FACT-FINDING IN EAST KALIMANTAN RAILWAY FOR COAL TRANSPORT

Size: px
Start display at page:

Download "FACT-FINDING IN EAST KALIMANTAN RAILWAY FOR COAL TRANSPORT"

Transcription

1 FACT-FINDING IN EAST KALIMANTAN RAILWAY FOR COAL TRANSPORT IN INDONESIA Study Report December 2004 Engineering and Consulting Firms Association, Japan Nippon Koei Co., Ltd.

2 Table of Contents 1. BACKGROUND AND OBJECTIVE Background Objective COAL IN THE WORLD Coal Consumption Coal Trade Coal Reserves COAL OPERATIONS IN INDONESIA Coal Reserve Coal Mining and Production Domestic Demand Export COAL STRATEGY OF INDONESIA Coal Policy COAL MININGS IN KALIMANTAN Coal Concessions in Kalimantan Coal Production and Its Transportation Coal Flow Past Discussions on Coal Transport in Kalimantan COAL TRANSPORTATION Present State of Coal Transportation in Kalimantan Coal Terminal Transportation of Coal from Mine to Coal Terminal PRELIMINARY PROJECT JUSTIFICATION AND BUSINESS SCHEME Preliminary Economic Evaluation of PPP Based Program General Economic Cost Economic Benefit Economic Evaluation Likely organization and Business Scheme General Likely Organization Likely Financing Scheme Preliminary Financial Evaluation General Financial Cost Financial Benefit Financial Evaluation Proposed Tariff Structure...i 8. CONCLUSION AND NEXT STUDY...II 8.1 Conclusion...ii 8.2 Next Step and Implementation Shedule...iii - i -

3 FACT-FINDING IN EAST KALIMANTAN RAILWAY FOR COAL TRANSPORT IN INDONESIA 1. BACKGROUND AND OBJECTIVE 1.1 BACKGROUND The total coal reserves in Indonesia are estimated as 38.9 billion tons and 54% of it (21 billion tons) is located in Kalimantan. Of these 21 billion tons, 6.6 billion tons are measured reserves, and 2.5 billion tons are mineable reserves. Indonesia dramatically increases its coal production in last two decades; 0.34 million tones in 1980, million tones in 1983 and million tones in This dramatic change in coal production mainly comes from the introduction of Coal Contract of Work with Production Sharing Scheme in 1981, that is to say the introduction of foreign capital to Indonesian coal world. Indonesia exported the 74% of nationwide produced coal (85.68 million tons) in 2003, and of these 21.0% (17.99 million tons) exported to Japan. As regards to the Kalimantan coal, the 78% of produced coal was exported in In Kalimantan, the 1 st generation contractor s coal mining sites locate near the coastline and they transport their products from mining site to port with track, conveyer belt or barge. The 2 nd and 3 rd generation contractor s mining sites locate far from coastline so that there is a difficulty in developing their mines especially in transportation of their products. It is mandatory for developing the inland coal mines to establish the efficient and cheap transportation system, using railway system. In the course of inland coal transport development, not only the railway system but also port facility development as the coal terminal is indispensable. 1.2 OBJECTIVE The objectives of the study are as follows; Study on the coal mine development plan and coal transport demand in Kalimantan. Study on the potential of railway coal transport system with the private investments. Implementation planning for the next action

4 2. COAL IN THE WORLD 2.1 COAL CONSUMPTION The world coal consumption has varied for decades. Although its value in 2001 was 27% greater than that in 1980, it was 1% less than the recorded maximum in 1989 at 5.31 billion short tons, as seen in Figure 2.1. According to the International Energy Outlook 2004 (IEO, Energy Information Administration, Office of Integrated Analysis and Forecasting, U.S. Department of Energy), the prospects of the coal industries are brilliant in the world, especially as the energy source in electricity generation. The world coal consumption is estimated to increase from 5.3 billion short tons in 2001 to 7.5 billion short tons in 2025, by the average annual rate of 1.5% with considerable variation among regions. 10 Billion Short Tons High Economic Growth Reference Case Low Economic Growth 2 0 History Projections Year Source: International Energy Outlook 2004, April 2004, Energy Information Administration, Office of Integrated Analysis and Forecasting, U.S. Department of Energy, Washington, DC Figure 2.1 World Coal Consumption, Coal use is expected to increase in the most of regions in the world. Exceptions are Western Europe, Eastern Europe, and the former Soviet Union outside Russia. In these exceptional countries, coal consumption remarkably declined in 1990s, primarily due to displacement with alternative energy sources like natural gas. It is expected that large increase of coal consumption in energy use projected for the developing Asian countries will raise the world coal consumption in the future. In developing Asia, like China and India, coal will continue to dominate many fuel markets. Because of very large countries in terms of both population and landmass, the expected increases in coal use in the developing Asia from 2001 to 2025 account for 76% of the total expected increase in coal use worldwide on a Btu 1 basis. The coal consumption in the developing Asia is estimated to increase from 2.1 billion short tons in 2001 to 3.8 billion short tons, more than 83% of increase. 1 Btu = British thermal units = 1,054.5 joule - 2 -

5 The developing Asian countries consumed 40% of the world s coal in The developing Asia is projected by IEO to share the coal consumption over one half of the world s total by The large increase of the coal consumption expected for the developing Asia will result from the strong economic growth in the region. In fact, the GDP growth is estimated to be 5.1% p.a. for the developing Asia between 2001 and China and India are the dominant driving forces behind the coal consumption increase in the developing Asia. The increased demand of coal in the region will be particularly by the industrial and electricity sectors. According to the IEO, investment is necessary for the developing Asia s mines, transportation, industrial facilities, and power plants. When excluding China and India from the developing Asia, however, the coal consumption rise is projected considerably small over the forecast period up to This expectation comes from the projected growths in coal-fired electricity generation in South Korea, Taiwan, Indonesia and other ASEAN member countries, like Malaysia, the Philippines, Thailand, and Vietnam. According to the IEO, coal s share of fuel consumption for electricity generation in the region will decrease from 33% in 2001 to 27% in The suppressive motivation against the dramatic increase in coal use in the non-china and non-india developing Asia is diversity of energy sources for electricity generation, primarily to natural gas. This motivation exists even in countries that have abundant reserves of natural gas, such as Indonesia, Thailand, Malaysia, and the Philippines. Despite the energy source diversity, increase of coal use in the region will not be fully suppressive. There exist a lot of plans to increase power generation capacity in coal-fired plants for 2002 and later in the non-china and non-india developing Asia. Respective capacity additions including new power stations are reportedly, 12.3 GW for South Korea, 10.6 GW for Taiwan, 6.6 GW for Malaysia, 3.8 GW for Indonesia, and several GW in Thailand and the Philippines. It should be noted that because of environmental concerns there are arguments against the addition of coal-fired capacity in Southeast Asia, particularly for countries such as Thailand and the Philippines. A number of individuals and NGOs protest that electricity generation by natural gas be a wiser choice than constructing new coal-fired power plants. 2.2 COAL TRADE The international coal trade is relatively small compared with the world consumption. In 2001, world imports of coal counted 656 million tons, only 13% of the total consumption at 4.8 billion tons. IEO projects that coal imports worldwide will increase to total 919 million tons in 2025, accounting for a 12% share of the world coal consumption. In recent years, international coal trade has been characterized by strong growth in imports in Asia and moderate growth in Western Europe. Rising production costs in the indigenous coal industries of Western Europe have brought enormous declines of coal production within their countries and significant increases of coal imports. In Asia, strong growth in coal demand in Japan, South Korea, and Taiwan in recent years has contributed to a substantial rise in the region s coal trade

6 Australia United States South Africa Former Soviet Union Poland Canada China Indonesiae Million Short Tons Source: International Energy Outlook 2004 (Table 13), April 2004, Energy Information Administration, Office of Integrated Analysis and Forecasting, U.S. Department of Energy, Washington, DC Figure 2.2 Coal Exports by Major Exporter Countries After 2002, the international coal markets have experienced dramatic changes in price. Although the international coal price was fairly stable in 2002, it has been dramatically raised in Ocean freight for coal transport rose in The freight rise was mainly attributable to a substantial increase in imports of iron ore by Chinese steel producers. The present freight rates for major coal export routes are more than triple the rates in Some coal exporting countries, such as China, Indonesia, and South Africa recently have gotten into the coal export business, have increased their export amount substantially over the past few years. Between 1998 and 2001, coal exports from China expanded remarkably by 178%, from 36 million tons to 100 million tons. Although its coal exports slipped down to 92 million tons during 2002, China maintained its position as the second leading coal exporter in the world, ahead of Indonesia and South Africa. Japan will remain as the world s leading importer of coal. Its import share is estimated to be 22% in the world in 2025, slightly less than 26% of share in recorded in In 2002, Japan produced approximately 1 million tons of coal for domestic consumption and imported 172 million tons. Despite a less dominant role than before, coal demand in Japan will continue to exert considerable influence in the coal price especially in the Asian coal market

7 $US/ton BJI: FOB coal price in New Castle Port Japan Long-term Contract: Long-term contract for export to Japan from New Castle Port Source: Coal 2003, Barlow Jonker Figure 2.3 Prices of Export Coal in New Castle Port 2.3 COAL RESERVES According to Energy Information Administration, USA, total recoverable reserves of coal in the world are 1,083 billion tons enough to last approximately 210 years at current consumption levels. Although coal deposits are broadly distributed, 60% of the world s recoverable reserves are located in three countries; the United States (25%), Russia (23%), and China (12%). Indonesia shares only 0.55% of the world reserves. Quality of coal deposits is also important for coal reserves. Its quality varies significantly from one region to another. Despite 18% of share in the world coal production, low-btu lignite or brown coal is not traded in the world markets. Quality of lignite varies; 4.55 million Btu per ton to million Btu per ton in terms of the average heat content

8 United States Russia China India Australia Germany South Africa Ukraine Kazakhstan Poland Yugoslavia Indonesia Others Recoverable Anthracite and Bituminous Recoverable Lignite and Subbituminous Billion Short Tons Source: Energy Information Administration, International Energy Annual 2002 Figure 2.4 World Recoverable Coal Reserve - 6 -

9 3. COAL OPERATIONS IN INDONESIA 3.1 COAL RESERVE The coal resources in Indonesia exist in Sumatra, Kalimantan, Sulawesi, Papua and Java. According to the Directorate of Coal, MEMR, the total reserve is billion tons of which the proved recoverable reserve is 5.4 billion tons, the proved amount in place is 11.6 billion tons, and the estimated additional amount in place is 27.3 billion tons. The coal quality is relatively low and its distribution corresponds to 58% for lignite, 27% for sub-bituminous, and 14% for bituminous. The water content is rather high at 20% to 40%. Caloric value is not very high and the majority is less than 5,000 kcal/kg. Table 3.1 Coal Reserve in Indonesia Area Proved Estimated Proved Amount Recoverable Additional in Place Reserve Amount in Place Total Reserve Sumatra 2,825 4,258 9,015 13,273 Java Kalimantan 2,505 6,640 14,573 21,213 Others ,713 4,383 Total 5,368 11,569 27,306 38, COAL MINING AND PRODUCTION At present, the most of coal mining in Indonesia is of open-pit. The mining sites are generally located near the seacoasts or big rivers, looking for easier transportation of coal. Indonesian coal is being produced by four main groups, namely, State Owned Corporation (BUMN), mining contractors (PKP2B), mining concessionaires (KP holders), and mining cooperatives (KUD). Today, there are 33 coal companies at production stage; 2 mines of BUMN, 19 mines of PKP2B, 10 mines of mining concessionaires (KP holders), and 2 mines of KUD. Since 1990s, one BUMN and ten PKP2Bs started coal production. Indonesian coal and called the first generation coal miners. They are producing most of the There are 15 second generation coal miners. Five of which have started the production, four are under development and the remaining six are still conducting feasibility study or exploration. There are 76 PKP2B categorized in the third generation. Eight of them have started the production, two are in their development stage, 14 are still under feasibility study, and the remaining 52 are in exploration. Total of mining concessionaires (KP holders) count 554 including KUDs. Where, 194 mining concessionaires are in production, 63 are under studies, 260 are in exploration, and 37 are in preliminary research. Figure 3.1 shows the coal production in Indonesia by groups from 1993 to The total production has been increased dramatically in last 10 years from 33.0 million tones in 1994 to million tones in 2 NCP states different coal reserves, e.g., billion tons for the total reserve and 7 billion tons for the recoverable reserve

10 2003. In 2003, First generation of PKP2B produced 83.9 million tones and 73.4% of total production. BUMN and Second generation of PKP2B follow it as 10.0 million tones and 9.0 million tones respectively. Kalimantan (East and South) dominates some 90% of total coal production in Indonesia, because nine of ten First generation locate at Kalimantan. In Sumatra, there are the last First generation and the entire state owned corporation. Figure 3.2 shows the coal production by province in ('000 tones) 120, ,000 80,000 60,000 KUD KP Holder State Owned Generation 3 Generation 2 Generation 1 40,000 20, Source: Directorate of Mineral and Coal Enterprises, Indonesia Mineral and Coal Statistics 2004 Figure 3.1 Coal production in Indonesia by groups W. Sumatra:0.1% 8.8% Bengkulu:0.3% 50.5% 40.4% West Sumatra South Sumatra Bengkulu South Kalimantan East Kalimantan Source: Directorate of Mineral and Coal Enterprises, Indonesia Mineral and Coal Statistics 2004 Figure 3.2 Coal productions in Indonesia by province in DOMESTIC DEMAND The main coal demand in the country is of 1) electric power generation, 2) cement industry, 3) other large scale industries (metallurgical, textile, pulp), and 4) small industries (briquette, lime stone incineration). Figure 3.3 shows the domestic coal use by user in 2002 and The total domestic consumption was million tons in 2002 and million tons in The dominant domestic consumption is million tons for the electric power generation and 4.77 million tons for cement industry in

11 The coal demand on the electric power generation is expected to grow rapidly. The contribution against fuel demand in national electricity sector increased from 10% at the end of 1980 s to 24% and 34.8% in 1995 and This is related with the condition that cost of coal generated electricity is the cheapest. (Million tons) 35.0 Domestic Coal Consumption Others Briquette Pulp Industry Metallurgy Cement Industry Coal-Fired Power Plant Notes: Others means could also include coal sold and distributed by coal traders. Source: Directorate of Mineral and Coal Enterprises, Indonesia Mineral and Coal Statistics 2004 Figure 3.3 Indonesian domestic coal consumption 3.4 EXPORT In 1990, China decreased its coal export due to the domestic demand increase, while Indonesia has become the third biggest coal exporter, followed by Australia and South Africa. In fact, the coal export from Indonesia was growing from 4.3 million tons in 1990 to 85.7 million tons in The main destination of the coal export is the Asia-Pacific countries such as Japan, ASEAN, South Korea, Taiwan and Hong Kong. Figure 3.4 shows the coal export destination in

12 3% 4% 14% 20% 19% 7% 8% 10% Total export in 2003: million ton 15% Japan Taiwan Hongkong South Korea India Others in Asia Europe Australia-America Others Source: Directorate of Mineral and Coal Enterprises, Indonesia Mineral and Coal Statistics 2004 Figure 3.4 Coal export by destination country in

13 4. COAL STRATEGY OF INDONESIA 4.1 COAL POLICY As broadly known, Indonesia is producing a lot of coal. In 2003 Indonesia is ranked the third in coal export and ninth in coal production in the world. However, the country s coal reserve is not very huge when compared with other major coal reserving countries, like Russia, China, Australia, etc. Indonesia has 5.9 billion tons of the recoverable reserve, which shares only 0.55% of the global reserve and ranks 16th in the world. The coal business plays an important role in Indonesia, both as the domestic energy resource and as the export commodity. Despite the satisfactory exploitation in the past, positive and definite efforts will be required to sustain and maximize the benefits from the coal business. On 23 June 2004, the Ministry of Energy and Mineral Resources (MEMR) of the Republic of Indonesia issued the Ministerial Decree No. 1128K/40/MEM/2004 regarding the National Coal Policy (NCP). In the decree, MEMR assumes a couple of future coal demands, that is, the domestic demand and export demand. Table 4.1 Coal Demand Prospect by MEMR Year Domestic Demand Export Demand Total Demand Remarks Actual value Source: Attachment 1A, NPC, for Domestic Demand Attachment 3A, NPC, for Export Demand, which is equal to 17% of the world trade in

14 5. COAL MININGS IN KALIMANTAN 5.1 COAL CONCESSIONS IN KALIMANTAN After the first oil crisis in 1973, Indonesia decided to expand the share of coal in mixed energy to get rid of oil-depended situation. In 1981, Indonesia introduced coal concession system named Coal Contract of Work. Since then, Indonesian coal production has dramatically increased from 0.34 million tones in 1981 to million tones in Mining contractors can be classified into three generations by its contract era. The first generation is consisted of 11 contractors. They contracted with PTBA between 1981 and Nine of them are foreign capitals and one of them has already finished its activity. Eight of acting ten first generation contractor is in Kalimantan. There are six acting first generation contractor in East Kalimantan and others are in South Kalimantan. In 1993, 17 contractors called second generation made contract with PTBA. They are all Indonesian domestic company. Five of them recorded the production in 2003 and two are in construction stage. On the other hand, two second generation has terminated their activity and one is in terminated process. There are 12 acting second generation mining contractors in Kalimantan. Between 1997 and 1999, 110 third generation made Coal Contract of Work with Directorate of Coal. But forty of them have terminated or in terminate process and five are suspending their activity. Only four third generation contractors recorded the production in In Kalimantan, there are 51 acting third generation contractors. Table 5.1 shows the status of coal mining contractors in Kalimantan

15 Table 5.1 Coal Mining Contractors in Kalimantan Contractor Province Stage Status Generation Berau Coal, PT East Kalimantan Production Active 1-2 BHP Kendilo Coal Indonesia, PT East Kalimantan Production Active 1-3 Indominco Mandiri, PT East Kalimantan Production Active 1-4 Kaltim Prima Coal, PT East Kalimantan Production Active 1-5 Kideco Jaya Agung, PT East Kalimantan Production Active 1-6 Mulit Harapan Utama, PT East Kalimantan Production Active 1-7 Tanito Harum, PT East Kalimantan Production Active 1-8 Adaro Indonesia, PT South Kalimantan Production Active 1-9 Arutmin Indonesia, PT South Kalimantan Production Active Generation Gunung Bayan Pratamacoal, PT East Kalimantan F/S Active 2-2 Indexim Coalindo, PT East Kalimantan Exploration Suspension 2-3 Kartika Selabumi Mining, PT East Kalimantan Production Active 2-4 Mandiri Inti Perkasa, PT East Kalimantan Construction Active 2-5 Nusa Minera Utama, PT East Kalimantan Exploration Active 2-6 Sinar Benua Prima, PT East Kalimantan Exploration Termination 2-7 Trubaindo Coal Mining, PT East Kalimantan F/S Active 2-8 Antang Gunung Meratus, PT South Kalimantan Production Active 2-9 Bahari Cakrawala Sebuku, PT South Kalimantan Production Active 2-10 Bentala Coal Mining, PT South Kalimantan Production Active 2-11 Borneo Indobara, PT South Kalimantan F/S Active 2-12 Jorong Barutama Greston, PT South Kalimantan Production Active 2-13 Ramdhany Coal Mining, PT South Sumatra Exploration Terminated process 2-14 Marunda Graha Mineral, PT Central Kalimantan Construction Active Generation Anugerah Jatimulya, PT East Kalimantan Exploration Active 3-2 Batubara Selaras Sapta, PT East Kalimantan Exploration Active 3-3 Bumi Laksana Perkasa, PT East Kalimantan Exploration Active 3-4 Bumi Panen Sukses, PT East Kalimantan Exploration Termination 3-5 Bumi Sukses Mandiri, PT East Kalimantan G/S Terminated process 3-6 Dayalapan, PT East Kalimantan G/S Termination 3-7 Delma Mining Corporation, PT East Kalimantan Exploration Active 3-8 Dharma Puspita Mining, PT East Kalimantan Exploration Active 3-9 Firman Ketaun Perkasa,PT East Kalimantan F/S Active 3-10 Insani Bera Perkasa, PT East Kalimantan F/S Active 3-11 Kurnia Sarana Lestari, PT East Kalimantan G/S Active 3-12 Lanna Harita Indonesia, PT East Kalimantan Exploration Suspension 3-13 Mahakam Sumber Jaya, PT East Kalimantan F/S Active 3-14 Perkasa Inakakerta, PT East Kalimantan Construction Active 3-15 Persona Khatulistiwa Nusantara, PT East Kalimantan Exploration Active 3-16 Salamindo Pahara, PT East Kalimantan G/S Active 3-17 Santan Batubara, PT East Kalimantan Exploration Active 3-18 Singlurus Pratama, PT East Kalimantan Exploration Active

16 Contractor Province Stage Status Generation Salamindo Coalindo, PT East Kalimantan G/S Active 3-20 Tambang Damai, PT East Kalimantan F/S Active 3-21 Taraco Mining, PT East Kalimantan Exploration Termination 3-22 Teguh Sinar Abadi, PT East Kalimantan F/S Active 3-23 Tempayang Cemerlang, PT East Kalimantan Exploration Active 3-24 Timah Batubara Utama, PT East Kalimantan Exploration Active 3-25 Wadungmas Tambang Mulia, PT East Kalimantan G/S Termination 3-26 Wirakaneo Coalindo, PT East Kalimantan G/S Termination 3-27 Whiratama Bina Perkasa, PT East Kalimantan G/S Termination 3-28 Bangun Benua Persada, PT South Kalimantan F/S Active 3-29 Bara Pramulya Abadi, PT South Kalimantan Production Active 3-30 Baramarta, PD South Kalimantan Production Active 3-31 Baramulti Sukesessarana, PT South Kalimantan Production Active 3-32 Ekasatya Yanatama, PT South Kalimantan Exploration Active 3-33 Generalindo Prima Coal, PT South Kalimantan Exploration Active 3-34 Interex Sacra Raya, PT South & East Kalimantan F/S Active 3-35 Kadya Caraka Mulia, PT South Kalimantan Exploration Active 3-36 Kalimantan Energi Lestari, PT South Kalimantan Production Active 3-37 Lianganggang Cemerlang, PT South Kalimantan F/S Active 3-38 Mantimin Coal Mining, PT South Kalimantan Construction Active 3-39 Senamas Energindo Mulya, PT South Kalimantan Exploration Active 3-40 Sinarindo Barakarya, PT South Kalimantan G/S Termination 3-41 Sumber Kurnia Buana, PT South Kalimantan Production Active 3-42 Tanjung Alam Jaya, PT South Kalimantan Exploration Active 3-43 Torah Antareja Mining, PT South & Central Kalimantan G/S Termination 3-44 Wahana Baratama Mining, PT South Kalimantan F/S Active 3-45 Asmin Bara Bronang, PT Central Kalimantan Exploration Active 3-46 Asmin Bara Jaan, PT Central Kalimantan Exploration Active 3-47 Asmin Coalindo Tuhup, PT Central Kalimantan Exploration Active 3-48 Batubara Duaribu Abadi, PT Central Kalimantan F/S Active 3-49 Bharinto Ekatama, PT Central&East Kalimantan F/S Active 3-50 Buntok Perdana Coal Mining, PT Central & South Kalimantan Exploration Termination 3-51 Dhamar Tejokencono, PT Central & East Kalimantan G/S Termination 3-52 Juloi Coal, PT Central Kalimantan Exploration Active 3-53 Kalteng Coal, PT Central Kalimantan Exploration Active 3-54 Lahai Coal, PT Central & East Kalimantan Exploration Active 3-55 Maruwai Coal, PT Central & East Kalimantan Exploration Suspension 3-56 Multi Tambang Jaya Utama, PT Central Kalimantan Exploration Active 3-57 Pari Coal, PT Central & East Kalimantan Exploration Suspension 3-58 Ratah Coal, PT Central & East Kalimantan G/S Suspension 3-59 Sumber Barito Coal, PT Central Kalimantan Exploration Active 3-60 Suprabari Mapanindo Mineral, PT Central Kalimantan Exploration Active 3-61 Yamabhumi Palaka, PT West Kalimantan F/S Active Source: Directorate of Mineral and Coal Enterprises, Indonesia Mineral and Coal Statistics

17 5.2 COAL PRODUCTION AND ITS TRANSPORTATION In 2003, million tones coal or 90.8% of Indonesian national production were produced in Kalimantan. Of these million tones, million tones or 80.8% were produced by 1 st generation contractors. Figure 5.1 shows the transition of coal production in Kalimantan by mining groups from 1993 to ('000 ton) 120, ,000 80,000 60,000 40,000 20,000 KUD KP Holder Generation 3 Generation 2 Generation Source: Directorate of Mineral and Coal Enterprises, Indonesia Mineral and Coal Statistics 2004 Figure 5.1 Coal production in Kalimantan by mining groups In Kalimantan, track, barge and conveyor belt are used to transport coal from mining site to river, coal terminal and coal freighter. Most of working coal mine locates near the coastline or large river for easy coal transportation. They transport the coal from mining site to barge transshipment port along the river or directly to the coal terminal along the coastline by track or conveyor belt. From the barge transshipment port to coal terminal port or coal freighter, coal is transported by barge. In Mahakam river, one of the main river for barge coal transportation in Kalimantan, there are some bottlenecks that restrict barge transport capacity, one is two road bridges at Samalinda and Tenggarong and the other is the channel at Mahakam delta. The span of Samarinda bridge is 40m only so that the barge size using Mahakam river is limited to 8,000 dwt only. Passage time under the bridge is also limited from 6:00 am to 18:00 only to avoid the accident of barge. Mahakam river has much accretion sand therefore the channel requires 1.3 million cubic meters dredging work every year to keep the enough depth for barge transportation. There are five coal terminals in Kalimantan, two are public terminal and other three are particular contractor s private terminal. Some contractors use these terminals to transship coal from barge to coal freighter ship but others transship its production from barge to coal freighter on the sea

18 Photo 5.1 Coal transshipment to barge at Mahakam river Photo 5.2 Coal transportation by barge at Mahakam river

19 Photo 5.3 Road bridge at Samarinda Photo 5.4 Road bridge at Tenggarong

20 Photo 5.5 Unloading of coal from barge at Barikpapan coal terminal Photo 5.6 Transshipment of coal at Barikpapan coal terminal

21 5.3 COAL FLOW Totally 25 Kalimantan coal mining contractors sold million tones coal in Of these million tones, 83.1 million tones or 78.5% were exported and rest 22.8 million tones or 21.5 % were sold for Indonesian domestic use. Figure 5.2 shows the transition of coal sales of Kalimantan mining contractors. From 1994 to 2003, export coal sales have increased about 350%, and domestic sales recorded 770% growth. ('000 ton) 120, ,000 Domestic Sales Export 80,000 60,000 40,000 20, Source: Directorate of Mineral and Coal Enterprises, Indonesia Mineral and Coal Statistics 2004 Figure 5.2 Coal sales of Kalimantan mining contractors 5.4 PAST DISCUSSIONS ON COAL TRANSPORT IN KALIMANTAN There are many past studies related to the coal business in the country. They are, for example, JICA (Japan) study in 1997, Monenco (Canada) in 1998, the IEEJ (Japan) studies in 2001 and 2002, FIKTM ITB (Indonesia) study in 2001, Yayasan Lentera (Indonesia) study in 2002, and NEDO (Japan) study in The latest study, NEDO study in 2003, focused on the coal transport within Kalimantan and reached the straightforward conclusion. That is; It is the most beneficial if a railway transport option is added to the present transport infrastructure, together with expansion of the existing coal terminals and development of new coal terminals. More importantly, however, the NEDO study points out the possibility of lack of domestic demand in around

22 6. COAL TRANSPORTATION 6.1 PRESENT STATE OF COAL TRANSPORTATION IN KALIMANTAN The inland coal transportation in Kalimantan is conducted by truck, barge and belt conveyer and the existing transportation systems are; Type 1. Type 2. Type 3. Type 4. Mine site truck riverside coal terminal barge offshore loading to coal vessels Mine site truck riverside coal terminal barge coal terminal port loading to vessels Mine site truck coal terminal port loading to vessels Mine site belt conveyer system coal terminal port loading to coal vessels. (1) Type 1; The transportation by barges and offshore transshipment without usage of port is most popular in East Kalimantan. The coal is transshipped from a barge to a coal vessel at a loading point provided offshore. This offshore transshipment to coal vessels has poor loading capacity because coal is loaded using the coal vessel s own loading gear. And the coal vessels without such gear and over Panamax Size vessels are not accepted. Some mines have or employ floating cranes. The Codes of International Dangerous Matters of the International Marine Organization categorizes the coal falls in Fourth-Class Dangerous Matters. Therefore, in future there is the possibility that offshore loading will be banned and the loading work must be done at a terminal or a berth designed for that purpose. The transshipping capacity is as shown follows; Table 6-1 Transshipping capacity 20,000dwt Handy Panamax Cape Kideco - 10,500 18,000 30,000 Multi Harapan 4,000 5,000 7,500 10,000 - Baiduri 4,500 8,000 10,000 - Berau - 16,000 20,000 24,000 Source: Preliminary Feasibility Study on Railway Coal Transportation in Kalimantan, Indonesia; NEDO (2) Type 2, Type 3 and Type4; There are five coal terminals in Kalimantan, three of them are private, Tanjung Bara Coal Terminal (TBCT) of KPC, Bontang Coal Terminal (BCT) of Indominco, and North Pulau Laut Coal Terminal (NPLCT) of Arutmin, and other two are public, Balikpapan Coal Terminal (BPCT) and Indonesian Bulk Terminal (IBT). BPCT, TBCT and BCT are in East Kalimantan and IBT and NPLCT are located in South Kalimantan. The public coal terminals, BPCT is used by only two users, Gunung Bayan and Kideco mines, and IBT is used only by Adaro

23 The mines of KPC and Indominco are located near the coastline, KPC transports the coal to the terminal by belt conveyer system and Indominco transports the coal by truck. 6.2 COAL TERMINAL Balikpapan Coal Terminal (BPCT) BPCT is located Teluk Betung of Kariangau area, north part of Balikpapan municipality, the inner part of BAlikpapan bay, and operated by PT.Dermaga Perkasapratama as public coal terminal. The dimension of BPCT is as shown below; Item Location Handling capacity (year) Unloading facility from barge Berth Capacity Acceptable size of barge Coal stock facility Capacity of coal stock Capacity of carry in Capacity of carry out Loading facility Table 6-2 Explanation Dimension of BPCT Inner part of Balikpapan bay, at Teluk Betung of Kariangau. At lat. 01degree12 S., 116degree47 E. 5.0 million ton/year 1 berth 760 ton/h x 2 (max), 420 ton/h x 2 (average) 2,000 ~ 10,000 dwt 520 thousand ton (65 thousand ton x 4 piles x 2 yards) 1,520 ton/h (tripper system, 1 tripper/yard) 2,800 ton/h (hopper system, 4 hoppers/yard) Berth 1 berth (depth -15m, 235m length), length between mooring dolphins 276.5m Loader Out-reach Capacity Acceptable vessel Minimum Maximum L.O.A Beam Draft Deadweight 43 m (max throw of coal from fender) 2,800 ton/h x 1 (max), 2,200 ton/h x 1 (average) 15,000 dwt Panamax size 250m 40m 14m 90,000 dwt Channel Depth -13m, length 14km, width 150m Source: Preliminary Feasibility Study on Railway Coal Transportation in Kalimantan, Indonesia; NEDO The user of BPCT is Gunung Bayan and Kideco mines at present. PT.DP has the plan of extension of coal terminal to the capacity 10 million ton/year to accept more barges from the mines at Mahakam river basin and the area for coal stock yard is already acquired

24 The required time of loading to Panamax size vessel is about 30 hours, the necessary time is about 1/5 ~ 1/7 of offshore transshipment. According to the Daw Jones News on December 1, 2004, PT. Dermaga Perkasapratama who operates BPCT made a floating terminal charter contract with Singapore company ASL Marine Holdings Ltd. This floating terminal pontoon will be used by PT. Dermaga Perkasapratama for the unloading of from the barges, storage of coal, and subsequent loading of coal on to ocean-going coal vessels near the Balikpapan Coal Terminal. The charter contract amount is US$50 million for a period of 10 years. The shipbuilding cost of a 65,000 dwt floating terminal is estimated US$32.8 million Indonesia Bulk Terminal (IBT) IBT is located at the southern end of Plau Laut Island and the construction of 1 st stage was completed at July 1997 with the capacity of 10 million ton/year. IBT is targeted to the public coal terminal for the coal mine in South Kalimantan. Laut island is separated by Laut strait of 5km width from Kalimantan island. The user of IBT is only Adaro mine at present. 6.3 TRANSPORTATION OF COAL FROM MINE TO COAL TERMINAL Existing mines are located near the coastline or riversides where the coal can be transported easily by ocean vessels or barges. However, those mines in future newly developed mines will be located in the hinterland than the existing mines, in areas where barges cannot be used, therefore, the new mines will need new coal transportation systems. Second- and Third-generation contractors are expected to become the principal developers of new mines, but many of them are afraid that their production will be delayed owing to short investment funds especially when they need to invest all the coal transportation method. To promote the development of coal mine, it is necessary to prepare the coal transportation method including the coal terminal which can be used publicly by any new mines. The transportation and loading cost by mode are estimated as follows. Table 6-3 Transportation cost Method Truck 0.07 Cost (US$/ton-km) Barge Railway Belt conveyer Source: Preliminary Feasibility Study on Railway Coal Transportation in Kalimantan, Indonesia; NEDO

25 Table 6-4 Loading cost Method Barge Railway Transshipment 1.80 Cost (US$/t) Coal terminal 2.25 Source: Preliminary Feasibility Study on Railway Coal Transportation in Kalimantan, Indonesia; NEDO According to the Report of Preliminary Feasibility Study on Railway Coal Transportation in Kalimantan, Indonesia studied by the Institute of Energy Economics, Japan, the transportation of coal by train and coal terminal will be cheapest for the coal mines which will be developed. The construction of railway from coal mine at the hinterland of Mahakam River to the coal terminal at Balikpapan and extension of BPCT is recommendable. 6.4 Railway construction plan Specification of railway The railway should be specialized to transport of coal. The population of East Kalimantan is 3 million persons, the populations of Samarinda and Balikpapan are about 500 thousand persons and the area between Samarinda and Balikpapan is the sparsely populated area, therefore, the passenger transportation is not suitable for railway transportation. The main purpose of construction of railway in Kalimantan is coal transportation and the other freight and passenger transportation are additional transportation, the study of railway system shall be done only for coal transportation. (1) Gauge of track: Standard gauge The gauge of railway in Java and South Sumatra is 1,067mm same as Japan. The railway in Kalimantan will be constructed and operated independently from existing railway of PT.KA, therefore, it will not be required to adopt the same system of PT.KA. The purpose of the railway in Kalimantan is transportation of coal, the suitable railway system to transport the coal is heavy duty railway. The suitable railway norm of railway in Kalimantan shall be standard gauge with heavier than 25 ton of axel load. The study report of PT.Gelar Sarana Trekka proposes the standard gauge and 27.5 ton of axle load for locomotive. The relationship between axle load and wagon capacity is as shown below

26 Table 6-5 Transportation volume by axle load Axle load Total weight body load load per train (ton) Transport volume per day (ton) Transport volume per year (ton) ton ton ton ton 50 wagons 9 trains per day 330days per year ,600 23,400 7,722, ,750 24,750 8,167, ,500 31,500 10,395,000 In this study, it is proposed to adopt the axle load of 25 ton, which makes it possible to transport more than 10 million tons coal per year with 9 trains operation per day. The Study Report of PT.Gelar Sarana Trekka proposed to use the wagon with total load 90ton and pay load 70ton. The line capacity related to the interval of stations and train operation speed is shown in Table 6-6. Table 6-6 Line capacity by station interval and train speed Distance Line capacity (Train speed Km/h) Interval of station Km Number of train par day The line capacity for the distance of 2 stations at 15km and train speed 30km/h is 26 trains (round trip) per day. It is possible to operate 10 trains (one way) per day to realize the coal transportation of 10 million ton per year by single track. The double track railway is not necessary to transport 10 million tons of coal per year

27 (2) Construction gauge Indonesia consultant, PT.Gelar Sarana Trekka, studied the construction gauge based on the DB (Germany Railway) construction gauge. The construction gauges of DB, UIC and USA are shown below. Fig. 6-1 Construction gauge of DB (German Railway) Fig. 6-2 Medium and low-speed train construction gauge of UIC

28 Fig.6-3 Construction gauge of USA All of these 3 construction gauge are similar and there will be no problem to adopt the construction gauge studied by PT.Gelar Sarana Trekka. (3) Radius of curve and gradient Lager radius and gentler gradient shall be adopted for heavy load train to economize the operation and to avoid the derailment of wagons. The study report of PT.Gelar Sarana Trekka proposed 1200m for minimum radius and 5 per mil. For steepest gradient, these propose is suitable. (4) Signal Automatic signal system with electronic interlocking system shall be adopted and Centralized Traffic Control system will be useful for efficient train control. (5) Telecommunication The exclusive telecommunication line by optical fiver will be suitable for Kalimantan railway. (6) Alternative signal and telecommunication system. It is necessary to study new train control system using GPS (Geographical Positioning System) and satellite communication system to minimize the construction cost. (7) Rolling stock: Diesel locomotive is suitable as the traction system for this railway. High speed of train operation is not required for coal transportation trains, the average train speed can be 30km/h and maximum train speed is lower than 80km/h. At the length of 160km railway, the train operation time with 30km/h average speed is less than 6 hours (one way). Loading and unloading capacity at mine and coal terminal is estimated 2,000 ton/h, with this assumption, loading and unloading times are 2.25 hours respectively. The cycle time of train operation is estimated as follows,

29 Table 6-7 Train operation cycle time Item Time (hour) 1. waiting time for loading: loading at mine: waiting at station: running time on line: waiting time for unloading: unloading at coal terminal: waiting time at station: total cycle time: 14.5 The cycle time of one train is about 14.5 hours, and one train can operate 1.6 time operation per day. The composition of train is 2 locomotives, 50 coal wagons and 1 caboose. The required number of rolling stock is shown in Table Route Table 6-8 Item Number of rolling stocks necessary for coal transportation Required number for operation Reserve (20%) Total Locomotive Wagon Caboose Indonesian Government has some technical reports for railway construction in Kalimantan and Indonesian consultants propose some railway routes between Samarinda and Balikpapan. (1) Railway route sown in the Report of Rayakonsult PT. The railway traffic demand is enough studied in this report but the railway route is not well studied and only the idea of route is proposed. The railway route is as shown in Fig.6-4,

30 Fig. 6-4 Railway rout studied by Rayakonsult (2) Railway route proposed by PT.Gelar Sarana Trekka This report proposed the technical mater of railway including the route and technical standards. The proposed railway route is coast line route to avoid the geographical undulation to reduce the construction cost of railway structures. The proposed route is as shown in Fig

31 Fig. 6-5 Railway route proposed by PT.Gelar Sarana Trekka

32 The location and distance between 2 stations are shown as follow. Table 6-9 Location of stations between Balikpapan and Samarinda Station Location (km) Distance(km) Town Station 1 0 Balikpapan Station Station Station Station Station Station Station Station Station Station Station Samarinda The interval of stations, shortest is 5.737km and longest is km, but other intervals as between 8.375km and km and it does not vary widely, this condition may be easy to operate the trains on single track line. (3) Alternative route The necessary railway for coal transportation is from mine to coal terminal, the railway line from Samarinda to coal mine area is not studied by Indonesian Consultant, however, the railway should be constructed to Kotabangun about 70km north-west of Samarinada for coal transportation. The Fig.6-6 shows the railway line from Balikpapan to Kotabangun via Samarinda, the total length of railway is about 170km. From Balikpapan to Samarinda, two routes are shown in Fig.6-6, one is studied by PT.Gelar Sarana Trekka and one is short cut route as alternative. Shortest line (straight line) between Samalinda and Balikpapan will be nearly 20km shorter than other coast line but the construction cost will be higher than coast line. However, the operation cost will be

33 lower than longer line, therefore, it is necessary to study this shortcut line from the view point of project life cycle cost. For the construction cost, the coast line is lower cost per unit length and the shortcut route is higher because the undulation of route is larger than coast line and the working volume of cutting and filling is larger than coast line but the railway line length is shorter then the total construction cost may be not so different between two routs. The total length of railway line is estimated as 170km for the coast line and 150km for shortcut line. The stations should be constructed every 10km and coal terminal stations should be at Balikpapan and Kotabangun. The number of stations is two terminals and 16 stations for train passing. Fig.6-6 Alternative railway route Construction cost The construction cost, train operation and operation cost are studied with 170km railway line. (1) Civil work The construction cost between Balikpapan and Samarinda, 113km538.9m, estimated by PT.Gelar Sarana Trekka is as shown below

34 Table 6-10 Construction cost between Balikpapan and Samarinda Item Cost (1000 Rp.) 1 Preparation work 1,399,500 2 Land acquisition 250,269,580 3 Land work 252,561,980 4 Drainage work 62,356,740 5 Sub ballast 5,612,107 6 Box culvert 8,140,000 7 Bridge and level crossing 11,000,000 8 Track work with ballast 258,178,080 9 Load and unloading at siding 275, Signal and telecommunication 102,958, Work shop 3,465, Sub depot 3,465, Fuelling depot 3,465, Railway station 23,430, Topographic survey 6,256, Geotechnical investigation 1,650, Engineering and project management 27,500,000 Total 1,021,982,727 Total construction cost of km is 1,021,983million Rp., i.e. 12,774 million Japanese yen, 9,001 million Rp./km and million Yen/km. This cost includes civil work cost only. The construction cost for 170km is estimated at 1,530,199 million Rp. (19,127million Yen) (2) Signal and telecommunication The terminal station for Balikpapan is consists of 8 lines and 6 lines for Kotabangun terminal station and 2 lines for other 16 stations. The signal system with electric interlocking system will be adopted and optical fiver telecommunication line will be installed 170km along the railway line. The construction cost of signal and telecommunication system is as follows; Table 6-11 Construction cost of signal and telecommunication Item Unit Unit price (1000Rp.) Amount(million Rp.) (million Yen) Balikpapan Terminal type A 41,664,000 41, Kotabangun Terminal type B 37,200,000 37, Stations 16 17,112, , ,422 CTC 1 14,840,000 14, Cable 170km 108,000 18, Total Rp. 385,856.0 Yen 4,

35 (3) Rolling stock Number of rolling stock required for operation and estimated procurement cost are as follows, Table 6-12 Procurement cost of rolling stocks Item Required number for operation Reserve (20%) Total number Unit cost (1000Yen) Amount (million yen) Locomotive ,000 6,000 Wagon ,000 3,600 Caboose , Total 9,632 (4) Summarized Construction cost The summarized construction cost of 170km railway between Balikpapan and Kotabangun via Samarinda is estimated as follows, Table 6-13 Overall Construction cost Item Amount (million Rp.) Amount (million Yen) Civil work 1,530,199 19,127 Signal and telecommunication 385,856 4,823 Rolling stock 770,560 9,632 Total 2,686,615 33,

36 6.3.4 Operation Cost The maintenance and operation cost of South Sumatra Railway of TP.KA in 2003 is as shown below. Table 6-14 Maintenance and operation cost of South Sumatra Railway in 2003 Item Amount 1 Direct Operation Cost 198,914,329 a. Train Costs 198,914,329 1 Fuel 73,422,919 2 Employees 31,851,773 3 Rolling Stock Maintenance 71,412,294 4 Rolling Stock Depreciation & Ins. 22,227,343 2 Indirect Operation Cost 70,816,098 a. Main Infrastructure Maintenance 28,586,311 b. Other Infrastructure Maintenance 573,786 c. Employees 28,225,373 d. Infra Depreciation & Ins. 862,393 e. Accident 3,252,058 f. Station / Yard 9,316, General Cost 60,708,947 a. Employees 20,969,794 b. Others 39,739,153 Total 330,439,374 The operation length of South Sumatra Railway is 638km and the operation cost per km is 518 million Rp./km/year (6,474 thousand Yen). Take into the consideration of the various conditions of South Sumatra Railway, such as, lack of maintenance, operation of longer distance of coal transportation, operation of passenger train and other various cargos, the maintenance and operation cost per km for the railway in Kalimantan is estimated 500 million Rp. per year. The maintenance and operation cost of 170km railway is estimated 85,000 million Rp. per year (1,063 million Yen) Organization of railway operation The organization of railway operation should be private organization which will be organized by the companies related to the coal mine, coal user, coal exporter and railway company. The operation of this railway is simple compare to the railway in Java Island because the line is one line and they transport the coal from coal mine to coal terminal. A new established organization will be able to operate the railway with appropriate training of staff and some managerial advise by railway specialist

37 6.5 Coal terminal extension plan It is informed that the extension plan of Balikpapan Coal terminal is prepared and land area has already acquired. The construction cost of extension of coal terminal is estimated roughly 3 billion Yen

38 7. PRELIMINARY PROJECT JUSTIFICATION AND BUSINESS SCHEME 7.1 PRELIMINARY ECONOMIC EVALUATION OF PPP BASED PROGRAM General The objective of the economic evaluation is to assess the economic feasibility of the PPP based Program, which is composed of the Public Sub-program and Private Sub-program. Both sets of the cost and benefit discussed in this chapter are respective sums in the Public and Private Sub-programs, unless otherwise specifically noted. For the economic evaluation, two measures of project worth, namely, the net present value (NPV) and the economic internal rate of return (EIRR), are examined. In addition, a sensitivity analysis is made to evaluate the economic viability of the Program against possible changes in the project costs and benefits. The economic evaluation is made based on the following assumptions: (1) (2) (3) (4) The useful life of the Program is 30 years from the implementation. For the calculation of EIRR, only direct economic benefits are counted, and any indirect and intangible benefits are not taken into account. Constant prices at 2009 level are used in this economic evaluation. The economic conversion factors given in Table 7.2 are used to convert the financial costs to economic values Economic Cost The Economic Cost here is composed of the construction cost, physical contingencies, and operation and maintenance cost (O&M cost), all in terms of the economic value. The economic cost is obtained from the corresponding financial value and an economic conversion factor. The construction cost is straight forward. It is the economic cost required for construction of the Program. The physical contingencies are monetary values of additional real resources that may be required beyond the construction cost to complete the Program facilities. The O&M cost consists of the costs of operation, maintenance, and repair of the civil structures, such as the track structures of the railways and the mooring facilities of the coal ports, and the non-civil facilities, such as the rolling stocks of the railways and the cargo sorting facilities of the coal ports. The economic costs here do not include the working capital, depreciation, price contingencies, taxes and other transfer payments from the financial charges. Since the rail track is assumed to keep remained as the public assets, the land acquisition cost is not counted in this economic evaluation. The construction cost and physical contingencies are given in Table

39 Table 7.1 Economic Construction Cost and Physical Contingencies Description Construction Cost (US$ million) Notes 1. Railway track and control systems Public sub-program 2. Coal port 21.3 Public sub-program 3. Stock yard 4.3 Private sub-program 4. Freight cars 78.0 Private sub-program 5. Loading station 8.5 Private sub-program 6. Physical contingencies 30.6 Total Economic Cost Table 7.2 Economic Conversion Factors and Financial Costs Description Financial Cost (US$ million) Conversion Factors 1. Railway track and control systems Coal port Stock yard Freight cars (Rolling stocks) Loading station Physical contingency Financial Base Cost The O&M costs assumed in this chapter are given in Table 7.3, which includes the internal O&M costs and external O&M costs. Here, the internal O&M costs are related to the Program facilities, like railway track and loading stations, and assumed constant throughout the operational years. While, the external O&M costs, like On-site excavation cost and freight, are the costs beyond the Program but counted as part of the economic costs in order to fairly evaluate the economic viability. The external O&M costs are assumed proportional to the volume of coal transport under the Program. Table 7.3 Economic O&M Costs Description O&M Cost (US$ million/year) Domestic Export 1. Railway track and control systems 2.2 US$million/year 2.2 US$million/year 2. Coal port 0.2 US$million/year 0.2 US$million/year 3. Stock yard 3.0 US$million/year 3.0 US$million/year 4. Freight cars (Rolling stocks) 6.5 US$million/year 6.5 US$million/year 5. Loading station 3.0 US$million/year 3.0 US$million/year 6. External costs 8.2 US$/ton 8.2 US$/ton On-site excavation cost 5.0 US$/ton 5.0 US$/ton Freight 3.2 US$/ton 3.2 US$/ton Note that the Depletion Premium is a possible economic cost exploiting the coal resources. Because the coal resources cannot be replenished, and coal must be replaced by imports or domestic substitutes when depleted, the opportunity cost of the coal resource includes the cost of the substitutes when the coal resource is exhausted. However, the depletion premium is inversely related to the size of the reserves. Since more than 100 years of reserves remain in East Kalimantan, the depletion premium would be close

40 to zero in the case of the Program. In this paper, the depletion premium is assumed negligible small and not numerically counted in the economic costs Economic Benefit The economic benefit, which is the sum of the benefits expected from both of the Public Sub-program and Private Sub-program, is assumed to be the net increase of the coal production in East Kalimantan. Besides, there are indirect benefits such as the employment and economic development opportunities, deterrent to environmental destruction, taxation to SPCs and community contribution from SPCs. These indirect benefits are not counted in the economic evaluation of the Program. (1) Benefits of Coal Transport (a) Economic prices of coal In order to evaluate the expected program benefits, economic prices of export coal and non-export coal are examined. The economic prices of export coal are estimated on the basis of the economic parity border prices calculated from the projected world market prices of coal in the long-term range for the period from 2010 to The economic prices of non-export coal are valued by applying the conversion factors to their financial prices at the current market. Table 7.4 summarizes projection of the economic coal prices for both export and domestic use. details on the projection are given in Appendix 2 hereto. Further Table 7.4 Estimated Economic Coal Prices (a) For Export Year Economic Price Notes US$/ton US$/ton Base year 2011 to 2039 Prices are reduced by 0.8% p.a. Source: Estimate of the Study Team 6,200 kcal/ton FOB (b) For Non-Export Year Economic Price Notes US$/ton US$/ton Base year 2011 to 2039 Prices are reduced by 0.8% p.a. Source: Estimate of the Study Team 5,200 kcal/ton FOB (b) Net increase of coal production The net increase of coal production will accrue primarily increased mining sites. The net increase of coal production is defined as the difference of the coal production between a) the without-the-program condition and b) the with-the-program condition. The coal production in East Kalimantan in 2003 is reportedly 60 million tons, all of which are now transported by barge under the without-the-program condition. It is targeted to increase over 170 million tons in 2020 under the with-the-program condition. To realize such large increase, one can hardly expect any decrease of the barge transport. This is simply because the coal transport in East

41 Kalimantan has only two choices; barge and coal rail. Therefore, it is quite reasonable to assume that the net increase of the coal production under the Program equals the freight capacity of the coal rail. In other words, one can introduce full freight in normal years for each rolling stock of the coal rail. Applying the coal production increase rate for the entire East Kalimantan discussed in Appendix 2, the net increase of coal production in East Kalimantan is assumed as illustrated in Figure Million ton Export Non-Export Total Year Figure 7.1 Assumption of Net Increase of Coal Production in East Kalimantan (c) Benefits from net increase of coal production Applying the economic coal prices discussed earlier, the economic benefit from the coal production increase is calculated, as shown in Table 7.5. The annual benefits of the Program are estimated to be US$ 84.7 million with 10% of the discount rate

42 Table 7.5 Expected Economic Benefit under the Program Coal Transport Unit Benefit Year (Mt) (US$/ton) Benefit (US$ million) Export Domestic Export Domestic Export Domestic Total Total , , ,733.2 NPV , , ,540.6 (2) Other Indirect Benefits (a) Employment and economic development opportunities Construction and operation of the railways and coal ports will give vast opportunities to professionals and local laborers to obtain employment. The recruited manpower will reinvigorate local economies through their housing and daily needs. Another major benefit of the Program is the increase in economic opportunity, increased employment in transportation and service industries

43 (b) Benefit to Regional Community It is assumed that 1% of sales revenue is to be transferred to the regional community every year. The regional community will gain US$35 million in total for all over 30 years. With 10% of the discount rate, its contribution is computed to be US$10 million in a present value. Note that all of the social impact when the Program is implemented, including household resettlement, will be compensated by the public sector and be neutralized before the commissioning. In this report, such social impact related to the project development is not counted in the public benefit discussions. (c) Corporate Income Tax The corporate income tax to be paid by SPCs during the commercial operation years is also counted as public benefit. In the base case discussed later, total amount of the corporate income tax to be paid by SPCs would be as large as US$402 million and its present worth is US$114 million with 10% of the discount rate for 30 years of the operational years from Assumptions of the corporate income tax are given later in Sub-section (2) (i) Economic Evaluation (1) NPV and EIRR The NPV and EIRR are calculated based on the aforementioned economic costs and benefits. The cost and benefit flow of the Program, which is composed of the Public Sub-program and Private Sub-program, during the useful life is given in Table The three measures for the Program are: NPV = EIRR: 26.5% NPV = EIRR: 15.1% US$401.9 million These results indicate that the investment on the Program can expect sufficient economic returns. (2) Sensitivity The sensitivity analysis demonstrates the consequences of major changes in the values of costs and benefits parameters on the economic viability of the Program. The results of the sensitivity analysis showed that the Program remained economically viable under a combination of stringent sensitivity tests. If, for example, it is assumed that the capital cost is 10% greater than the base case and economic prices of coal is 10% less than the same, the economic viability of the Program is sustained, as summarized below. US$ million

44 Table 7.6 Economic IRR Year Coal Transport Coal Price Costs (US$ million) Benefit (US$ million) (Mt) (US$/ton) Net Benefit Capital O&M Others Total Export Domestic Export Domestic Export Domestic Total Total , , , , , ,390.3 NPV , , , , , Discount rate = 10% p.a. EIRR = 26.5% 7.2 LIKELY ORGANIZATION AND BUSINESS SCHEME General This chapter discusses a likely organization and business scheme that are required to achieve the Program Likely Organization The East Kalimantan Coal Transport Program is a Public-Private-Partnership (PPP) based program, which is composed of several projects. The Program is of multi sectors and expected to have two major projects in view of sector, the Railway Project and the Coal Terminal Project, as illustrated in Figure

45 East Kalimantan Coal Transport Program Coal Terminal Project Railway Project Private entities Public entities Private entities Public entities Figure 7.7 Likely Program Composition by Project The Program components may be expressed by their entities, as shown in Figure 7.8. Here, the rail track and coal port entities are assumed to be public owned companies. While, the loading station, freight cars (rolling stocks), coal stock yard entities, and unloading station are assumed to be private companies or SPCs. The private companies may be based on a build -own-operate (BOO) business scheme. East Kalimantan Coal Transport Program Public Sub-program Private Sub-program Railway Track Coal Port Stock Yard Unloading Station Freight Cars Loading Station Figure 7.8 Likely Program Composition by Sector Each tangible asset under the Program may be compared with the expected coal flow as illustrated in Figure 7.9. East Kalimantan Coal Transport Program Coal Terminal Project Railway Project Coal Buyer Coal Buyer Coal Buyer Coal Buyer Coal Port Coal Stock Yard Unloading Station Freight Cars (Rolling Stocks) Rail Track Loading Station Coal Producer Coal Producer Coal Producer Coal Producer Public asset Private asset Figure 7.9 Likely Project Assets by Owner and Coal Flow Likely Financing Scheme (1) Financing Scheme The Program cost is estimated to be US$ 396 million excluding the financial charges and insurance premium. Out of which US$ 278 million is assumed to correspond to the Public Sub-program and the remaining US$ 118 million is to the Private Sub-program. Thirty percent of the Private Sub-program is assumed to be covered by equity investment by the investors, and the remaining seventy percent is by loans

46 The Public Sub-program will need to be implemented by the Indonesian public sectors, hopefully with soft loans from the bi- or multilateral financing agencies, like JBIC and ADB. For the equity portion of the Private Sub-program, major part is expected to be invested by one of experienced foreign companies who have strong financial background. The remainder of the same is needed to be invested by co-investors either from abroad or Indonesia. Hopefully, the co-investors should have respective specialties related to the transportation project s implementation and/or operation, such as railway/port design, project management, and O&M thereof. Major part of the equity investment provided by foreign investors will be insured against the country risks. For the loan portion of the Private Sub-program, a syndicate loan built by multilateral banks, bilateral banks, and commercial banks will be demanded. It is highly desired that ADB and World Bank Group joins such syndicate. The loans from the multilateral banks and commercial banks will demand country risk guarantees for security. Note that a single bi- or multilateral financing agency cannot offer both of soft loan and export credit at the same time for a single project. Figure 7.10 gives an example of the financing scheme. An exact scheme should be built up with the main investor s initiative. Indonesia US$42M Public US$278M JBIC US$237M Program US$396M Equity US$35M Main Investor Co-Investors MIGA's Country Risk Guarantee Local Investors Private US$118M ADB Debt US$82M JCBs IFC NEXI's Country Risk Guarantee ICBs Figure 7.10 Example of Financing Scheme (2) Financial Charges When one assumes the loan and insurance conditions as discussed later in Table 7.9, the major financial costs are computed as follows: Interest during construction (IDC) Front-end-fees Commitment fees Insurance premium Total financial cost US$14.2 million US$1.5 million US$1.0 million US$6.8 million US$23.6 million Here, the total Program Cost including the financial charge is computed to be US$419.6 million

47 (3) Repayment Schedule An example of the repayment of the loans is given in Table 7.7. Table 7.7 Example of Repayment Schedule Unit: US$ million Year Total JBIC IFA ICB LCB Total PV (10%) Notes JBIC: Japan Bank of International Cooperation IFA: International funding agencies ICB: International commercial banks LCB: Indonesian commercial banks

48 7.3 PRELIMINARY FINANCIAL EVALUATION General This chapter discusses the financial viability of the entire Program, which is composed of the Public Sub-program and Private Sub-program. The financial evaluation is made based on the following assumptions: (5) (6) The useful life of the Program is 30 years from the implementation. Constant prices at 2009 level are used in this financial evaluation Financial Cost The following table is a set of assumptions for the financial costs Financial Benefit Table 7.8 Financial Costs 1. Implementation Cost w/o financial charges $M Year 0 0% 0.0 $M Year 1 10% 39.6 $M Year 2 25% 99.0 $M Year 3 30% $M Year 4 25% 99.0 $M Year 5 10% 39.6 $M 2. Financial Charges 23.6 $M Interest during construction 14.2 $M Front-end fees 1.5 $M Commitment fees 1.0 $M Insurance premium 23.6 $M 3. O&M Cost Rail $/t Terminal $/t Total $/t 4. Community Contribution 1.0% of sales The financial benefit is the set of service charge for the coal transportation from the east end of the rail and the coal port, inclusive. Transfer payments from the private sector to the public sectors, if any, are considered as the financial benefit, because such transfer payments are cancelled out by the corresponding revenues Financial Evaluation (1) Financial Indicators and Analysis Cases The evaluation indicator or efficiency of investment is measured in the following sub-sections by using internal rates of return (IRR). The indicator IRR is the rate of discount which equates the present values of the cost and benefits streams over the operation period. The financial evaluation generates two types of IRR. They are FIRR (Financial IRR) and ROI (Return on Investment). In this sub-section, we discuss mainly the base case, the most likely financial model coming from typical expectation with most realistic costs and risks. In addition to the base case, some variations will also be examined for sensitivity purposes

49 (2) Basic Assumptions for Financial Analysis The financial analysis is carried out in constant 2009 price terms to determine IRRs. The analysis for the base case scenario is based on the following assumptions. (a) Capacity of coal transport The transport capacity is constant at 10 million tons per year. (b) Currency Most of the investment and part of the project facilities are of foreign currency. Therefore a unitary currency of US$ (Dollar of the United State of America) is used in the analysis. (c) Base cost and disbursement schedule The Base Cost of the Program is estimated to be US$ 396 million, which is the required cost to implement the project excluding the initial working capital and financial charges. The annual disbursement is scheduled in Table 7.8. Construction work is assumed to start in 2007 with field design and preparatory work and to be completed in 2009 with an implementation period of three years. Commercial operation is expected to start in January 2010 with 30 years of the operation period. (d) Financial charges - Loan conditions The cost of the Program includes the base cost, interest during construction (IDC) and financial charges (front-end fee and commitment fee). The financing plan assumed is based on the most likely sub-project scheme as shown in Figure Note that amounts of the loan in the figure are tentative and may be subject to future discussions among the Indonesian Central Government, the regional governments, and private investors. Funding arrangement during construction is assumed as tabulated in Table 7.9. Source - Insurances Table 7.9 Loan Conditions Assumed Front-end Commitment Repayment Interest fee fee period Share Amounts ($M) Bank A (BFA) 1.00% 0.00% 0.00% 30.0 years 74% Bank B (MFA) 7.00% 1.50% 1.00% 8.0 years 16% 52.0 Bank C (ICB) 10.00% 2.00% 1.50% 5.0 years 5% 15.1 Bank D (LCB) 10.00% 2.00% 1.50% 5.0 years 5% 14.1 Total 100% Average 2.479% 0.346% 0.246% Notes 1. The front-end fee will be charged only at the time of loan agreement. The commitment fee is charged against unused loan amount and will decrease gradually and end at null when the loan amount is fully disbursed. 2. Interest rates are constant and do not change during construction and during repayment period. 3. BFA: bilateral funding agencies, MFA: multilateral funding agencies, ICB: international commercial banks, LCB: local commercial banks It is assumed that three types of private properties are insured; the equity portion of the book value of the private assets, interest liabilities of SPCs for first 10 years of the commercial operation, and 100% of debt

50 liabilities of SPCs. The insurance premiums are assumed to be 2% p.a. for the all of the three. An example of the insurance premium scheduling is tabulated in Table No insurance is assumed for the private profit. Note that again no insurance is assumed for the Public Sub-program, where all of risks will be taken by the public sectors. (e) Table 7.10 Example of Insurance Premium Unit: US$ million Year Equity to be Insured Liabilities to be Insured Premium Premium Total Equity Profit Total Debt Interest Total Premium Tariffs Note: No insurance premium to be paid after The tariff is assumed to be 12$/ton under the Program for both of rail and port. It is assumed that this tariff is the only revenue source of the Program for the financial evaluation purpose. (f) Annual Operation and Maintenance (O&M) Costs For the O&M cost of the civil structures 0.5% of their construction cost per year is assumed every year. For that of non-civil facilities 2.0% of its procurement cost is assumed every year. The facility life is hypothesized to be 30 years for all of facility components. This facility life is identical to the Program life to be justified and no facility replacement is assumed. (g) Regional Community Contribution It is assumed that 1% of the sales revenue is paid to the regional community or government every year. (h) Depreciation and Amortization The following accounting expenses are assumed in the financial model:

51 (i) Table 7.11 Depreciation and Amortization Description Ratio Method Life 1. Railway track and control systems 100.0% Straight Line 30 years 2. Coal port 100.0% Straight Line 30 years 3. Unloading station and stock yard 100.0% Straight Line 30 years 4. Freight cars (rolling stocks) 100.0% Straight Line 30 years 5. Loading station 100.0% Straight Line 30 years Taxes The following tax conditions are assumed for the project implementation. VAT will be fully paid by SPC. 30% of profit tax to SPC for the BOO operation years. (3) Results of Financial Evaluation (a) Required Tariff When the unit transport price is constant at US$12/ton, the return on investment (ROI) meets 12.2% as tabulated in Table Table 7.12 Tariffs Required to Make the Program Financially Viable Unit Price FIRR ROI US$12/ton 10.1% 12.2% (b) Projected Cashflow Assuming US$12/ton of the constant tariff, the projected cashflow is tabulated in Table

52 Table 7.13 Projected Cashflow Unit: US$ million Expenditure Year Rail Other Debt Incom Repay Reven PAT Inv Comm Deprec Insur Total O&M O&M Inter Tax Total , , NPV , Notes Inv: Public and private investment Rail O&M: O&M costs for rails and rolling stocks Other O&M: O&M costs for non rail and non rolling stocks Comm: Community contribution Debt Inter: Interest for public and private loans Deprec: Depreciation cost Insur: Premium of private insurances Incom Tax: Corporate income tax Repay: Repayment of public and private loans Reven: Revenue expected from the entire Program PAT: Overall profit after tax NPV: Net present value with 10% of discount rate

53 (c) Internal Rate of Return The two sets of internal rates of return are given in Table 7.14 and Table Table 7.14 Financial Stream (FIRR) Unit: US$ million Cost Accum. Year Revenue Benefit Net Capital Rail O&M Other O&M Comm Tax Total Benefit , , , , ,218.4 Total , , ,218.4 NPV Financial IRR = 10.14% Notes Comm: Community contribution NPV: Net present value with 10% of discount rate

54 Table 7.15 Financial Stream (ROI) Unit: US$ million Year Investment Cash Generation Accum. Net Other Net Equity Loan Total Income Repay Interest Rail O&M Comm Insur Tax Total Benefit O&M Benefit , , , , , , , , , ,652.3 Total , , ,652.3 PV ROI = 12.16%

55 (d) Sensitivity The financial sensitivity is compared as given in Table The Cases 1 to 3 in the table are all based on the base case. Table 7.16 Sensitivity Case FIRR ROI Base Case 10.1% 12.2% Case 1: Construction cost increased by 10% 8.5% 10.7% Case 2: Tariff decreased by 10% 8.0% 10.3% Case 3: Case % 9.0% Proposed Tariff Structure When discussing the tariff structure, one can introduce two different types of compensation to SPCs. One is the Facility Fee, which is a set of tariffs required for compensating the railways and coal ports, and has no contribution to the coal transport. The other is the Transport Fee, which is translated into the tariffs that are required for operation of the coal transport. Since part of the O&M costs (variable O&M cost) and the regional community contribution cost directly correspond to the coal transport, these two sets of the costs may be referred to as the cost components of the Transport Fee. All other costs, that is, capital expenditure, fixed O&M cost, insurance premium, amortization and depreciation costs, income tax to SPCs, and return to investors, can be regarded as the Facility Fee. For the private project facilities, it is fair that the Facility Fee is to be paid as a fixed payment by the service off-taker to SPCs, as far as the private project facilities exist ready for the coal transport. As it is for coal transport, the Transport Fee may be paid by the service off-taker to SPCs on the basis of volume and distance of the coal actually transferred to the destination.

56 8. CONCLUSION AND NEXT STUDY 8.1 CONCLUSION It is mandatory for developing the inland coal mines to establish the efficient and cheap transportation systems composed with railway and coal terminal. This report proposes to expand the coal terminal at Balikpapan and to construct 170km railway from Balikpapan to Kotabangun via Samarinda. And the report shows that the coal terminal and railway project is feasible with the assumption of the transport volume of 10 million tons per year and the tariff of 12US$/ton including rail and port costs. The East Kalimantan Coal Transport Program composed with the Railway Project and the Coal Terminal Project shall be a Public-Private Partnership (PPP) based program. The railway track and coal port (part of coal terminal) entities are assumed to be public owned companies and the both operation entities assumed to be private companies. The Program Cost is assumed to correspond to the Public Sub-program and the Private Sub-program. The Public Sub-Program will need to be implemented by the Indonesian public sectors, with soft loans from foreign financing agencies, like JBIC and ADB. The Private Sub-program is assumed to be covered by equity investment by the investors and loans. For the equity portion of the private Sub-program, major part is expected to be invested by one of experienced foreign companies who have strong financial background. For the loan portion of Private Sub-program, a syndicate loan built by multilateral banks, bilateral banks, and commercial banks will be demanded. The following items shall be done to realize the improvement of coal transportation in East Kalimantan. - It is necessary to expand the coal terminal at Balikpapan, BPCT, to avoid the inefficiency of offshore coal transshipment from barge to ocean vessel. The investment of expansion of terminal and operation shall be done by private company, BPCT. - It is necessary to construct the railway from the mines at Mahakam River area to BPCT for the efficient use of coal terminal, BPCT and for the promotion of development of new coal mines at the hinterland of Mahakam River. - The construction of railway shall be done by government, central and local government. - The operation shall be done by new private company. The railway operation company should prepare the rolling stock for coal transportation and operate on the state owned railway infrastructure and pay the track access charge to the government. - ii -

57 8.2 NEXT STEP AND IMPLEMENTATION SCHEDULE The following items shall be done to realize the coal transportation project in East Kalimantan. (1) (2) (3) (4) (5) Feasibility study of coal transportation system including the expansion of coal terminal at Balikpapan Set up of entities for construction and operation of railway system. Raise the fund for the construction of railway infrastructure Implementation of construction of railway infrastructure Operation of railway system for coal transportation (1) Feasibility study: The first step of F/S is the study of the coal transportation volume prospect and the confirmation of the developing coal mines who will use the railway for coal transportation. The studies about the railway route, railway standard, construction volume including the area of land acquisition, construction cost, railway operation cost and financial and economical feasibility of railway project shall be done. The detailed study of expansion plan of the coal terminal of Balikpapan and investment program including the funding to keep the consistency between the railway transportation and coal terminal capacity. At the same time, the entities of construction and operation of railway shall be studied and shall be proposed the suitable organization of the entities. (2) The next step is the set up of entities for construction and operation of railway system This project shall be realized using a Public-Private-Partnership (PPP) scheme, the railway infrastructure entity is assumed to be public owned company. The entity of railway operation should be private entity which will be organized by the companies related to the coal mine, coal user, coal exporter and railway company. It is important to make up the consensus of the entities with the stakeholders. (3) The 3rt step is to raise the fund for construction of railway infrastructure The initial investment cost of construction of railway is enormous, therefore, the usage of soft loan such as Yen loan from JBIC or ADB loan shall be considered through Indonesian Government. - iii -

58 (4) The 4th step is construction of railway infrastructure The following items shall be done for the construction of railway infrastructure. - Employment of Consultant - Detailed design - Land acquisition - Tender and contract for construction work - Construction work (5) The final step is operation of railway system The entity of railway operation is quite new organization and has no experience of management and operation of railway system. The safe and steady operation of railway requires particular knowledge and technique, the Consultant shall advise and train the staff of railway operation organization and the training shall be started earlier stage of construction of railway infrastructure at site and at operation railway organization like PT.KA. The schedule of above mentioned items for the project implementation is shown in Figure Feasibility Study Detailed Design Tender Procedure Construction Stage Operation Figure 8.1 Implementation Schedule - iv -

59 - v -

60 - vi -

61

62 9. Coal Contract of Work % % IEO =1.5%/ Billion Short Tons 10 8 History High Economic Growth Reference Case Low Economic Growth Projections Year Source: International Energy Outlook 2004, IEO % IEO

63 (1) ( ) 389 Sumatra 2,825 4,258 9,015 13, Java % Kalimantan 2,505 6,640 14,573 21,213 5,000kcal/kg Others ,713 4,383 Total 5,368 11,569 27,306 38,875 (PTBA) 8.8% (KP Holder) (KUD) 50.5% 40.4% Coal Contract of Work West Sumatra Sout h Sumat ra Bengkulu 2003 South Kalimantan East Kalimantan % Japan % 4% Taiwan 90.9% 14% 20% Hongkong 15% 19% South Korea 7% 8% 10% India (2) (3) 2003 : 85.7 Others in Asia Europe Australia-America Others % - 2 -

64

年 1996 年 1997 年 1998 年 1999 年 2000 年

年 1996 年 1997 年 1998 年 1999 年 2000 年 1990 1,050 2000 7,644 2020 1 1,830 1990 94 2000 1,441 3 3 1 2 3 2 1. (1) 1981 1980 34 1990 1,000 2000 7,640 75 25 65.6 17.9 2000 5,769 3.5 1,370 23.7 1,284 22.3% 490 8.5% 3 3,140 55 1 1 1 100 80 73.8 76.4

More information

19 Figure-2 General Layout of Mahaica-Mahicony-Abary Lower River Basin Rural Development Plan Study Location Map of Cooperative Republic of Guyana PROJECT DIGEST 1. PROJECT TITLE : Mahaica-Mahaicony-Abary

More information

<95DB8C9288E397C389C88A E696E6462>

<95DB8C9288E397C389C88A E696E6462> 2011 Vol.60 No.2 p.138 147 Performance of the Japanese long-term care benefit: An International comparison based on OECD health data Mie MORIKAWA[1] Takako TSUTSUI[2] [1]National Institute of Public Health,

More information

NIES ASEAN4.. NIES.....EU.. ASEAN4 NIES

NIES ASEAN4.. NIES.....EU.. ASEAN4 NIES NIES ASEAN4.. NIES.....EU.. ASEAN4 NIES NIES ASEAN4 EU NIES ASEAN4 EU On-line UN Comtrade Database NIES NIES.AEAN4..EU.NIESASEAN4 NIES NIES ASEAN4. EU NIES ASEAN4. TPS: Toyota Production System.... Dunning

More information

041-057_’¼Œì

041-057_’¼Œì 542012 4157 Nishino Toshiaki The purpose of this paper is to analyze the present conditions of the mountain villages of Japan in the early 21 st century. The revolution of fuel sources from a predominance

More information

(Received December 22, 2000; accepted March 12, 2001) Gas field development projects of Nippon Oil Exploration Nobuyuki Sakata Abstract: Nippon Oil Ex

(Received December 22, 2000; accepted March 12, 2001) Gas field development projects of Nippon Oil Exploration Nobuyuki Sakata Abstract: Nippon Oil Ex (Received December 22, 2000; accepted March 12, 2001) Gas field development projects of Nippon Oil Exploration Nobuyuki Sakata Abstract: Nippon Oil Exploration Ltd. (NOEX), a subsidiary of Nippon Mitsubishi

More information

ñ{ï 01-65

ñ{ï 01-65 191252005.2 19 *1 *2 *3 19562000 45 10 10 Abstract A review of annual change in leading rice varieties for the 45 years between 1956 and 2000 in Japan yielded 10 leading varieties of non-glutinous lowland

More information

The Japanese economy in FY2015 suffered from sluggish growth in individual consumption, while the foreign exchange market remained unstable with high volatility. Even in such an economic environment, MSF

More information

,

, , The Big Change of Life Insurance Companies in Japan Hisayoshi TAKEDA Although the most important role of the life insurance system is to secure economic life of the insureds and their

More information

untitled

untitled Ministry of Land, Infrastructure, Transport and Tourism IATA 996 9 96 96 1180 11 11 80 80 27231 27 27231 231 H19.12.5 10 200612 20076 200710 20076 20086 11 20061192008630 12 20088 20045 13 113 20084

More information

_念3)医療2009_夏.indd

_念3)医療2009_夏.indd Evaluation of the Social Benefits of the Regional Medical System Based on Land Price Information -A Hedonic Valuation of the Sense of Relief Provided by Health Care Facilities- Takuma Sugahara Ph.D. Abstract

More information

Housing Purchase by Single Women in Tokyo Yoshilehl YUI* Recently some single women purchase their houses and the number of houses owned by single women are increasing in Tokyo. And their housing demands

More information

) ,

) , Vol. 2, 1 17, 2013 1986 A study about the development of the basic policy in the field of reform of China s sports system 1986 HaoWen Wu Abstract: This study focuses on the development of the basic policy

More information

„h‹¤.05.07

„h‹¤.05.07 Japanese Civilian Control in the Cold War Era Takeo MIYAMOTO In European and American democratic countries, the predominance of politics over military, i.e. civilian control, has been assumed as an axiom.

More information

840 Geographical Review of Japan 73A-12 835-854 2000 The Mechanism of Household Reproduction in the Fishing Community on Oro Island Masakazu YAMAUCHI (Graduate Student, Tokyo University) This

More information

JOURNAL OF THE JAPANESE ASSOCIATION FOR PETROLEUM TECHNOLOGY VOL. 66, NO. 6 (Nov., 2001) (Received August 10, 2001; accepted November 9, 2001) Alterna

JOURNAL OF THE JAPANESE ASSOCIATION FOR PETROLEUM TECHNOLOGY VOL. 66, NO. 6 (Nov., 2001) (Received August 10, 2001; accepted November 9, 2001) Alterna JOURNAL OF THE JAPANESE ASSOCIATION FOR PETROLEUM TECHNOLOGY VOL. 66, NO. 6 (Nov., 2001) (Received August 10, 2001; accepted November 9, 2001) Alternative approach using the Monte Carlo simulation to evaluate

More information

: , , % ,299 9, , % ,

: , , % ,299 9, , % , No. 22 March 2013 1. 1 2 3 4 2. 1 2 3. 1 2 2007 : 22 1980 51 1. 1 2008 : 170 4 5 2007 2007 2008 1 2008 6 2,592 205 2,900 0.33% 2009 7 6,299 9,300 238 2,600 0.31% 2010 254 1,700 2008 13.41 191.88 14 2010

More information

千葉県における温泉地の地域的展開

千葉県における温泉地の地域的展開 1) 1999 11 50 1948 23) 2 2519 9 3) 2006 4) 151 47 37 1.2 l 40 3.6 15 240 21 9.2 l 7. 210 1972 5) 1.9 l 5 1 0.2 l 6 1 1972 1.9 0.4 210 40-17- 292006 34 6 l/min.42 6) 2006 1 1 2006 42 60% 5060 4050 3040

More information

12_11B-5-00-omote※トンボ付き.indd

12_11B-5-00-omote※トンボ付き.indd Enquiry CEPA website (http://www.tid.gov.hk/english/cepa/index.html) provides information on the content and implementation details of various CEPA liberalisation and facilitative measures, including the

More information

JAPANESE SHIP-OWNERS AND WORLD BULK MARKET BETWEEN THE TWO WORLD WARS Mariko Tatsuki Keisen University After World War I, Japanese shipping suffered for a long time from an excess of tonnage and severe

More information

Title < 論文 > 公立学校における在日韓国 朝鮮人教育の位置に関する社会学的考察 : 大阪と京都における 民族学級 の事例から Author(s) 金, 兌恩 Citation 京都社会学年報 : KJS = Kyoto journal of so 14: 21-41 Issue Date 2006-12-25 URL http://hdl.handle.net/2433/192679 Right

More information

DR-6010Cユーザーガイド

DR-6010Cユーザーガイド U.S. GOVERNMENT RESTRICTED RIGHTS NOTICE: 1 2 3 4 5 6 7 WorldWide Consulting July 16, 2005 Regional performance As represented in the graph below, performance of subsidiaries operating in the three major

More information

Bull. of Nippon Sport Sci. Univ. 47 (1) Devising musical expression in teaching methods for elementary music An attempt at shared teaching

Bull. of Nippon Sport Sci. Univ. 47 (1) Devising musical expression in teaching methods for elementary music An attempt at shared teaching Bull. of Nippon Sport Sci. Univ. 47 (1) 45 70 2017 Devising musical expression in teaching methods for elementary music An attempt at shared teaching materials for singing and arrangements for piano accompaniment

More information

〈論文〉中部圏構想の断章と高速自動車道の建設

〈論文〉中部圏構想の断章と高速自動車道の建設 Abstract The main theme of this paper is the effect on trade caused by the process of establishing the Chubu Region Scheme as the third broad economic area in Japan followed by the Tokyo Metropolitan Area

More information

外国文学論集14号.indd

外国文学論集14号.indd 1876 1880 1 1930 1 1868 1930 1931 1945 1945 1989 1990 1868 1930 1930 1945 1945 1969 1970 1989 1990 1900 1901 1920 1946 1969 35 29 8.3 0.4 1908 1945 24 1951 1970 1931 1945 1951 5.6 27 0.8 1969 0.2 1910

More information

ON A FEW INFLUENCES OF THE DENTAL CARIES IN THE ELEMENTARY SCHOOL PUPIL BY Teruko KASAKURA, Naonobu IWAI, Sachio TAKADA Department of Hygiene, Nippon Dental College (Director: Prof. T. Niwa) The relationship

More information

テレビ番組による相互交流

テレビ番組による相互交流 Abstract: Import and Export of TV programs in Japan The TV programs for which contracts were concluded for export during fiscal 2001 included: Number of programs (number of titles) = 1,675 programs (series

More information

44 2012 2013 3 35 48 法人化後の国立大学の収入変動 37 法人化後の国立大学の収入変動 2009 2005 2010 2012 2012 2008 2009a 2010 16 18 17 20 2 4 2012 38 44 2012 17 22 (1) (2) 2012 5 GP COE 30 WPI 1 2012 17 22 16 17 22 17 17 19 2012 2012

More information

国土技術政策総合研究所 研究資料

国土技術政策総合研究所 研究資料 ISSN TECHNICAL NOTE of National Institute for Land and Infrastructure Management No255 September 2005 A Result of Investigation into the Actual Conditions of Japanese Ports Pavement and Cargo Handling

More information

untitled

untitled CAPEC, 2009 6 16 June 16, 2009 Page 1 CAPEC EMS 1. EMS USA EU 2. EMS 3. EMS 4. EMS 5. CAPEC 6. EMS June 16, 2009 Page 2 EMS EC 3 EMS EMS EMS EMS CAPEC EMS CAPEC EMS EMS June 16, 2009 Page 3 EU EU EC 1997/67/EC

More information

A Nutritional Study of Anemia in Pregnancy Hematologic Characteristics in Pregnancy (Part 1) Keizo Shiraki, Fumiko Hisaoka Department of Nutrition, Sc

A Nutritional Study of Anemia in Pregnancy Hematologic Characteristics in Pregnancy (Part 1) Keizo Shiraki, Fumiko Hisaoka Department of Nutrition, Sc A Nutritional Study of Anemia in Pregnancy Hematologic Characteristics in Pregnancy (Part 1) Keizo Shiraki, Fumiko Hisaoka Department of Nutrition, School of Medicine, Tokushima University, Tokushima Fetal

More information

This paper examines the difficulty of dark tourism from findings of the field survey on industrial heritage. Such difficulty comes from an unfavorable

This paper examines the difficulty of dark tourism from findings of the field survey on industrial heritage. Such difficulty comes from an unfavorable Whose gaze would find "darkness" of regional history? 2000 This paper examines the difficulty of dark tourism from findings of the field survey on industrial heritage. Such difficulty comes from an unfavorable

More information

,, 2024 2024 Web ,, ID ID. ID. ID. ID. must ID. ID. . ... BETWEENNo., - ESPNo. Works Impact of the Recruitment System of New Graduates as Temporary Staff on Transition from College to Work Naoyuki

More information

On the Wireless Beam of Short Electric Waves. (VII) (A New Electric Wave Projector.) By S. UDA, Member (Tohoku Imperial University.) Abstract. A new e

On the Wireless Beam of Short Electric Waves. (VII) (A New Electric Wave Projector.) By S. UDA, Member (Tohoku Imperial University.) Abstract. A new e On the Wireless Beam of Short Electric Waves. (VII) (A New Electric Wave Projector.) By S. UDA, Member (Tohoku Imperial University.) Abstract. A new electric wave projector is proposed in this paper. The

More information

No.75

No.75 2002.4.1 No.75 2 3 4 5 6 7 8 9 C AMPUS GUIDE 2 EV EV EV EV EV EV 3 4 5 1 1 2 3 4 5 CAMPUS GUIDE 10 11 C AMPUS GUIDE 12 University of Rome Tor Vergata, Italy () 13 14 () () 15 a 16 Issues of water resources

More information

Development of a Mine in Andes Mountains, Peru by Yumisaburo NURAI The development of Huanzala Mine was started in October 1966 after the completion of prospecting and production began at 500M.T./day crude

More information

remained dispersedly in the surrounding CBD areas. However, few hotels were located in the core of Sendai's CBD near the station because this area had

remained dispersedly in the surrounding CBD areas. However, few hotels were located in the core of Sendai's CBD near the station because this area had Journal of Geography 105(5) 613-628 1996 Locational Characteristics of Lodging Facilities in Sendai City Koumei MATSUMURA * Abstract The objective of this study is to examine the centrality of Sendai City

More information

PDF用-表紙.pdf

PDF用-表紙.pdf 51324544612009. 6 1 2 3 1 2 1 2 3 3 1 km 2 3 4 5 6 7 44 8 9 1700 1800 17001800 400km 1 45 1879 1903 1728 1734 10 11 1700 2 13199991995 12199821 200420101967 46 12 1771 1903 1 13 14 15 16 1819 2 17801860

More information

2 146

2 146 28 2004 pp. 145 159 1 Received October 29, 2004 In 1999, North Korea reversed the negative economic growth of the 90s, and displayed a positive trend which, although weak, was maintained at 1.8% in 2003.

More information

main.dvi

main.dvi FORMATH Vol. 8 (2009): 63 91 63 FAO, The Reporting Status of FAO Statistics on the Forest Resources and Forest Products Oka, Hiroyasu : : Abstract:,,, FAO (2005 ) (2006 ). FRA2005 7, 9. 99%,, FAO. 3/4,.,

More information

L1 What Can You Blood Type Tell Us? Part 1 Can you guess/ my blood type? Well,/ you re very serious person/ so/ I think/ your blood type is A. Wow!/ G

L1 What Can You Blood Type Tell Us? Part 1 Can you guess/ my blood type? Well,/ you re very serious person/ so/ I think/ your blood type is A. Wow!/ G L1 What Can You Blood Type Tell Us? Part 1 Can you guess/ my blood type? 当ててみて / 私の血液型を Well,/ you re very serious person/ so/ I think/ your blood type is A. えーと / あなたはとっても真面目な人 / だから / 私は ~ と思います / あなたの血液型は

More information

SPSS

SPSS The aging of residents who moved suburban new town in young is progressing. However, such residents tend to consider the service life of their houses only in terms of the time they will be occupying it.

More information

-October TPP ASEAN RCEP TPP MV Islamic State, IS EU EU EU EU EU

-October TPP ASEAN RCEP TPP MV Islamic State, IS EU EU EU EU EU AIIB BRICS TPP ASEAN ARF -October TPP ASEAN RCEP TPP MV Islamic State, IS EU EU EU EU EU EU EU UK MDGs AIIB BRICS ADB IT -October IoT Internet of Things Wearable AI IoT. GE IIC Finance+Technolpgy STEM

More information

The Tohoku Medical Megabank project is a part of the national project to reconstruct Tohoku area.. It aims to become a centripetal force for the reconstruction of Tohoku University Tohoku Medical Megabank

More information

October October October October Geoffrey M. White, White October Edward Relph,, Place and Placelessness, Pion limited October Geoffrey M. White,, National subjects September and Pearl Harbor, American

More information

A comparison of abdominal versus vaginal hysterectomy for leiomyoma and adenomyosis Kenji ARAHORI, Hisasi KATAYAMA, Suminori NIOKA Department of Obstetrics and Gnecology, National Maizuru Hospital,Kyoto,

More information

- March IMF IMF IMF ITO The General Agreement on Tariffs and Trade

- March IMF IMF IMF ITO The General Agreement on Tariffs and Trade M&A IMF IMF gold tranche - March IMF IMF IMF ITO The General Agreement on Tariffs and Trade IMF IMF IMF GATT OECD OECD BITs. - March. U I = I (r m, i, Z * r m i Z * (= Z / Z) I / r m > I / i < I / Z *

More information

1..FEM FEM 3. 4.

1..FEM FEM 3. 4. 008 stress behavior at the joint of stringer to cross beam of the steel railway bridge 1115117 1..FEM FEM 3. 4. ABSTRACT 1. BackgroundPurpose The occurrence of fatigue crack is reported in the joint of

More information

49148

49148 Research in Higher Education - Daigaku Ronshu No.24 (March 1995) 77 A Study of the Process of Establishing the Student Stipend System in the Early Years of the PRC Yutaka Otsuka* This paper aims at explicating

More information

(2) IPP Independent Power Producers IPP 1995 NCC(New Common Carrier NCC NTT NTT NCC NTT NTT IPP 2. IPP 2.1 1995 4 (3) [1] [2] IPP [2] IPP IPP [1] [2]

(2) IPP Independent Power Producers IPP 1995 NCC(New Common Carrier NCC NTT NTT NCC NTT NTT IPP 2. IPP 2.1 1995 4 (3) [1] [2] IPP [2] IPP IPP [1] [2] / 1995 Grid Access Model 1. (1) 22 1998 12 11 2000-1- (2) IPP Independent Power Producers IPP 1995 NCC(New Common Carrier NCC NTT NTT NCC NTT NTT IPP 2. IPP 2.1 1995 4 (3) [1] [2] IPP [2] IPP IPP [1] [2]

More information

16_.....E...._.I.v2006

16_.....E...._.I.v2006 55 1 18 Bull. Nara Univ. Educ., Vol. 55, No.1 (Cult. & Soc.), 2006 165 2002 * 18 Collaboration Between a School Athletic Club and a Community Sports Club A Case Study of SOLESTRELLA NARA 2002 Rie TAKAMURA

More information

3.持続可能な交通の国際比較

3.持続可能な交通の国際比較 43 SS Indices Related with Sustainable Transport and Comparison of the Actual Conditions Direction of Indices for Actual Status of Sustainable Transport Triple bottom line: Economic, Social, Environmental

More information

Highlights Employment increased in Ontario, Saskatchewan, and Manitoba. There was little change in the other provinces. More people were employed in c

Highlights Employment increased in Ontario, Saskatchewan, and Manitoba. There was little change in the other provinces. More people were employed in c 商工会事務局より (From Shokokai) カナダ統計局より 6 月雇用統計発表 : 失業率 6.0%(+0.2) Labour Force Survey: June Unemployment 6.0%(+0.2) 会員各位 7 月 6 日 カナダ統計局 (Statistics Canada) より 2018 年 6 月の雇用統計が発表になりました 下記概要ポイント仮訳は あくまで商工会事務局で訳したものであり英語の微妙な表現を保証したものではありません

More information

W W - W. m - km. km..c - mm. km. ,,. m/, -,, -,/m - -. - - W- kw - -. - / / - - - k rated output powerwww WWW kw kw kw kw k m/w W. m kw W m/ W - m m mw. m m kw kw W. m m W W kw kg kw kg kw kg kw, kg k

More information

Ł\”ƒ1PDFŠp

Ł\”ƒ1PDFŠp 48 2006 21 36 Koya KISHIDA, Shuji HISAMUNE, Toshihiko OSHIMA and Akira TAKEI Recently, when the accident occurs, the social influences of the accident became more and more severe. Keifuku Electric Railroad

More information

ERINA Report

ERINA Report The Developments in the Construction of Development Zones and in Japanese Enterprises in Greater Shenyang TSUKUBA Masayuki, Deputy Director, External Relations Division, and Associate Senior Researcher,

More information

rectomy as the subjects of study, urinary steroid hormones were measured, and simultaneously the enzyme work and enzyme pattern related to the steroid metabolism, as proposed by Yoshida of our laboratory,

More information

10-渡部芳栄.indd

10-渡部芳栄.indd COE GCOE GP ) b a b ) () ) () () ) ) .. () ) ) ) ) () ........... / / /.... 交付税額 / 経常費 : 右軸交付税額 /( 経常費 授業料 ): 右軸 . ) ()... /.. 自治体負担額 / 交付税額 : 右軸 ()......... / 自治体負担額 / 経常費 : 右軸 - No. - Vol. No. - IDE

More information

Title 生活年令による学級の等質化に関する研究 (1) - 生活年令と学業成績について - Author(s) 与那嶺, 松助 ; 東江, 康治 Citation 研究集録 (5): 33-47 Issue Date 1961-12 URL http://hdl.handle.net/20.500.12000/ Rights 46 STUDIES ON HOMOGENEOUS

More information

Sport and the Media: The Close Relationship between Sport and Broadcasting SUDO, Haruo1) Abstract This report tries to demonstrate the relationship be

Sport and the Media: The Close Relationship between Sport and Broadcasting SUDO, Haruo1) Abstract This report tries to demonstrate the relationship be Sport and the Media: The Close Relationship between Sport and Broadcasting SUDO, Haruo1) Abstract This report tries to demonstrate the relationship between broadcasting and sport (major sport and professional

More information

\ (1963): Recent Trends of Urban Geography in Japan A, A, A, G, 53 93^ 102 Yamaga S, & Y, Masai (1966) : Japanese Urban Geography-General View Japanese Geography 1966; Spec, Publ, No,1 Ass, Jap, Geogrs,

More information

ISSN ISBN C3033 The Institute for Economic Studies Seijo University , Seijo, Setagaya Tokyo , Japan

ISSN ISBN C3033 The Institute for Economic Studies Seijo University , Seijo, Setagaya Tokyo , Japan ISSN 2187 4182 ISBN 978 4 907635 09 1 C3033 The Institute for Economic Studies Seijo University 6 1 20, Seijo, Setagaya Tokyo 157-8511, Japan ISSN 2187 4182 ISBN 978 4 907635 09 1 C3033 The Institute

More information

03-はじめに目次2018.indd

03-はじめに目次2018.indd 2 I Main Chapter I Overview of Trade 3 172783.9 2881. 78.3 12 2 5.22 15.1714.9215 17 16 1 36 * Overview of Trade 1.Exports: Exports turn upward after 1-year decline In 217, Japan's exports increased after

More information

学位研究17号

学位研究17号 1715 3 The Student Transfer and the Articulation System in Chinese Higher Education HUANG Meiying Research in Academic Degrees, No. 17 March, 2003the article The Journal on Academic Degrees of National

More information

soturon.dvi

soturon.dvi 12 Exploration Method of Various Routes with Genetic Algorithm 1010369 2001 2 5 ( Genetic Algorithm: GA ) GA 2 3 Dijkstra Dijkstra i Abstract Exploration Method of Various Routes with Genetic Algorithm

More information

43 + +* / +3+0,, 22*,, ++..0/ / 1/. / / + /* *,* +* *.* /* 0 +0 2*,/./ +3+,. + : / 3 / +** +**, // /. /+ /+ + * * + +2 +2 +3,* 3 3 ++ +, 0.. /3 : +/,.

43 + +* / +3+0,, 22*,, ++..0/ / 1/. / / + /* *,* +* *.* /* 0 +0 2*,/./ +3+,. + : / 3 / +** +**, // /. /+ /+ + * * + +2 +2 +3,* 3 3 ++ +, 0.. /3 : +/,. 42 * :. +, / /0/ ha, +. 2, 2ha. + : :, / /0/ +3,2. 2 / * 43 + +* / +3+0,, 22*,, ++..0/ / 1/. / / + /* *,* +* *.* /* 0 +0 2*,/./ +3+,. + : / 3 / +** +**, // /. /+ /+ + * * + +2 +2 +3,* 3 3 ++ +, 0.. /3

More information

....

.... WHO .... http:// www8.cao.go.jp / kourei / ishiki / h15_sougou / gaiyou.html QOL ADL SL SL SL JR SL N ... ... m. m... . N....... ... N .. kg kg.. ... .... .... ... m.. . .. .. N..... .. . N..

More information

Table 1 Utilization of Data for River Water Table 2 Utilization of Data for Groundwater Quality Analysis5,6,9,10,13,14) Quality Analysis5-13) Fig. 1 G

Table 1 Utilization of Data for River Water Table 2 Utilization of Data for Groundwater Quality Analysis5,6,9,10,13,14) Quality Analysis5-13) Fig. 1 G Key Words: river water quality, groundwater quality, manpower development, sewerage Table 1 Utilization of Data for River Water Table 2 Utilization of Data for Groundwater Quality Analysis5,6,9,10,13,14)

More information

きずなプロジェクト-表紙.indd

きずなプロジェクト-表紙.indd P6 P7 P12 P13 P20 P28 P76 P78 P80 P81 P88 P98 P138 P139 P140 P142 P144 P146 P148 #1 SHORT-TERM INVITATION GROUPS 2012 6 10 6 23 2012 7 17 14 2012 7 17 14 2012 7 8 7 21 2012 7 8 7 21 2012 8 7 8 18

More information

1 2 1 2012 39 1964 1997 1 p. 65 1 88 2 1 2 2 1 2 5 3 2 1 89 1 2012 Frantzen & Magnan 2005 2010 6 N2 2014 3 3.1 2015 2009 1 2 3 2 90 2 3 2 B1 B1 1 2 1 2 1 2 1 3.2 1 2014 2015 2 2 2014 2015 9 4.1 91 1 2

More information

Fig. 1 Schematic construction of a PWS vehicle Fig. 2 Main power circuit of an inverter system for two motors drive

Fig. 1 Schematic construction of a PWS vehicle Fig. 2 Main power circuit of an inverter system for two motors drive An Application of Multiple Induction Motor Control with a Single Inverter to an Unmanned Vehicle Propulsion Akira KUMAMOTO* and Yoshihisa HIRANE* This paper is concerned with a new scheme of independent

More information

KII, Masanobu Vol.7 No Spring

KII, Masanobu Vol.7 No Spring KII, Masanobu 1 2 3 4 5 2 2.1 1945 60196075 19759019904 002 Vol.7 No.1 2004 Spring 1194560 1 1946 2 195328 3 4 1958 1960 2196075 5 6 7 8 1946 2 1972 1/23/4 1974 1968481973 1969 3197590 9 1980 1987 41990

More information

206“ƒŁ\”ƒ-fl_“H„¤‰ZŁñ

206“ƒŁ\”ƒ-fl_“H„¤‰ZŁñ 105 206 105 117 2007 105 3 LCC 110 106 LCC 111 106 1 111 107 2 112 1 107 3 114 2 108 115 109 115 1 LCC 110 Summary 117 2 110 2005 3 LCC 19 3 6 LCC LCC LCC 1.0 2 3, 1997 B/C Cost Benefit Ratio 1997 NPV

More information

A5 PDF.pwd

A5 PDF.pwd DV DV DV DV DV DV 67 1 2016 5 383 DV DV DV DV DV DV DV DV DV 384 67 1 2016 5 DV DV DV NPO DV NPO NPO 67 1 2016 5 385 DV DV DV 386 67 1 2016 5 DV DV DV DV DV WHO Edleson, J. L. 1999. The overlap between

More information

Studies of Foot Form for Footwear Design (Part 9) : Characteristics of the Foot Form of Young and Elder Women Based on their Sizes of Ball Joint Girth

Studies of Foot Form for Footwear Design (Part 9) : Characteristics of the Foot Form of Young and Elder Women Based on their Sizes of Ball Joint Girth Studies of Foot Form for Footwear Design (Part 9) : Characteristics of the Foot Form of Young and Elder Women Based on their Sizes of Ball Joint Girth and Foot Breadth Akiko Yamamoto Fukuoka Women's University,

More information

;~ (Summary) The Study on the Effects of Foot Bathing on Urination Kumiko Toyoda School of Human Nursing, University of Shiga Prefecture Background Foot bathing is one of the important nursing care for

More information

untitled

untitled 総 研 大 文 化 科 学 研 究 第 8 号 (2012) 117 ......... : ; : : : : ; : 118 総 研 大 文 化 科 学 研 究 第 8 号 (2012) 堀 田 モノに 執 着 しないという 幻 想, National Statistical Office of Mongolia, 総 研 大 文 化 科 学 研 究 第 8 号 (2012) 119 E A B

More information

11モーゲージカンパニー研究論文.PDF

11モーゲージカンパニー研究論文.PDF 2003 Outline of the Study 1. Purpose Housing finance in Japan is now at a turning point because the Government Housing Loan Corporation (the HLC) is scheduled to become an independent administrative

More information

43-22005 1436382,149,693 4 5 1981 713,787 615,989226,381 405,232 302,200168,955 117,178 105,47551.1 108 5511358551 1351131950 510450100 1990 19942,464

43-22005 1436382,149,693 4 5 1981 713,787 615,989226,381 405,232 302,200168,955 117,178 105,47551.1 108 5511358551 1351131950 510450100 1990 19942,464 The Regional Structure of Car Industry in China Yoshiyuki KITAMURA 1 1956 2 20051979 1980 20 1990 2006 1993 19982003a2000 2005 2003200421 2003 3 2,037,865 4,443,52245.92,443 115 129 43-22005 1436382,149,693

More information

自分の天職をつかめ

自分の天職をつかめ Hiroshi Kawasaki / / 13 4 10 18 35 50 600 4 350 400 074 2011 autumn / No.389 5 5 I 1 4 1 11 90 20 22 22 352 325 27 81 9 3 7 370 2 400 377 23 83 12 3 2 410 3 415 391 24 82 9 3 6 470 4 389 362 27 78 9 5

More information

 

  (2015.02.20) S-1 Summary Low Carbon 3R Technology and System Verification Project in the year 2015 (Windshield Recycle Project, Matec Inc.) 1. Overview of the project Glass, exempted from collection

More information

untitled

untitled Bloomberg ARES Price Book-value Ratio J BA A * 201226 20 2241214 1 J 25 90 90 () 15 10090 10090 () 147 A A B B A A B B A A B ToSTNet 2 2-3 2 4-6 191 9 192 11 1 p16 H20.12 H20.11 H20.10 H20.3 H19.11

More information

,,.,,.,..,.,,,.,, Aldous,.,,.,,.,,, NPO,,.,,,,,,.,,,,.,,,,..,,,,.,

,,.,,.,..,.,,,.,, Aldous,.,,.,,.,,, NPO,,.,,,,,,.,,,,.,,,,..,,,,., J. of Population Problems. pp.,.,,,.,,..,,..,,,,.,.,,...,.,,..,.,,,. ,,.,,.,..,.,,,.,, Aldous,.,,.,,.,,, NPO,,.,,,,,,.,,,,.,,,,..,,,,., ,,.,,..,,.,.,.,,,,,.,.,.,,,. European Labour Force Survey,,.,,,,,,,

More information

人文地理62巻4号

人文地理62巻4号 4 4 4 4 4 4 An Examination of the Agglomeration Economies Reinforcing Creativity in the Cultural Industry HANZAWA Seiji Meiji Gakuin University The recent rise of the cultural industry, resulting

More information

MRI | 所報 | 分権経営の進展下におけるグループ・マネジメント

MRI  | 所報 | 分権経営の進展下におけるグループ・マネジメント JOURNAL OF MITSUBISHI RESEARCH INSTITUTE No. 35 1999 (03)3277-0003 FAX (03)3277-0520 E-mailprd@mri.co.jp 76 Research Paper Group Management in the Development of Decentralized Management Satoshi Komatsubara,

More information

Huawei G6-L22 QSG-V100R001_02

Huawei  G6-L22 QSG-V100R001_02 G6 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 1 2 3 17 4 5 18 UI 100% 8:08 19 100% 8:08 20 100% 8:08 21 100% 8:08 22 100% 8:08 ********** 23 100% 8:08 Happy birthday! 24 S S 25 100% 8:08 26 http://consumer.huawei.com/jp/

More information

untitled

untitled () 2006 i Foundationpowdermakeup No.1 ii iii iv Research on selection criterion of cosmetics that use the consumer's Eras analysis Consideration change by bringing up child Fukuda Eri 1.Background, purpose,

More information

農林水産政策研究所レビューNo.11

農林水産政策研究所レビューNo.11 1 3 9 16 25 38 47 55 62 64 65 66 67 68 t69 70 71 72 73 73 89 90 91 et al. et al. Journal of Consumer Research Stated Choice Methods : Analysis and Applications è

More information

bosai-2002.dvi

bosai-2002.dvi 45 B-2 14 4 Annuals of Disas. Prev. Res. Inst., Kyoto Univ., No. 45 B-2, 22 5 m 5 m :,,, 1. 2. 2.1 27 km 2 187 km 2 14 % 77 % 47 7, 9 2, 54 6 7, 9 16, 57 8 1, 9 47 2 1 57 5 2.2 45 2 Fig. 1 2 2.3 Fig. 2

More information

2

2 2011 8 6 2011 5 7 [1] 1 2 i ii iii i 3 [2] 4 5 ii 6 7 iii 8 [3] 9 10 11 cf. Abstracts in English In terms of democracy, the patience and the kindness Tohoku people have shown will be dealt with as an exception.

More information

大学論集第42号本文.indb

大学論集第42号本文.indb 42 2010 2011 3 279 295 COSO 281 COSO 1990 1 internal control 1 19962007, Internal Control Integrated Framework COSO COSO 282 42 2 2) the Committee of Sponsoring Organizations of the Treadway committee

More information

Repatriation and International Development Assistance: Is the Relief-Development Continuum Becoming in the Chronic Political Emergencies? KOIZUMI Koichi In the 1990's the main focus of the global refugee

More information

ユーザーズマニュアル

ユーザーズマニュアル 1 2 3 4 This product (including software) is designed under Japanese domestic specifications and does not conform to overseas standards. NEC *1 will not be held responsible for any consequences resulting

More information

デフレの定義(最新版).PDF

デフレの定義(最新版).PDF DP/01-1 Director General for Economic Assessment and Policy Analysis CABINET OFFICE E-mail : naoki.okamoto@mfs.cao.go.jp 1 2 3 i (ii) 4 5 Deflation defined as at least two consecutive years of price decreases.

More information

九州大学学術情報リポジトリ Kyushu University Institutional Repository 看護師の勤務体制による睡眠実態についての調査 岩下, 智香九州大学医学部保健学科看護学専攻 出版情報 : 九州大学医学部保健学

九州大学学術情報リポジトリ Kyushu University Institutional Repository 看護師の勤務体制による睡眠実態についての調査 岩下, 智香九州大学医学部保健学科看護学専攻   出版情報 : 九州大学医学部保健学 九州大学学術情報リポジトリ Kyushu University Institutional Repository 看護師の勤務体制による睡眠実態についての調査 岩下, 智香九州大学医学部保健学科看護学専攻 https://doi.org/10.15017/4055 出版情報 : 九州大学医学部保健学科紀要. 8, pp.59-68, 2007-03-12. 九州大学医学部保健学科バージョン : 権利関係

More information

A Feasibility Study of Direct-Mapping-Type Parallel Processing Method to Solve Linear Equations in Load Flow Calculations Hiroaki Inayoshi, Non-member

A Feasibility Study of Direct-Mapping-Type Parallel Processing Method to Solve Linear Equations in Load Flow Calculations Hiroaki Inayoshi, Non-member A Feasibility Study of Direct-Mapping-Type Parallel Processing Method to Solve Linear Equations in Load Flow Calculations Hiroaki Inayoshi, Non-member (University of Tsukuba), Yasuharu Ohsawa, Member (Kobe

More information

(1) 24 ICU (2)X (3)ICU (4)PMS E/S E/S 1.4 DGMC , AD 1 A 4 2

(1) 24 ICU (2)X (3)ICU (4)PMS E/S E/S 1.4 DGMC , AD 1 A 4 2 2003 7 1.1 1994 5 *1 94 E/S *2 5 1 1.2 1.3 1 P3 2 1 (1) 24 ICU (2)X (3)ICU (4)PMS E/S E/S 1.4 DGMC 1.5 47 700 46 1,900 1996 12 1996 12 2.7 30 10 2001 12 2.1 2.1.1. AD 1 A 4 2 60 B 5 12 B DGMC 12 B 2.1.2.

More information

ルーカス型総供給方程式の批判的吟味

ルーカス型総供給方程式の批判的吟味 1 ABSTRACT A detailed analysis on some special characteristics of Lucas's ASL/LAS under generalized conditions: a synthetic understanding of both Lucasian and Keynesian systems by Haruki Niwa First of

More information

高齢化とマクロ投資比率―国際パネルデータを用いた分析―

高齢化とマクロ投資比率―国際パネルデータを用いた分析― 196 2017 * ** ** ** ** 160 2 2 JEL Classification Codes E21, E22, J11 Keywords * ESRI 28 ESRI 29 3 17 ESRI ** 115 196 Population Aging and Domestic Investment An Analysis Using International Panel Data

More information

ABSTRACT The "After War Phenomena" of the Japanese Literature after the War: Has It Really Come to an End? When we consider past theses concerning criticism and arguments about the theme of "Japanese Literature

More information