mm Screen 0.5mm Drum Washer 1mm Crusher Feed Feed

12 MHU Cyclone Classifier Feeder Breaker Screen 75mm Crusher Screen 0.25mm Screen 50/1mm Crusher Clean Coal (-50mm) Cyclone Feed Sump Over-Flow Sump 1st Settling Pond 2nd Settling Pond 3rd Settling Pond Discharge MHU Clean Coal (-50mm) Cyclone Classifier -1mm Screen 50/1mm Over-Flow Sump Screen 0.25mm Water Screen 75mm Crusher Clean Coal (-50mm) +0.25mm 50-1mm Crusher 75-50mm to Settling Pond -120mm Feeder Breaker

13 BBE Feeder Breaker Cyclone Classifier Screen 50mm Crusher Screen 0.5mm Net 50mm Screen 1mm Buscket Centrifuge Wastewater Pump Pit Cyclone Feed Sump Screen 60mm Crusher 1st Settling Pond 2nd Settling Pond 3rdSettlingPond 4th Settling Pond Clean Coal (-50mm) (A, B, C) Flocculant Discharge BBE Clean Coal (-50mm) Crusher Screen 50mm (Grizzly) Water Cyclone Classifier Screen 0.5mm Screen 1mm Spiral Screen 60mm Crusher to Pump Pit 50-1mm +50mm Busket Centrifuge Feeder Breaker Wood chips Feeder Breaker

14 Under-Flow Over-Flow BE Washery / 1 PT. Kitadin Settling Pit Bucket Elevator 2 PT. Fajar Bumi Sakti (FBS) De-slime Screen / 0.5mm 3 PT. Tanito Harum / Sebulu Settling Pit Bucket Elevator 4 PT. Tanito Harum / Loa Tebu 1 Cyclone Classifier Screen / 0.5mm 5 PT. Multi Harapan Utama (MHU) Cyclone Classifier Screen / 0.25mm 6 PT. Bukit Baiduri Energy (BBE) Cyclone Classifier Screen / 0.5mm FBS 0.5mm 0.5mm Kitadin Sebulu 2 FBS Loa Tebu 1MHUBBE 100µm

15 Washery Performance of Cyclone Classifier D 50 Ep Yield of Under-flow 4 PT. Tanito Harum / Loa Tebu 1 320µm 220µm 59% 5 PT. Multi Harapan Utama (MHU) 840µm 650µm 20% 6 PT. Bukit Baiduri Energy (BBE) 160µm 125µm 79% 30 BBE 160µm Loa Tebu 1 320µm MHU 840µm Tanito/Loa Tebu 1 Wt% IM% Ash% GCV Wt% IM% Ash% GCV Wt% IM% Ash% GCV +1000µm Total MHU Wt% IM% Ash% GCV Wt% IM% Ash% GCV Wt% IM% Ash% GCV +1000µm Total BBE Feed Under Flow Over Flow 15-Jun Jun Jun-06 Feed Under Flow Over Flow 16-Dec Dec Dec Wt% IM% Ash% GCV Wt% IM% Ash% GCV Wt% IM% Ash% GCV +1000µm Total Feed Under Flow Over Flow 7-Dec-06 7-Dec-06 7-Dec (-ad) (-ad) (-ad)

16 Partition Curve of Cyclone Classifier 100% 90% 80% 70% D µm Ep 125µm D µm Ep 220µm Partition Factor 60% 50% 40% 30% D µm Ep 650µm Loa Tebu 1 MHU BBE 20% 10% 0% Particle Size (µm) m 3 /min 38% 420t/h kcal/kg Washery Flow rate Conc. Solid IM Ash GCV (m 3 /min) (%) (t/ %-ad) (%-ad) (kcal/kg-ad) 1 PT. Kitadin PT. Fajar Bumi Sakti (FBS) PT. Tanito Harum / Sebulu No-Operating 4 PT. Tanito Harum / Loa Tebu PT. Malti Harapan Utama (MHU) PT. Bukit Baiduri Energy (BBE) % Washery Capacity Solid Solod / (t/h) (t/ Capacity 1 PT. Kitadin % 2 PT. Fajar Bumi Sakti (FBS) % 3 PT. Tanito Harum / Sebulu 4 PT. Tanito Harum / Loa Tebu % 5 PT. Malti Harapan Utama (MHU) % 6 PT. Bukit Baiduri Energy (BBE) % Loa Tebu 1 70t/h 150

17 4-2-7 Washery IM Ash GCV TS (t/) (%-ad (%-ad (kcal/kg (%-ad 1 PT. Kitadin PT. Fajar Bumi Sakti (FBS) PT. Tanito Harum / Sebulu PT. Tanito Harum / Loa Tebu PT. Malti Harapan Utama (MHU) PT. Bukit Baiduri Energy (BBE) Sebulu kcal/kg kcal/kg IM Ash GCV Conc. Flow rate Size Date of Sampling Remarks %-ad %-ad kcal/kg-ad % m 3 /min Analysis Kitadin 14-Jun Data of Kitadin Date IM Ash GCV TS Size Place of Sampling of Sampling %-ad %-ad kcal/kg-ad %-ad Analysis Kitadin 1st Pond Drying 14-Jun Remarks

18 Date of Sampling IM Ash GCV Conc. Flow rate Size %-ad %-ad kcal/kg-ad % m 3 /min Analysis FBS 10-Jul Jul Jul Jul Jul Jul Sep Sep Average Remarks Place of Sampling Date IM Ash GCV TS Size of Sampling %-ad %-ad kcal/kg-ad %-ad Analysis Remarks FBS 1st Pond Settling 15-Jun st Pond Settling 7-Aug st Pond Settling 22-Sep st Pond Settling 22-Sep st Pond Settling 22-Sep st Pond Drying 15-Jun st Pond Drying 21-Jun st Pond Drying 1-Aug Average FBS

19 Date IM Ash GCV TS Size Place of Sampling of Sampling %-ad %-ad kcal/kg-ad %-ad Analysis Sebulu 1st Pond Settling 19-Jun Remarks Date of Sampling IM Ash GCV Conc. Flow rate Size %-ad %-ad kcal/kg-ad % m 3 /min Analysis Loa Tebu 1 15-Jun Jun Jun Jun Sep-06 10: Sep-06 11: Sep-06 13: Sep-06 13: Sep-06 14: Average Remarks Place of Sampling Date IM Ash GCV TS Size of Sampling %-ad %-ad kcal/kg-ad %-ad Analysis Loa Tebu 1 Emg. Pond Drying 15-Jun Last Pond Drying 15-Jun Last Pond Drying 1-Aug Last Pond Drying 7-Aug Average Remarks

20 On/OFF On/OFF Date of Sampling IM Ash GCV Conc. Flow rate Size %-ad %-ad kcal/kg-ad % m 3 /min Analysis MHU 15-Jun Jun Sep-06 13: Sep-06 14: Sep-06 15: Sep-06 16: Average Remarks Place of Sampling Date IM Ash GCV TS Size of Sampling %-ad %-ad kcal/kg-ad %-ad Analysis MHU 1st Pond Drying 15-Jun st Pond Drying 7-Aug Average Remarks Tanito Harum

21 Date of Sampling IM Ash GCV Conc. Flow rate Size %-ad %-ad kcal/kg-ad % m 3 /min Analysis BBE 20-Jun Jun Sep-06 11: Sep-06 11: Sep-06 13: Sep-06 14: Sep-06 14: Average Remarks Place of Sampling Date IM Ash GCV TS Size of Sampling %-ad %-ad kcal/kg-ad %-ad Analysis BBE 1st Pond Drying 16-Jun nd Pond Drying 16-Jun rd Pond Drying 16-Jun rd Pond Drying 2-Aug rd Pond Drying 8-Aug Average Remarks

22 KTD Make- up Water 4th Pit No.1 P Flocculant Labo. No.2 to Plant 3rd Pit Raw Coal Yard Cr "Dirty Coal" Drying Fine Coal 2nd Pond Flocculant 1st Pond PT Kitadin FBS 3rd Pond 2nd Pond P to Plant 1st Pond Mine Water JIG Drying yard Office Raw Coal Yard PT Fajar Bumi S akti

23 TH/SEBULU Ra w Coa l Ya rd JIG 1st Pond CaCO3 3rd Pond 2nd Pond PT Tanito Harum / Sebulu TH/LOA TEBU 1 1st Pond P Salable F.C. 5th Pond 4th Pond Office Raw Coal Yard Emerg. Pond 3rd Pond Flocculant 2nd Pond Loa Tebu R OM Open-Pit L1C-2 Dirty Coal P PT Tanito Harum / Loa Tebu 1

24 2.5 Quantity of Generating of Wastewater Loa Tebu 1 10 IM 5.2% Ash 42.9% Flow rate(m 3 /min) IM 6.2% Ash 29.0% Max 2.37 m 3 /min Min 0.96 m 3 /min Avg 1.96 m 3 /min IM 5.3% Ash 40.8% IM 5.6% Ash 35.2% IM 6.0% Ash 31.8% Avg- Conc 6.8 % IM 5.7% Ash 35.9% Concentration(%) :30 11:00 11:30 12:00 12:30 13:00 13:30 14:00 Time(Sep 28, 2006) MHU 2nd Pond 1st Pond Office Raw Coal Yard 3rd Pond PT Multi Harapan Utama

25 Quantity of Generating of Wastewater MHU Flow rate (m 3 /min IM 5.3% Ash 45.0% 9.82 IM 5.6% Ash 38.3% 6.66 IM 5.5% Ash 43.2% Max 6.39 m 3 /min Min 0 m 3 /min Avg 4.53 m 3 /min Concentration(%) :13 13:23 13:33 13:43 13:53 14:03 14:13 14:23 14:33 14:43 14:53 15:03 15:13 15:22 15:30 15:38 15:47 15:56 16:06 16:16 16:26 16:36 16:46 16:56 17:06 Time(Sep 25, 2006) 7.0 Quantity of Generating of Wastewater MHU 6.0 Max 6.52 m 3 /min Min 0 m 3 /min Avg 4.61 m 3 /min 5.0 Flow rate(m 3 /min) Pump ON Pump ON 1.0 Pump OFF :37 17:42 17:47 17:52 17:57 18:02 18:07 18:12 18:17 18:22 18:27 18:32 18:37 18:42 18:47 Time(Dec 16, 2006)

26 BBE Raw Coal Yard Sump P 3rd Pond 4th Pond 1st Pond (A) Flocculant 2nd Pond (B) (C) Flocculant PT Bukit Baiduri Enterprise Quantity of Generating of Wastewater BBE IM 7.5% Ash 33.9% IM 7.9% Ash 2.62 IM 8.0% Ash IM 5.4% Ash Flow rate(m 3 /min) IM 6.9% Ash 47.8% Max 5.50 m 3 /min Min 2.82 m 3 /min Avg 4.20 m 3 /min Avg- Conc 2.4 % IM 7.1% Ash 34.2% :49 11:19 11:49 12:19 12:49 13:19 13:49 14: Concentration(%) Time(Sep 27, 2006)

27 A F Washery SS ph Fe ion Mn ion Flow ratem 3 /min IM Ash GCV mg/l - mg/l mg/l Measure Caluc %-ad %-ad kcal/kg-ad Remarks A 13, B Circulating Water C Short Operating time D Short Operating time E Short Operating time F Measure Caluc SS A-WasheryC-WasheryE-Washry 400mg/l Fe C-Washery 7mg/l Mn Washery 4mg/l A-Washery B-Washery A-Washery B-Washery SS F-Washery Dec

28 Washery Date of Sampling SS ph Fe ion Mn ion Flow ratem 3 /min IM Ash GCV Remarks mg/l - mg/l mg/l Measure Caluc %-ad %-ad kcal/kg-ad A Jun-06 16, Sep-06 12, , , Average 13, B Jun < 0.3 < Circulating Water Sep < 0.3 < Circulating Water Dec-06 11: < 0.5 Dec-06 15: < 0.5 Dec-06 19: < H Sampling Dec-06 23: < Circulating Water Dec-06 03: < 0.5 Dec-06 07: < 0.5 Dec-06 11: < 0.5 Average < Circulating Water C Jun > 10 < Sep-06 12: > 10 < Sep-06 12: Short Operating time Sep-06 12: Average > 10 < D Jun < 0.3 < 0.5 Jun < 0.3 < 0.5 Jun < 0.5 Short Operating time Sep Average < E Jun-06 1, < 0.5 Jun < 0.3 < 0.5 Jun < 0.5 Jun < 0.5 Sep Dec-06 13: < 0.5 Dec-06 17: < 0.3 < 0.5 Dec-06 21: < 0.3 < 0.5 Dec-06 01: Dec-06 05: < 0.5 Dec-06 09: Dec-06 13: < Dec-06 17: < 0.3 < 0.5 Dec-06 21: < 0.3 < 0.5 Dec-06 01: < 0.3 < 0.5 Dec-06 05: < 0.3 < 0.5 Dec-06 09: H Sampling Short Operating time Average < F Jun < 0.5 Jun < 0.3 < 0.5 Jun < 0.3 < 0.5 Sep Sep Dec-06 11: < 0.5 Dec-06 15: Dec-06 19: < Dec-06 23: H Sampling Dec-06 03: < 0.5 Dec-06 07: Average < C-Washery D-Washery

29 Rainfall SS ph Fe ion Mn ion Flow ratem 3 /min IM Ash GCV WasheryDate of Sampling Remarks mm/h mg/l - mg/l mg/l Measure Caluc %-ad %-ad kcal/kg-ad C Dec-06 13: < 0.5 Dec-06 17: Max 395 Dec-06 21: > 10 < H Sampling Min Dec-06 01: No-Operating Avg 30 Dec-06 05: > 10 < 0.5 Dec-06 09: Average > 10 < D Dec-06 14: < 0.5 Dec-06 18:00 Max < 0.5 Dec-06 22:00 Min < H Sampling Dec-06 03:00 Avg < Dec-06 07: < 0.5 Average < > C-Washery 20mm/ 0 1.5m 3 /min SS 395mg/l ph D-Washery 19mm/ m 3 /min 17 SS 1679mg/l 20

30 Flow rate of Discharged Wastewater & Rainfall Washery-F Max 3.81 m 3 /min Min 2.33 m 3 /min Avg 2.70 m 3 /min Rainfall(mm/h) Flow rate (m 3 /min) Rainfall = 0mm :12 12:12 13:12 14:12 15:12 16:12 17:12 18:12 19:12 20:12 21:12 22:12 23:12 0:12 1:12 2:12 3:12 4:12 5:12 6:12 7:12 8:12 9:12 Time (Dec, 2006) Quality of Discharged Wastewater Washery-F Fe ion 0.5 Mn ion < 0.5 Fe ion 0.5 Mn ion < Fe ion 1.0 Mn ion < SS(mg/l) H Max 300 mg/l Min 227 mg/l Avg 245 mg/l :4211:4212:4213:4214:4215:4216:4217:4218:4219:4220:4221:4222:4223:420:42 1:42 2:42 3:42 4:42 5:42 6:427:42 8:42 Time (Dec, 2006)

31 25 Flow rate of Discharged Wastewater & Rainfall Washery-C mm/h 1.2 Rainfall (mm/h) Flow rate (m 3 /min) :30 13:30 14:30 15:30 16:30 17:30 18:30 19:30 20:30 21:30 22:30 23:30 0:30 1:30 2:30 3:30 4:30 5:30 6:30 7:30 8:30 Time (Dec, 2006) 450 Quality of Discharged Wastewater Washery-C Fe ion 5 Mn ion < SS (mg/l) Fe ion >10 Mn ion < Fe ion >10 Mn ion < H 150 Max 395 mg/l Min 17 mg/l Avg 30 mg/l :40 13:40 14:40 15:40 16:40 17:40 18:40 19:40 20:40 21:40 22:40 23:40 0:40 1:40 2:40 3:40 4:40 6:40 7:40 8:40 1 Generator Stop 0 Time (Dec, 2006)

32 Flow rate of Discharged Wastewater & Rainfall Washery-D mm/h Rainfall(mm/h) Flow rate(m 3 /min) 6 4 Max 0.44 m 3 /min Min 0.00 m 3 /min Avg 0.31 m 3 /min :40 13:40 14:40 15:40 16:40 17:40 18:40 19:40 20:40 21:40 22:40 23:40 0:40 1:40 2:40 3:40 4:40 5:40 6:40 7:40 8:40 9:40 Time(Dec, 2006) Quality of Discharged Wastewater Washery-D Fe ion 2 Mn ion < Fe ion 2 Mn ion < Fe ion 2 Mn ion < SS(mg/l) Fe ion 2 Mn ion < 0.5 Fe ion 2 Mn ion < :54 13:54 14:54 15:54 16:54 17:54 18:54 19:54 20:54 21:54 22:54 23:54 0:54 1:54 2:54 3:54 4:54 5:54 6:54 7:54 8:54 9:54 ph 3 Max 1679 mg/l Min 410 mg/l Avg 625 mg/l 2 1 Time(Dec, 2006)

33 SS 16 / 300 / Washery SS Flow ratem 3 /min Operating Time Discharged Solid mg/l Measure Caluc h/day d/y min/y t/y Remarks A 13, ,920 Under-Ground B Under-Ground C ,000 D E F Total 12, mm/h 1 20mm/h mm/h mm/h 3.3mm/ 105 / SS Rainfall / Hours Hours Rainfall(mm/h

34 SS 105 / SS Flow ratem 3 /min Discharge time Discharged Solid Washery mg/l Measure Caluc h/y min/y t/y A B C ,360 D 1, E F Total 22 Remarks C-Washery D-Washery D-Washery 0.44m 3 /min 1 Sebulu BBE Sebulu Product / un-washed 19-Jun-06 Σ Wt% Ash% TS% GCV Wt% Ash% TS% GCV Total BBE Product / un-washed 16-Jun-06 Σ Wt% Ash% TS% GCV Wt% Ash% TS% GCV Total

35 2.0 Sebulu 22.47%BBE Kitadin kcal/kg 4300kcal/kg 37% FBS Loa Tebu 1-(2) Loa Tebu 1-(3) Sp.Gr=1.8 Kitadin/Stock Yard of Washery Wt% Ash TS GCV Ash TS GCV Clean Coal (%-ad) (%-ad) (kcal/kg) Dirty Coal Wt% Ash TS GCV Reject /Open Pit Wt% Ash TS GCV Ash TS GCV Clean Coal (%-ad) (%-ad) (kcal/kg) Dirty Coal Wt% Ash TS GCV Reject /Open Pit Wt% Ash TS GCV Ash TS GCV Clean Coal (%-ad) (%-ad) (kcal/kg) Dirty Coal Wt% Ash TS GCV Reject /Open Pit/Bottom Wt% Ash TS GCV Ash TS GCV Clean Coal (%-ad) (%-ad) (kcal/kg) Dirty Coal Wt% Ash TS GCV Reject /Open Pit/Bottom Wt% Ash TS GCV Ash TS GCV Clean Coal (%-ad) (%-ad) (kcal/kg) Dirty Coal Wt% Ash TS GCV Reject /Open +10mm Wt% Ash TS GCV Ash TS GCV Clean Coal (%-ad) (%-ad) (kcal/kg) Dirty Coal Wt% Ash TS GCV Reject /Open -10mm Wt% Ash TS GCV Ash TS GCV Clean Coal (%-ad) (%-ad) (kcal/kg) Dirty Coal Wt% Ash TS GCV Reject

36 1mm Pt. Kitadin 40 30

37 5 S ,000m(1mm) 3,000m(3mm) 4-3-2

38 Dirty Coal 510cm

39 ,747,000 5%

40 mm mm 40%

41

42 4-4-1 TSS ph ph FeMn Dinas Pertambangan dan Energi 6 IM of every above Size Fraction Ash of every above Size Fraction Heat Value Sizing 6 fractions) Ash Analysis Total Sulfur Total Sulfur of every above Size Fraction IM Ash VM FC Float & Sink Test : F/S Test

43 IM Ash VM Heat Value Total Sulfur Hardgrove Index Ash Fusion Temp. Ash Analysis Sizing 6 fractions) Sizing 8 fractions) Ash of every above Size Fraction F/S test 8 fractions) Heat Value of every above Size Fraction Total Sulfur of every above Size Fraction Ash of every above F/S test Fraction Heat Value of every above F/S test Fraction Total Sulfur of every above F/S test Fraction

44

45

46

...1 1....1 1.1...1 1.2...1 1.3...2 1.4...3 1.5...3 1.6...4 2....4 3....5...7...9...9...10...15 1....15 2....15 3....17...20...20 1....20 2....21 3....21 4....22 5....22 2005 1.5 5 1.7 5 100 2004 2005

More information

2 No.113, 2002 SK Gub. No. 26 tahun TSS 400mg/l Fe, Mn MOE 7mg/l 4mg/l Monitoring Maximum allowable value Sampling parameter MOE East

2 No.113, 2002 SK Gub. No. 26 tahun TSS 400mg/l Fe, Mn MOE 7mg/l 4mg/l Monitoring Maximum allowable value Sampling parameter MOE East 2 No.113, 2002 SK Gub. No. 26 tahun 2002 5-1-1 2002 TSS400mg/l Fe, Mn MOE 7mg/l4mg/l Monitoring Maximum allowable value Sampling parameter MOE East Kalimantan Province frequency ph 6.0 to 9.0 6.0 to 9.0

More information

A Akzo 12y26.doc Example of sun shade mat: ECO-MAT Power consumption of air-conditioner is saved by 10%. Picture of air-conditioner with ECO-MAT Comparison of consumed power of air-conditioner

More information

第122号.indd

第122号.indd -1- -2- -3- 0852-36-5150 0852-36-5163-4- -5- -6- -7- 1st 1-1 1-2 1-3 1-4 1-5 -8- 2nd M2 E2 D2 J2 C2-9- 3rd M3 E3 D3 J3 C3-10- 4th M4 E4 D4 J4 C4-11- -12- M5 E5 J5 D5 C5 5th -13- -14- NEWS NEWS -15- NEWS

More information

20 57

20 57 56 20 57 58 59 12 60 ph 61 62 CCA 63 64 ( 1) 700 7.5 86% 54 17 71 2) 700 6.8 86% 50 15 65 3) 600 700 5.7 84% 36 14 50 550 650 4.2 80% 21 6 27 40 500 3.6 78% 16 7 23 3.6 78% 16 7 23 400 700 4.0 78% 18 7

More information

スライド 1

スライド 1 201210 BP2011 BP2011 J-POWER C Coal ship Coal silo / yard Coal bunking Coal conveyer Coal bunker Coal stack /storage Transporting Unloading Coal feeder boiler Mill (pulverizer) Drying and milling

More information

8 1. 2. 3. 4. 5. 6. 7. 8. 1... 1 1.1.... 1 1.1.1.... 1 1.1.2.... 6 1.2.... 8 1.2.1.... 8 1.2.2....11 1.2.3.... 12 1.2.4.... 12 1.2.5.... 12 1.2.6.... 13 1.2.7.... 14 1.3.... 15 1.3.1.... 15 1.3.2....

More information

有明海・八代海総合調査評価委員会 委員会報告書 別添資料

有明海・八代海総合調査評価委員会 委員会報告書 別添資料 (10 6 m 3 ) 30 20 10 0 S30 S40 S50 S60 H7 260m 3 (7.7) 2,490m 3 (72.9) 500m 3 (14.7) 160m 3 (4.7) COD T-N T-P SS St.7( ) St.9( ) St.1( ) St.7( ) + St.9( ) ( ) ( ) A-2( ) B-2( ) B-3( ) COD T-N T-P SS St.1(

More information

17 Fig.2-1 Relationship between cooling water temperature and steam consumption of booster Source: The new oil and fat technology, Mr. E. Bornardini, Publishing house Technologie, Rome Note:

More information

平成26年度 化学物質分析法開発報告書

平成26年度 化学物質分析法開発報告書 N,N- N,N-Dimethylacetamide Acethyldimethylamine CAS 127-19-5 C 4 H 9 NO 87.12 ~ 87.14 87.68413 163-165 C 1) - 18.59 C 2) 1 mg/l 25 C 3) 3.3 hpa 2 C 4) log P ow -.77 2).9429 2/4 C 1) 3.1 4) 1.31E - 8 atm-m

More information

2010 1 1 7 2 16 2 2 06in 3 3 錆 錆 06in 4 4 0.1 5 5 HCl Cl NaOH H Cl O 2 H H 2 O NaCl Na OH H 2 O NaCl 2010 6 6 ph3.0 30 mg/l 30 1 O-157 H7 2010 7 7 100 Cl 80 60 40 20 HClO ClO CL ph 10 100,000ppm 12 01

More information

NL-22/NL-32取扱説明書_操作編

NL-22/NL-32取扱説明書_操作編 MIC / Preamp ATT NL-32 A C ATT AMP 1 AMP 2 AMP 3 FLAT FLAT CAL.SIG. OVER LOAD DET. AMP 4 AMP 5 A/D D/A CONV. AMP 6 AMP 7 A/D CONV. Vref. AMP 8 AMP 10 DC OUT AMP 9 FILTER OUT AC DC OUT AC OUT KEY SW Start

More information

年 1996 年 1997 年 1998 年 1999 年 2000 年

年 1996 年 1997 年 1998 年 1999 年 2000 年 1990 1,050 2000 7,644 2020 1 1,830 1990 94 2000 1,441 3 3 1 2 3 2 1. (1) 1981 1980 34 1990 1,000 2000 7,640 75 25 65.6 17.9 2000 5,769 3.5 1,370 23.7 1,284 22.3% 490 8.5% 3 3,140 55 1 1 1 100 80 73.8 76.4

More information

スライド タイトルなし

スライド タイトルなし 1 2 3 4 27,500 5 6 2000 7 8 9 10 11 12 < 13 SPECIFICATION CHARACTERISTICS UNIT Regular Gasoline Premium Gasoline METHOD A Type C Type A Type C Type ABNT ASTM Color - (1) (2) (1) (2) Appearance - (4) (4)

More information

Microsoft PowerPoint - 05.奥村.ppt

Microsoft PowerPoint - 05.奥村.ppt 衛星データを用いた水稲収量予測システムの試作 平成 24 年 9 月 13 日研究開発部奥村俊夫 背景 RESTEC では これまで農業リモートセンシングに取り組んで来た 近年では H21 年度 H22 年度に農林水産省殿の 水稲作付面積調査における衛星画像活用事業 において SAR 光学センサを用いた水稲作付面積の求積システムの開発に携わった これらの経験を活かして H23 年度に JAXA 殿の事業において

More information

価格表-1左頁-apl-C2

価格表-1左頁-apl-C2 20144 RE-7301RE-8353 2014-2016 201014 2013-2015 201014 2014-2016 P.1 P.3 P.5 P.17 P.28 P.29 1 SV Standard Value SV RAL 0.2mg/ 0.1mg/kg VOC 30mg/kg 20mg/kg 5mg/kg TVOC100g/gTEX10g/g 300CDBP 1571 282 3 1571

More information

(Shigen to Sozai) Vol.116 p (2000) 石炭灰フライアッシュからのゼオライトのアルカリ水熱合成と生成物の陽イオン交換特性 * 1 1 村山憲弘山川洋亮 2 3 小川和男芝田隼次 Alkali Hydrothermal Synthesis of Zeol

(Shigen to Sozai) Vol.116 p (2000) 石炭灰フライアッシュからのゼオライトのアルカリ水熱合成と生成物の陽イオン交換特性 * 1 1 村山憲弘山川洋亮 2 3 小川和男芝田隼次 Alkali Hydrothermal Synthesis of Zeol 石炭灰フライアッシュからのゼオライトのアルカリ水 Title 熱合成と生成物の陽イオン交換特性 Author(s) 村山, 憲弘, 山川, 洋亮, 小川, 和男, 芝田, 隼次 Citation 資源と素材 : 資源 素材学会誌, 116(4): 279-284 Issue Date 2000 URL http://hdl.handle.net/10112/5454 資源 素材学会 (http://www.jstage.jst.go.

More information

NL-20取扱説明書_操作編

NL-20取扱説明書_操作編 MIC / Preamp A C AMP 1 AMP 2 AMP 3 FLAT FLAT CAL.SIG. OVER LOAD DET. AMP 4 AMP 5 A/D D/A CONV. V ref. AMP 8 AMP 10 DC OUT AC OUT AC DC OUT DATA BUS CPU ADDRESS BUS DSP Start Pause Stop Store Mode Cont

More information

求人面接資料PPT

求人面接資料PPT Hair Salon TV etc. 250" 250" 200" 200" 150" 150" 100" 100" 50" 50" 0" 0" Nov)13" Dec)13" Jan)14" Feb)14" Mar)14" Apr)14" May)14" Jun)14" Jul)14" Dec)12" Jan)13" Feb)13" Mar)13" Apr)13"

More information

OPA134/2134/4134('98.03)

OPA134/2134/4134('98.03) OPA OPA OPA OPA OPA OPA OPA OPA OPA TM µ Ω ± ± ± ± + OPA OPA OPA Offset Trim Offset Trim Out A V+ Out A Out D In +In V+ Output In A +In A A B Out B In B In A +In A A D In D +In D V NC V +In B V+ V +In

More information

<4D F736F F D208F4390B38DC58F49938A8D6595A CA90858D48985F95B F8F43959C82B382EA82BD B5F2E646F6378>

<4D F736F F D208F4390B38DC58F49938A8D6595A CA90858D48985F95B F8F43959C82B382EA82BD B5F2E646F6378> ,54,20102 CHARACTERISTICS OF COHERENT STRUCTURE IN COMPOUND OPEN CHANNEL FLOWS WITH DEEP FLOOD PLAIN DEPTH 1 2 3 Katsutoshi WATANABE, Yousuke TOKUMITSU, Haruka YOSHINAGA 1 745-8585 3538 2 3 733-0812 13-7-502

More information

PALL NEWS vol.126 November 2017

PALL NEWS vol.126 November 2017 PALL NEWS November 2017 Vol.126 PALL NEWS vol.126 November 2017 NEW =2000 9660 41.4 MPa 24 MPa NFPA T2.06.01 R2-2001 CAT C/90/* (1x10 6 0-28 MPa 1x10 6 29 120 C 60 C 450 Pa 340 Pa 1 MPa JIS B 8356-3/ISO

More information

42 3 u = (37) MeV/c 2 (3.4) [1] u amu m p m n [1] m H [2] m p = (4) MeV/c 2 = (13) u m n = (4) MeV/c 2 =

42 3 u = (37) MeV/c 2 (3.4) [1] u amu m p m n [1] m H [2] m p = (4) MeV/c 2 = (13) u m n = (4) MeV/c 2 = 3 3.1 3.1.1 kg m s J = kg m 2 s 2 MeV MeV [1] 1MeV=1 6 ev = 1.62 176 462 (63) 1 13 J (3.1) [1] 1MeV/c 2 =1.782 661 731 (7) 1 3 kg (3.2) c =1 MeV (atomic mass unit) 12 C u = 1 12 M(12 C) (3.3) 41 42 3 u

More information

10 117 5 1 121841 4 15 12 7 27 12 6 31856 8 21 1983-2 - 321899 12 21656 2 45 9 2 131816 4 91812 11 20 1887 461971 11 3 2 161703 11 13 98 3 16201700-3 - 2 35 6 7 8 9 12 13 12 481973 12 2 571982 161703 11

More information

31 gh gw

31 gh gw 30 31 gh gw 32 33 1406 1421 640 0 (mm) (mm) MAX1513 MIN349 MIN280 MAX900 gh gw 34 gh gh gw gw gh gh gw gw gh gh gw gw 35 175 176 177 178 179 180 181 195 196 197 198 202 203 2 1 L L L2 L2 L2 L 2 2 1 L L

More information

0.45m1.00m 1.00m 1.00m 0.33m 0.33m 0.33m 0.45m 1.00m 2

0.45m1.00m 1.00m 1.00m 0.33m 0.33m 0.33m 0.45m 1.00m 2 24 11 10 24 12 10 30 1 0.45m1.00m 1.00m 1.00m 0.33m 0.33m 0.33m 0.45m 1.00m 2 23% 29% 71% 67% 6% 4% n=1525 n=1137 6% +6% -4% -2% 21% 30% 5% 35% 6% 6% 11% 40% 37% 36 172 166 371 213 226 177 54 382 704 216

More information

Size Effect of Biomass on Carbonization Rate Treated in Superheated Steam Combined with Far Infrared Heating Akiko ISA Yoshio HAGURA and Kanichi Kit Graduate School of Biosphere Science, Hiroshima University,

More information

( ) : 1997

( ) : 1997 ( ) 2008 2 17 : 1997 CMOS FET AD-DA All Rights Reserved (c) Yoichi OKABE 2000-present. [ HTML ] [ PDF ] [ ] [ Web ] [ ] [ HTML ] [ PDF ] 1 1 4 1.1..................................... 4 1.2..................................

More information

untitled

untitled TEM with CCD Ver. 5.1 18 10 25 6 50 FILAMENT OFF 80 V () FILAMENT 2 25 FILAMENT OFF FILAMENT 1 min 2-5 L TEM(&CCD) FILAMENT ON CCD( ) - 1 - 3 TEM 3 CCD 3 4 5 6 7 (CCD ) 7 CCD 7 10 10 11 CCD &TEM 11-2 -

More information

FERRITES March 2014 Mn-Zn EPC

FERRITES March 2014 Mn-Zn EPC March 214 Mn-Zn EPC (2/29) AV OA (3/29) RoHS EPC EPC PC47 EP Z - 1 2 AL-value Z: PC47 EP 1 PC9 EP3 2 PC95 EP7 EP9 EPC25 EPC25B EPC27 EPC3 C C 3 to +5 3 to +85 RoHSRoHS http://www.tdk.co.jp/rohs/ Cl 9ppm

More information

平成9年度水道事業年報 1概況 2施設

平成9年度水道事業年報 1概況 2施設 () (mm) 12 3 31 12 3 31 4 5 6 7 8 9 10 11 12 1 2 3 145,085 146,117 146,352 146,409 146,605 146,685 146,807 147,014 147,002 147,277

More information

Biodegradables 40km 2017 4 2 2017 73.3t/ 3-1-1-3-1 - 22 11 Naguilian - 3-2 - H23 2011 11 11 4:30 8:30 H24 2012 9 21 2012 10 23 2013 1 24 3 3-1-4~ 3-1-6 3-1-1~ 3-1-3-3-3 - - 3-4 - - 3-5 - - 3-6 - 3-1-2

More information

untitled

untitled 5 September 2008 1. 2. 3. (1) (2) (3) NKKTubes Tenaris TESA Asia Pacific 2 1. ERD UDD ERD 6 30m UDD T D/TVD 0.25 DSTJ DSTJ-ST S150 KNOTTY HEAD WELL 34189 10420 NKKTubes Tenaris TESA Asia Pacific 3 NKKTubes

More information

1 1 H Li Be Na M g B A l C S i N P O S F He N Cl A e K Ca S c T i V C Mn Fe Co Ni Cu Zn Ga Ge As Se B K Rb S Y Z Nb Mo Tc Ru Rh Pd Ag Cd In Sn Sb T e

1 1 H Li Be Na M g B A l C S i N P O S F He N Cl A e K Ca S c T i V C Mn Fe Co Ni Cu Zn Ga Ge As Se B K Rb S Y Z Nb Mo Tc Ru Rh Pd Ag Cd In Sn Sb T e No. 1 1 1 H Li Be Na M g B A l C S i N P O S F He N Cl A e K Ca S c T i V C Mn Fe Co Ni Cu Zn Ga Ge As Se B K Rb S Y Z Nb Mo Tc Ru Rh Pd Ag Cd In Sn Sb T e I X e Cs Ba F Ra Hf Ta W Re Os I Rf Db Sg Bh

More information

本文

本文 Apr 11, 213 (3-3497-3675) miwa-y @itochu.co.jp (3-3497-6284) maruyama-yo @itochu.co.jp 1. (1) (2) (3 (4) 2. (1)3 (2) (3)J (4) (5) (6) (7) (8) (9) (1) 46 3. Summary 2 2% 2 13 13 13 J 79 46 13 46 4 34 2%

More information

技術会議資料

技術会議資料 La-Mg-Ni 2 H 2 O e - e - H OH - H + e - H H 2 O OH - H + e - O H O Ni Ni O H O H 3 La, Pr, Nd, etc. Ni, Co, Mn, Al, etc. 0 0.2 0.4 0.6 0.8 1 H/M Equilibrium Hydrogen Pressure MPa (MPa) 10 1 0.1 0.01 0.001

More information

Neutron yield M.R. Hawkesworth, Neutron Radiography: Equipment and Methods, Atomic Energy Review 15, No. 2, , n µc -1 = n/(µa s) ~10 12 n

Neutron yield M.R. Hawkesworth, Neutron Radiography: Equipment and Methods, Atomic Energy Review 15, No. 2, , n µc -1 = n/(µa s) ~10 12 n Cross Section 7MeV Proton Linac AFRD, LBL (courtesy of Jani Reionen) LINAC SYSTEMS Applied Pulsed Power Plasma Target D+D reaction driven by LASER Neutron yield M.R. Hawkesworth, Neutron Radiography: Equipment

More information

untitled

untitled 1.0 1. Display Format 8*2 Character 2. Power Supply 3.3V 3. Overall Module Size 30.0mm(W) x 19.5mm(H) x max 5.5mm(D) 4. Viewing Aera(W*H) 27.0mm(W) x 10.5mm(H) 5. Dot Size (W*H) 0.45mm(W) x 0.50mm(H) 6.

More information

筑波大学第一学群自然学類 水文学野外実験B実施計画

筑波大学第一学群自然学類 水文学野外実験B実施計画 B 2004 11 24 29 B(C44 0803) (02AA251) 2004 11 26 11 29 2004 11 24 11 29 3 1 M2 M2 B4B4 M2M2 M2M1 M1B4 11/2427 () 11/2426 869-0562 4205-3 / Tel: 0964-42-3111 / Fax: 0964-42-3200 3990 840 530 1200 0.01 km

More information

LAGUNA LAGUNA 10 p Water quality of Lake Kamo, Sado Island, northeast Japan, Katsuaki Kanzo 1, Ni

LAGUNA LAGUNA 10 p Water quality of Lake Kamo, Sado Island, northeast Japan, Katsuaki Kanzo 1, Ni LAGUNA10 47 56 2003 3 LAGUNA 10 p.47 56 2003 1997 2001 1 2 2 Water quality of Lake Kamo, Sado Island, northeast Japan, 1997 2001 Katsuaki Kanzo 1, Niigata Prefectural Ryotsu High School Science Club, Iwao

More information

円借款案件・事後評価報告書1999(全文・上巻)

円借款案件・事後評価報告書1999(全文・上巻) 8 1999 3 199812 () 19919 19919 19981 7,854 5,335 3.0% 257 239 (1) (B) (2) 1991 1992 1993 1994 1995 JP US$ 134.71 126.65 111.20 102.21 94.06 BUS$ 025.47 025.39 025.35 025.00 025.14 CPI 105.7 110.0 113.7

More information

On model selection problems in terms of prediction mean squared error and interpretaion of AIC (slides)

On model selection problems in terms of prediction mean squared error and interpretaion of AIC (slides) Applications in Econometrics and Finance by Long Memory Processes 2007 11 6 13:30-16:10 Table of Contents PART1 PART2 PART3 PART1 1 {y t } ρ(h) = ( h ) = Cov[y t y t+h ]/ Var[y t ] (yt y)(y t+h y) ρ(h)

More information

過電流保護用/突入電流抑制用/過熱検知用"ポジスタ"

過電流保護用/突入電流抑制用/過熱検知用ポジスタ r rr r r! r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r 9 8 7 9 8 7 6 5 4 6 5 4 3 3-3 4 5 6-3 4 5 6 4 8 6 4 8 6 4-3

More information

IEEE HDD RAID MPI MPU/CPU GPGPU GPU cm I m cm /g I I n/ cm 2 s X n/ cm s cm g/cm

IEEE HDD RAID MPI MPU/CPU GPGPU GPU cm I m cm /g I I n/ cm 2 s X n/ cm s cm g/cm Neutron Visual Sensing Techniques Making Good Use of Computer Science J-PARC CT CT-PET TB IEEE HDD RAID MPI MPU/CPU GPGPU GPU cm I m cm /g I I n/ cm 2 s X n/ cm s cm g/cm cm cm barn cm thn/ cm s n/ cm

More information

有明海・八代海総合調査評価委員会-中間取りまとめ-

有明海・八代海総合調査評価委員会-中間取りまとめ- COD 1 15 B-3() St.7() B-2() A-2() St.9() St.1() B-2() B-1() 13 16 4 2 3 5 6 7 () St.7() St.9() 12 11 8 () 9 1 Km 1K St-1() St-7() 5() 7 () COD T-N T-P SS St.7() St.9() St.1() St.7() + St.9() () () A-2()

More information

positron 1930 Dirac 1933 Anderson m 22Na(hl=2.6years), 58Co(hl=71days), 64Cu(hl=12hour) 68Ge(hl=288days) MeV : thermalization m psec 100

positron 1930 Dirac 1933 Anderson m 22Na(hl=2.6years), 58Co(hl=71days), 64Cu(hl=12hour) 68Ge(hl=288days) MeV : thermalization m psec 100 positron 1930 Dirac 1933 Anderson m 22Na(hl=2.6years), 58Co(hl=71days), 64Cu(hl=12hour) 68Ge(hl=288days) 0.5 1.5MeV : thermalization 10 100 m psec 100psec nsec E total = 2mc 2 + E e + + E e Ee+ Ee-c mc

More information

橡H10タイ第2章..doc

橡H10タイ第2章..doc 53 55 14001 1 5 BOD 1 2 2 56 1 1993 10 1998 23 ISO14001 20 1997 JICA ERTC: Environmental Research Training Center 10 1997 7 57 12 1 11 12 1 11 2 9 Federation of Thai Industries 58 59 1 1 A 9 I 2,900 1996

More information

1

1 PICKING AND STORAGE SYSTEM 1 2 Shuttle XP 3 4 Shuttle XP 5 GH GT GB TH EP 6 Shuttle XP 7 Shuttle XP 8 Shuttle XP 9 Shuttle XP 10 Shuttle XP 11 Shuttle XP 12 Shuttle XP 13 Shuttle XP 14 15 16 17 18 19 20

More information

2009 SEP. No.664 9 18 100460345 209710798 %0.11 3350955 9750799 12.1 0.93 100350 19 100600453 209700800 %0.03 3200065 9740873 11.0 0.98 90490 20 100750364 209680396 %0.81 321 844 978 591 11.6

More information

初めに:

初めに: 2 Copyrightc2008 JETRO. All rights reserved. FAX 03-5572-7044 ...5...6 (1)...7... 11... 11...12...14...15...15...16...17...18 (4)...21 (5)...21 (6)...23 4 Copyrightc2008 JETRO. All rights reserved. 5 Copyrightc2008

More information

050920_society_kmiz.odp

050920_society_kmiz.odp 1 リアルタイム伝搬測定にもとづく MIMO 固有モード間相関解析 Correlation Analysis of MIMO Eigenmodes Based on Real-Time Channel Measurement 水谷慶阪口啓高田潤一荒木純道 Kei Mizutani Kei Sakaguchi Jun-ichi Takada Kiyomichi Araki 東京工業大学 発表内容 研究背景

More information

untitled

untitled 71 7 3,000 1 MeV t = 1 MeV = c 1 MeV c 200 MeV fm 1 MeV 3.0 10 8 10 15 fm/s 0.67 10 21 s (1) 1fm t = 1fm c 1fm 3.0 10 8 10 15 fm/s 0.33 10 23 s (2) 10 22 s 7.1 ( ) a + b + B(+X +...) (3) a b B( X,...)

More information

50. (km) A B C C 7 B A 0

50. (km) A B C C 7 B A 0 49... 5 A B C. (. )?.. A A B C. A 4 0 50. (km) A B C..9 7. 4.5.9. 5. 7.5.0 4..4 7. 5.5 5.0 4. 4.. 8. 7 8.8 9.8. 8 5. 5.7.7 9.4 4. 4.7 0 4. 7. 8.0 4.. 5.8.4.8 8.5. 8 9 5 C 7 B 5 8 7 4 4 A 0 0 0 4 5 7 8

More information

XV-Z10000(J)Ł\1-4.p65

XV-Z10000(J)Ł\1-4.p65 http://www.sharp.co.jp/ 4 2-JW age 2 2..5, :42 2 age 2 2..5, :44 3 age 3 2..5, :44 4 2..5, :44 age 4 5 2..5, :44 age 5 6 2..5, :44 age 6 7 2..5, :44 age 7 8 age 8 2..5, :45 75 76 9 age 9 2..5, :45 4 4

More information

Microsoft Word - 01マニュアル・入稿原稿p1-112.doc

Microsoft Word - 01マニュアル・入稿原稿p1-112.doc 4 54 55 56 ( ( 1994 1st stage 2nd stage 2012 57 / 58 365 46.6 120 365 40.4 120 13.0 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 4 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97

More information

a b Chroma Graphein Chromatography

a b Chroma Graphein Chromatography a b Chroma Graphein Chromatography (Stationary Phase) (Mobile Phase) CHROMATOGRAPHY GAS SFC LIQUID GSC GLC Column Planar NP RP IEC SEC TLC Paper Normal Phase Reverse Phase GPC GFC Thin Layer Chromato.

More information

りん酸形燃料電池の現状と今後の展望

りん酸形燃料電池の現状と今後の展望 The Current Status and the Future Prospects of Phosphoric Acid Fuel Cell Kazuaki KOSHI Key Words: Fuel Cell, Phosphoric acid,, Digester gas, Bio gas, Hydrogen high efficent clean energy saved IPCC 4 20

More information

Technical YKVバルブ入門書      コントロールバルブ

Technical YKVバルブ入門書      コントロールバルブ 1/28 Technical YKV Information 2 2 2 2 3 3 3 4 4 4 YKV 5 5 6 6 7 7 8 ShearStream 9 Valdisk 9 9 10 10 11 12 13 14 14 15 15 Cv 17 17 17 17 18 18 22 22 22 23 23 24 26 27 2/28 VALVE 3/28 ShearStream Valdisk

More information

AD8212: 高電圧の電流シャント・モニタ

AD8212: 高電圧の電流シャント・モニタ 7 V typ 7 0 V MSOP : 40 V+ V SENSE DC/DC BIAS CIRCUIT CURRENT COMPENSATION I OUT COM BIAS ALPHA 094-00 V PNP 0 7 V typ PNP PNP REV. A REVISION 007 Analog Devices, Inc. All rights reserved. 0-9 -- 0 40

More information

Al-Si系粉末合金の超塑性

Al-Si系粉末合金の超塑性 Superplasticity of Al-Si P/M Alloys Satoru Ishihara, Mikio Kondoh, Kazuhiko Itoh Al-17Si-4.5Cu-0.5Mg-(06)Fe-(02)Mm ( Mm : ) (i) (ii) Si(iii) Fe (iv) Mm Al-17Si-4.5Cu-0.5Mg500 10 2 s 1 520 110 1 s 1 Si

More information

ja111_rkw.fm

ja111_rkw.fm (1/) AC UL/C-UL/TÜV RoHS RRKWW1.5kW No.1 ///1///1.5kW768 EN-3-2W AC.-V EN82-2 FCC-BVCCI-B RV//1.5kW CE H 5F 1W PBDPEsPBBs 24V1W RoHS V W W W 1W A A A A 3.3 7 RKW3-7R 12 RKW3-12R 25 RKW3-25R 35 RKW3-35R

More information

596_H1H4.indd

596_H1H4.indd 2014 Aug. 8No.596 http://www.saitama-ctv-kyosai.net 1021 1125 1127 10 10 27 11 11 17 11 11 20 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27

More information

untitled

untitled 14.10,, 2 () () () (50cm ) (50cm ) CXP-5,7,10 BOD20mg/L(ppm) (BOD) CXP-5,7 CXP 1. 2. 3. 4. (300 ) 5. :5 7 10 :200L/ BOD :200 /L BOD :20 /L CXP 2 (24 3 ) V=1.5+(n-5)0.4 1 2 :3/5V :2/5V 40% 60% V=1+(n-5)0.2

More information

NJW4124 IC ( ) NJW4124 AC-DC 1cell/2cell IC / 1 NJW4124M / Bi-CMOS NJW4124M : DMP20 P-CHG 1 20 Q-CHG NFB 2 19 CS1 TX-SW 3 18 CS2 GND 4 17 VS PC 5 16 V

NJW4124 IC ( ) NJW4124 AC-DC 1cell/2cell IC / 1 NJW4124M / Bi-CMOS NJW4124M : DMP20 P-CHG 1 20 Q-CHG NFB 2 19 CS1 TX-SW 3 18 CS2 GND 4 17 VS PC 5 16 V IC ( ) AC-DC 1cell/2cell IC / 1 M / Bi-CMOS M : DMP20 P-CHG 1 20 Q-CHG NFB 2 19 CS1 TX-SW 3 18 CS2 GND 4 17 VS PC 5 16 VREF ADP 6 15 V + 7 14 TDET 8 13 TH C1 9 12 TL C2 10 11 CHG-SW M - 1 - (Ta=25 C) V

More information

橡図表リスト.PDF

橡図表リスト.PDF 3-2-3 3-54 The Basic Design Study on the Project for Construction and Supply of Medical Equipment for Princess Margaret Hospital in Tuvalu ITEMS Q'ty 1 Anesthesia Apparatus with Ventilator

More information

36 th IChO : - 3 ( ) , G O O D L U C K final 1

36 th IChO : - 3 ( ) , G O O D L U C K final 1 36 th ICh - - 5 - - : - 3 ( ) - 169 - -, - - - - - - - G D L U C K final 1 1 1.01 2 e 4.00 3 Li 6.94 4 Be 9.01 5 B 10.81 6 C 12.01 7 N 14.01 8 16.00 9 F 19.00 10 Ne 20.18 11 Na 22.99 12 Mg 24.31 Periodic

More information

Analysis of Hypoxia Dynamics Using Pelagic and Benthic Biogeochemical Model: Focus on the Formation and Release of Hydrogen Sulfide Masayasu IRIE, Shu

Analysis of Hypoxia Dynamics Using Pelagic and Benthic Biogeochemical Model: Focus on the Formation and Release of Hydrogen Sulfide Masayasu IRIE, Shu Analysis of Hypoxia Dynamics Using Pelagic and Benthic Biogeochemical Model: Focus on the Formation and Release of Hydrogen Sulfide Masayasu IRIE, Shuzo NISHIDA, Kyosuke TERANAKA, Yohei TSUJI Mitsunari

More information

96R22J NN396AEVB

96R22J NN396AEVB 96R22J Total Pages 4 Page The product specifications described in this book are subject to change without notice for the product which is currently under development. At the final stage of your design,

More information

5 11 3 1....1 2. 5...4 (1)...5...6...7...17...22 (2)...70...71...72...77...82 (3)...85...86...87...92...97 (4)...101...102...103...112...117 (5)...121...122...123...125...128 1. 10 Web Web WG 5 4 5 ²

More information

PowerPoint プレゼンテーション

PowerPoint プレゼンテーション LANDSAT-5/TM July 03 97 SPOT-2/HX July 03 97 SPOT-2/Pan July 03 97 JERS-1/OPS July 05, 97 ERS-2 ORBIT:0009125 Date: 1997/01/17 Frame center: N 37.20 E 136.73 SPOT Date: 1997/01/17 Sensor: HX Path: 324

More information

Clay Minerals in the Amakusa Pottery Stones and Some Features of Their Pottery Clays. Surface Charge of Sericite and Dispersion- Coagulation Propertie

Clay Minerals in the Amakusa Pottery Stones and Some Features of Their Pottery Clays. Surface Charge of Sericite and Dispersion- Coagulation Propertie Clay Minerals in the Amakusa Pottery Stones and Some Features of Their Pottery Clays. Surface Charge of Sericite and Dispersion- Coagulation Properties of Pottery Clay in Water Hiroshi TATEYAMA, Hideharu

More information

H1.4=02

H1.4=02 LAYOUT 03 OFFICE 05 07 08 09 11 11 SCHOOL 12 12 D A I L Y 13 14 15 D A I L Y 16 INDEX 18 Prefabricated House 2F P.15 P.08 P.15 P.09 03 P.07 P.07 P.05 9,175 P.08 7,355 1F P.11 P.17 P.07 9,175 7,355 P.07P.17P.13

More information

<8B5A8F70985F95B632936EE7B22E696E6464>

<8B5A8F70985F95B632936EE7B22E696E6464> 47 Electrical Discharge Truing for Electroplated Diamond Tools Koji Watanabe Hisashi Minami Hatsumi Hiramatsu Kiyonori Masui (211 7 8 ) Electroplated diamond tools are widely used for grinding because

More information

第3章 焼却灰溶融システムの現状、焼却灰溶融スラグのリサイクルの動向・問題点

第3章  焼却灰溶融システムの現状、焼却灰溶融スラグのリサイクルの動向・問題点 18 5 23 450 100~150 1300 1998 10 25 1 1 27 1819 60 3 300t 28.8t 2 62 118t16 12.3 16h 24 3 4 120t 9.6t24h 3 4 100t24h 15t24h 3 4 600t24h 500t24h 5 2 300t24h 75t24h 6 8 80 24h 9.6 24h 4 300t24h 52 24 11

More information